Delhi NCR Infrastructure Dashboard
National Capital Region multi-state transit ecosystem featuring Delhi-Mumbai Expressway origins, DMRC Metro, RRTS semi-high-speed trains, and outer circumferential expressways.
State Macro Infrastructure Specs
Delhi NCR Infrastructure Sponsor
Verified PartnerDelhi NCR Infrastructure Route Map
State Transit & Logistics Sponsor
Verified PartnerCorridors & Mega Projects in Delhi NCR
Shamli Gorakhpur Expressway
The Shamli Gorakhpur Expressway is a proposed greenfield expressway corridor in Uttar Pradesh designed to improve east-west connectivity between western and eastern regions of the state. The project is frequently searched as the Gorakhpur Shamli Expressway, Shamli Gorakhpur Route and UP Greenfield Expressway. This page tracks the Shamli Gorakhpur Expressway Route Map, alignment, districts covered, package-wise progress, land acquisition status, contractors, construction developments and latest project updates.
Meerut Metro Rail Network
Meerut Metro rapid transit system operating along the Delhi–Meerut RRTS corridor infrastructure spanning 23 km across 13 stations.
Delhi Mumbai Expressway
Also known as दिल्ली मुंबई एक्सप्रेसवे, India's flagship 1,350 km access-controlled greenfield expressway connecting Delhi NCR with Mumbai and JNPT, designed to reduce travel time, improve freight movement, and transform regional connectivity across six states.
High-Speed Rail Network (India)
The High-Speed Rail Network of India represents the national master plan to construct over 9,000 km of bullet train corridors interconnecting all major metropolitan regions under the Diamond Quadrilateral and National Rail Plan 2030.
Jaipur–Bandikui Greenfield Expressway (NE-4C)
The Jaipur–Bandikui Greenfield Expressway (National Expressway 4C / NE-4C) is a 67 km 4-lane access-controlled greenfield expressway developed by NHAI. Acting as the dedicated Jaipur spur of the Delhi–Mumbai Expressway, it connects the DME interchange at Bandikui directly to Bagrana / Ring Road near Jaipur, reducing driving time between Delhi NCR and Jaipur to just 3.5 hours.
Delhi–Meerut Expressway (NE-3)
The Delhi–Meerut Expressway (National Expressway 3 / NE-3) is a 96 km access-controlled expressway connecting Sarai Kale Khan / Nizamuddin in Delhi to Partapur in Meerut, Uttar Pradesh. Featuring India's widest 14-lane corridor from Delhi to Dasna (including 6 dedicated expressway lanes and 8 service highway lanes) and automated ANPR tolling, it has reduced commute times between Delhi and Meerut to just 45 minutes.
Delhi–Panipat Expressway (NH-44)
The Delhi–Panipat Expressway (Grand Trunk Road section of NH-44) is a heavily engineered 70.5 km 8-lane access-controlled corridor connecting Mukarba Chowk in North Delhi with Panipat in Haryana. Upgraded with extensive flyovers, grade separators, and bypass structures at major urban choke points such as Singhu, Sonipat, and Samalkha, the corridor provides seamless high-speed connectivity towards Punjab, J&K, and Himachal Pradesh.
Delhi–Faridabad–Sohna Expressway (NH-148NA)
The Delhi–Faridabad–Sohna Expressway (National Highway 148NA / DND Flyway extension) is a 59 km 6-lane access-controlled spur connecting Maharani Bagh / DND in South Delhi directly with the Delhi–Mumbai Expressway mainline at Sohna via Faridabad and Ballabhgarh. Designed to provide non-stop high-speed access to the national corridor while completely bypassing Mathura Road, the project features extensive elevated viaducts.
Delhi–Gurgaon Expressway
The Delhi–Gurgaon Expressway is a vital 27.7 km 8-to-10 lane access-controlled arterial highway on NH-48 connecting Dhaula Kuan in Delhi to Kherki Daula in Gurugram, Haryana. Serving as the primary vehicular spine connecting the Indira Gandhi International (IGI) Airport, DLF Cyber City, and Manesar industrial hub, it carries over 250,000 vehicles daily.
Sohna Elevated Corridor (NH-248A)
The Sohna Elevated Corridor (NH-248A) is a 21.66 km 6-lane access-controlled highway featuring an 8.9 km elevated viaduct connecting Rajiv Chowk in Gurugram to Sohna. Fully commissioned in July 2022 by NHAI, it serves as the crucial feeder corridor directly linking Delhi-NCR with the main Delhi–Mumbai Expressway.
