Delhi–Meerut Expressway (NE‑3) Route Map, Toll Rates, Status & Latest Updates (2026)

Last Updated: 3 November 2026
StatusFully Operational
Length82 km
Corridor StatusAll 4 Packages Open (100%)
CompletionApril 2021
Last Updated3 November 2026

The Delhi–Meerut Expressway (National Expressway 3 / NE-3) is a 96 km access-controlled expressway connecting Sarai Kale Khan / Nizamuddin in Delhi to Partapur in Meerut, Uttar Pradesh. Featuring India's widest 14-lane corridor from Delhi to Dasna (including 6 dedicated expressway lanes and 8 service highway lanes) and automated ANPR tolling, it has reduced commute times between Delhi and Meerut to just 45 minutes.

Project Summary

Designed to decongest the heavily trafficked NH-24 (now NH-9) corridor across the National Capital Region, the ₹8,346-crore Delhi–Meerut Expressway (NE-3) combines brownfield highway expansion with greenfield expressway construction across four distinct packages. The inner six lanes between Sarai Kale Khan and Dasna operate as an access-controlled expressway flanked by four outer highway lanes on each side (14 lanes total), before branching at Dasna into a 31.78 km greenfield alignment to Partapur in Meerut and a 22.23 km six-lane highway upgrade to Hapur.

दिल्ली मेरठ एक्सप्रेसवे (National Expressway 3)

दिल्ली मेरठ एक्सप्रेसवे (NE-3) 96 किमी लंबा आधुनिक एक्सप्रेसवे है जो दिल्ली से मेरठ के बीच यात्रा समय को मात्र 45 मिनट में पूरा करता है।

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length82 km
Estimated Cost₹8,346 Crore
Implementing AgencyNHAI
Current StatusFully Operational
CompletionApril 2021
Route Map

Delhi–Meerut Expressway (NE-3) Route Map & Alignment

View and download the latest Delhi–Meerut Expressway (NE-3) route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Delhi–Meerut Expressway (NE-3) Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameDelhi–Meerut Expressway (NE-3)
Total Length82 km
Estimated Cost₹8,346 Crore
Current StatusFully Operational
* Note: The government-reported total capital cost of ₹8,346 crore covers the full ~82 km corridor scope (approximately 60 km access-controlled expressway and 22 km upgraded National Highway). Packages 1 and 2 form the approximately 28 km Delhi–Dasna section (six-lane expressway alongside the eight-lane NH-24 corridor). Package 3 covers the 22.23 km upgraded Dasna–Hapur NH-24 section, while Package 4 is the dedicated 31.78 km greenfield Dasna–Meerut expressway. These package lengths represent the overall project scope and should not be interpreted as four consecutive sections of a single alignment.
Project Parameters & Technical Details

Delhi–Meerut Expressway (NE-3)Cost • Route • Timeline

ParameterTechnical Details
Package 18.72 km | Sarai Kale Khan / Nizamuddin to Ghazipur (Delhi–UP border) | Six-lane expressway alongside the existing eight-lane highway corridor
Package 219.28 km | Ghazipur / UP border to Dasna | Six-lane expressway alongside the existing NH-24 corridor
Package 322.23 km | Dasna to Hapur | Six-laning of existing NH-24 with service roads (upgraded highway section)
Package 431.78 km | Greenfield alignment from Dasna towards Meerut / Partapur | Six-lane access-controlled expressway
Toll SystemDistance-based closed tolling with FASTag tracking; ANPR piloted on sections
Travel TimeApproximately 50 minutes under favourable traffic conditions (reduced from 2.5 hours on older route)
Project NameDelhi–Meerut Expressway (NE-3)
Project TypeExpressway and National Highway improvement
Total Length82 km (approximately 60 km access-controlled expressway + 22 km upgraded National Highway)
Current StatusFully Operational
Estimated Cost₹8,346 Crore
Target CompletionApril 2021
Lane ConfigurationCombined 14-lane configuration on Delhi–Dasna section (six-lane expressway alongside eight-lane NH-24); dedicated six-lane greenfield expressway from Dasna to Meerut
Operational StatusOperational (Full corridor opened to traffic 1 April 2021)
Package Scope NotePackages 1 and 2 form the approximately 28 km Delhi–Dasna section. Package 3 covers the upgraded Dasna–Hapur NH-24 section, while Package 4 is the greenfield Dasna–Meerut expressway. These package lengths represent the overall project scope and should not be interpreted as four consecutive sections of a single alignment.
Total Capital Cost₹8,346 crore
Implementing AgencyNational Highways Authority of India (NHAI)
Major Access Points7 Major access points: Sarai Kale Khan, Indirapuram, Dundahera, Dasna, Rasoolpur Sikrod, Bhojpur, Kashi Toll Plaza
Construction Packages4 Packages (82.01 km total scope)
Implementing AuthorityNHAI
Reported Effective 1 April 2026