Delhi Dehradun Expressway
The Delhi–Dehradun Expressway (Delhi–Saharanpur–Dehradun Economic Corridor) is a 213 km 6-lane access-controlled greenfield highway connecting Akshardham in Delhi to Dehradun in Uttarakhand. Featuring Asia's longest 12 km elevated wildlife corridor passing over the Rajaji National Park and an eco-friendly Dat Kali tunnel, the expressway slashes commute times between Delhi and Dehradun from 6 hours to under 2.5 hours.
Yamuna Expressway (Taj Expressway)
The Yamuna Expressway (formerly Taj Expressway) is a 165.537 km, 6-lane (expandable to 8) access-controlled concrete expressway in Uttar Pradesh connecting Zero Point / Pari Chowk in Greater Noida to Kuberpur (NH-19) in Agra. Built at an outlay of ₹12,839 Crore on a 36-year BOT toll concession by Jaypee Infratech Ltd under YEIDA oversight, it opened on 9 August 2012 to decongest old NH-2 and now serves as the flagship highway spine for Noida International Airport (Jewar).
Noida–Greater Noida Expressway
The Noida–Greater Noida Expressway (NGN Expressway) is a 24.53 km, 6-lane access-controlled, toll-free highway connecting Noida (Mahamaya Flyover, Sector 15A/16A) to Greater Noida (Pari Chowk / Yamuna Expressway Zero Point). Built in 2002 at an original outlay of ₹400 Crore to relieve old NH-2, it serves as the primary urban mobility artery across Sectors 44, 93, 96, 128, 132, 142, 148, and 150, flanked by the Noida Metro Aqua Line.
Hindon Elevated Road
The Hindon Elevated Road in Ghaziabad is a grade-separated elevated expressway connecting UP Gate (Delhi–UP Border / NH-9) directly to Raj Nagar Extension. Built by Navayuga Engineering Company Limited for the Ghaziabad Development Authority (GDA) on 227 single-pier pillars (as reported on ghaziabad.nic.in) at a total cost of ₹1,147 Crore, the completed corridor operates as a 6-lane facility (10.3 km in Environmental Clearance filings; 10.5 km on the Ghaziabad official district portal) and remains toll-free since opening on 30 March 2018. GDA has also floated Tender Ref 667/4/PA-T/2025-26 (ID: 2026GDAUP1143773_1) at an ₹80.37 Crore estimated tender value (separate from ~₹90 Crore overall reported press estimates) to add slip-road ramps for Indirapuram and Vasundhara.
Delhi–Noida Direct Flyway
The Delhi–Noida Direct Flyway (DND Flyway) is an 8-lane access-controlled, 7.5 km (4.7 mi) highway facility (comprising a 6.0 km main carriageway and a 1.5 km Mayur Vihar Link) developed by Noida Toll Bridge Company Limited (NTBCL) across the Yamuna River, connecting Maharani Bagh and Ashram in South Delhi to Film City and Sector 16A in Noida. While commuters commonly refer to the route as the Delhi Noida Expressway, it is distinct from the 24.5 km Noida–Greater Noida Expressway extending south from Sector 16A. Formally inaugurated on 24 January 2001 and opened for commercial operations on 7 February 2001, the corridor has operated completely toll-free since October 2016 following an Allahabad High Court ruling, which the Supreme Court of India upheld in December 2024.
Noida–Bhangel Elevated Corridor
Constructed along the Dadri–Surajpur–Chhalera (DSC) Marg by UPSBCL for the Noida Authority, the 6-lane toll-free Bhangel Elevated Road spans 4.5 km (5.5 km total corridor footprint with approaches) from Agahpur (Sector 51/41 Vikas Marg) to NSEZ (Sector 82). Opened for trial runs on November 18, 2025 and regular traffic in January 2026 at a revised cost of ₹608.08 Crore (up from ₹468.30 Crore in June 2020), it reduces commute time from ~40 minutes to ~5 minutes, while ₹51.84 Crore loop ramps at Sector 49/107 (August 2028 target) and ₹25 Crore IIT Delhi-vetted sound barriers are under execution.
B2B EPC & Materials Partner
Verified Partner