Distance-Based Closed Toll Schedule

Published FY 2026–27 user fees for the Delhi–Meerut Expressway (NE-3). The corridor uses distance-based closed tolling with FASTag-based entry and exit tracking at Kashi Toll Plaza:

Fee Plazas on Corridor (NETC / NPCI Master)
1 Toll Point
No.Toll Plaza NamePlaza Code / ChainageInterchange Details & Connectivity
1Kashi Toll PlazaPlaza 1Meerut-side toll and access point towards the Partapur terminal and Meerut road network.
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→
Delhi–Meerut Expressway Access Points

Major Entry and Exit Points

The Delhi–Meerut Expressway features designated entry and exit points connecting major NCR towns and local arterial roads:

  • Sarai Kale Khan / Nizamuddin: Delhi-side starting point near the Nizamuddin Bridge and Ring Road.
  • Indirapuram: Access point serving Ghaziabad's residential and commercial areas.
  • Dundahera: Access serving the Vijay Nagar and Crossings Republik areas.
  • Dasna Interchange: Major junction connecting the expressway with NH-9 and the Eastern Peripheral Expressway network.
  • Rasoolpur Sikrod: Access point on the greenfield Dasna–Meerut section.
  • Bhojpur: Access point serving Modinagar and nearby areas.
  • Kashi Toll Plaza: Meerut-side toll and access point towards the Partapur terminal and Meerut road network.
Districts & Regions Traversed

District Coverage & Route Alignment

The ~82 km highway corridor traverses 4 administrative regions across Delhi and western Uttar Pradesh across 4 construction packages:

East / South East Delhi (NCT)
Package 1 (8.72 km)

Sarai Kale Khan to UP Gate / Ghazipur border

Ghaziabad District (UP)
Package 2 (19.28 km)

UP Gate to Dasna & sections of Packages 3 and 4

Hapur District (UP)
Package 3 (22.23 km)

Upgraded 6-lane NH-24/NH-9 corridor from Dasna to Hapur

Meerut District (UP)
Package 4 (31.78 km)

6-lane greenfield expressway from Dasna to Partapur, Meerut

Corridor Trajectory

Route Alignment & Scope

The Delhi–Meerut Expressway connects Sarai Kale Khan in Delhi with Partapur in Meerut. The first 28 km between Delhi and Dasna (Packages 1 & 2) features a combined 14-lane configuration (six-lane expressway alongside the eight-lane NH-24 corridor). At Dasna, the project branches: Package 3 (22.23 km) comprises the upgraded six-lane NH-24 highway to Hapur, while Package 4 (31.78 km) is the six-lane dedicated greenfield expressway connecting Dasna directly with Meerut near Partapur.

Travel Advisory

Travel Time

The Delhi–Meerut Expressway has reduced the journey time between Delhi and Meerut from approximately 2.5 hours on the older route to around 50 minutes under favourable traffic conditions. Actual travel time may vary depending on congestion, weather, road restrictions and the selected entry and exit points.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Delhi–Meerut Expressway (NE-3) is approximately 82 km long. The project includes around 60 km of access-controlled expressway development and 22 km of upgraded National Highway sections connecting Delhi with Meerut.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Delhi NCR Dashboard →DL
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement