Verified PartnerDelhi–Meerut Expressway (NE‑3) Route Map, Toll Rates, Status & Latest Updates (2026)
The Delhi–Meerut Expressway (National Expressway 3 / NE-3) is a 96 km access-controlled expressway connecting Sarai Kale Khan / Nizamuddin in Delhi to Partapur in Meerut, Uttar Pradesh. Featuring India's widest 14-lane corridor from Delhi to Dasna (including 6 dedicated expressway lanes and 8 service highway lanes) and automated ANPR tolling, it has reduced commute times between Delhi and Meerut to just 45 minutes.
Designed to decongest the heavily trafficked NH-24 (now NH-9) corridor across the National Capital Region, the ₹8,346-crore Delhi–Meerut Expressway (NE-3) combines brownfield highway expansion with greenfield expressway construction across four distinct packages. The inner six lanes between Sarai Kale Khan and Dasna operate as an access-controlled expressway flanked by four outer highway lanes on each side (14 lanes total), before branching at Dasna into a 31.78 km greenfield alignment to Partapur in Meerut and a 22.23 km six-lane highway upgrade to Hapur.
दिल्ली मेरठ एक्सप्रेसवे (National Expressway 3)
दिल्ली मेरठ एक्सप्रेसवे (NE-3) 96 किमी लंबा आधुनिक एक्सप्रेसवे है जो दिल्ली से मेरठ के बीच यात्रा समय को मात्र 45 मिनट में पूरा करता है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Delhi–Meerut Expressway (NE-3) Route Map & Alignment
View and download the latest Delhi–Meerut Expressway (NE-3) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerDelhi–Meerut Expressway (NE-3)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Package 1 | 8.72 km | Sarai Kale Khan / Nizamuddin to Ghazipur (Delhi–UP border) | Six-lane expressway alongside the existing eight-lane highway corridor |
| Package 2 | 19.28 km | Ghazipur / UP border to Dasna | Six-lane expressway alongside the existing NH-24 corridor |
| Package 3 | 22.23 km | Dasna to Hapur | Six-laning of existing NH-24 with service roads (upgraded highway section) |
| Package 4 | 31.78 km | Greenfield alignment from Dasna towards Meerut / Partapur | Six-lane access-controlled expressway |
| Toll System | Distance-based closed tolling with FASTag tracking; ANPR piloted on sections |
| Travel Time | Approximately 50 minutes under favourable traffic conditions (reduced from 2.5 hours on older route) |
| Project Name | Delhi–Meerut Expressway (NE-3) |
| Project Type | Expressway and National Highway improvement |
| Total Length | 82 km (approximately 60 km access-controlled expressway + 22 km upgraded National Highway) |
| Current Status | Fully Operational |
| Estimated Cost | ₹8,346 Crore |
| Target Completion | April 2021 |
| Lane Configuration | Combined 14-lane configuration on Delhi–Dasna section (six-lane expressway alongside eight-lane NH-24); dedicated six-lane greenfield expressway from Dasna to Meerut |
| Operational Status | Operational (Full corridor opened to traffic 1 April 2021) |
| Package Scope Note | Packages 1 and 2 form the approximately 28 km Delhi–Dasna section. Package 3 covers the upgraded Dasna–Hapur NH-24 section, while Package 4 is the greenfield Dasna–Meerut expressway. These package lengths represent the overall project scope and should not be interpreted as four consecutive sections of a single alignment. |
| Total Capital Cost | ₹8,346 crore |
| Implementing Agency | National Highways Authority of India (NHAI) |
| Major Access Points | 7 Major access points: Sarai Kale Khan, Indirapuram, Dundahera, Dasna, Rasoolpur Sikrod, Bhojpur, Kashi Toll Plaza |
| Construction Packages | 4 Packages (82.01 km total scope) |
| Implementing Authority | NHAI |
Distance-Based Closed Toll Schedule
Published FY 2026–27 user fees for the Delhi–Meerut Expressway (NE-3). The corridor uses distance-based closed tolling with FASTag-based entry and exit tracking at Kashi Toll Plaza:
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Kashi Toll Plaza | Plaza 1 | Meerut-side toll and access point towards the Partapur terminal and Meerut road network. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Major Entry and Exit Points
The Delhi–Meerut Expressway features designated entry and exit points connecting major NCR towns and local arterial roads:
- Sarai Kale Khan / Nizamuddin: Delhi-side starting point near the Nizamuddin Bridge and Ring Road.
- Indirapuram: Access point serving Ghaziabad's residential and commercial areas.
- Dundahera: Access serving the Vijay Nagar and Crossings Republik areas.
- Dasna Interchange: Major junction connecting the expressway with NH-9 and the Eastern Peripheral Expressway network.
- Rasoolpur Sikrod: Access point on the greenfield Dasna–Meerut section.
- Bhojpur: Access point serving Modinagar and nearby areas.
- Kashi Toll Plaza: Meerut-side toll and access point towards the Partapur terminal and Meerut road network.
District Coverage & Route Alignment
The ~82 km highway corridor traverses 4 administrative regions across Delhi and western Uttar Pradesh across 4 construction packages:
Sarai Kale Khan to UP Gate / Ghazipur border
UP Gate to Dasna & sections of Packages 3 and 4
Upgraded 6-lane NH-24/NH-9 corridor from Dasna to Hapur
6-lane greenfield expressway from Dasna to Partapur, Meerut
Route Alignment & Scope
The Delhi–Meerut Expressway connects Sarai Kale Khan in Delhi with Partapur in Meerut. The first 28 km between Delhi and Dasna (Packages 1 & 2) features a combined 14-lane configuration (six-lane expressway alongside the eight-lane NH-24 corridor). At Dasna, the project branches: Package 3 (22.23 km) comprises the upgraded six-lane NH-24 highway to Hapur, while Package 4 (31.78 km) is the six-lane dedicated greenfield expressway connecting Dasna directly with Meerut near Partapur.
Travel Time
The Delhi–Meerut Expressway has reduced the journey time between Delhi and Meerut from approximately 2.5 hours on the older route to around 50 minutes under favourable traffic conditions. Actual travel time may vary depending on congestion, weather, road restrictions and the selected entry and exit points.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Delhi–Meerut Expressway (NE-3) is approximately 82 km long. The project includes around 60 km of access-controlled expressway development and 22 km of upgraded National Highway sections connecting Delhi with Meerut.
The Delhi–Meerut Expressway runs from Sarai Kale Khan near Nizamuddin in Delhi to Partapur in Meerut, Uttar Pradesh. It passes through Ghaziabad and Hapur, with major access points at Indirapuram, Dundahera, Dasna, Rasoolpur Sikrod and Bhojpur.
The reported 2026–27 one-way toll for a car, jeep or van travelling from Sarai Kale Khan in Delhi to Meerut is ₹175. The reported return journey charge within 24 hours is ₹265. For LCVs, goods vehicles and minibuses, the reported one-way charge is ₹285 and the return charge is ₹425. Charges for shorter journeys depend on the entry and exit points.
The Delhi–Meerut Expressway has seven major reported access points: Sarai Kale Khan, Indirapuram, Dundahera, Dasna, Rasoolpur Sikrod, Bhojpur and Kashi Toll Plaza near Meerut. Toll charges are calculated according to the applicable entry and exit combination.
The Delhi–Meerut Expressway has reduced the typical Delhi–Meerut journey time from around 2.5 hours on the older route to approximately 45–50 minutes under favourable traffic conditions. Actual travel time depends on congestion, weather, road restrictions and the selected entry and exit points.
Yes. All four construction packages of the Delhi–Meerut Expressway have been completed, and the full corridor was opened to public traffic on 1 April 2021. The expressway is operational between Sarai Kale Khan in Delhi and Partapur in Meerut.
The Delhi–Meerut Expressway was developed in four construction packages. Package 1 covers the 8.72 km Delhi section, Package 2 covers approximately 19.2 km between the Delhi–Uttar Pradesh border and Dasna, Package 3 covers approximately 22.2 km of upgraded NH-24 between Dasna and Hapur, and Package 4 is the approximately 32 km greenfield expressway between Dasna and Meerut.
The Delhi–Meerut Expressway is a hybrid 14-lane corridor in its first approximately 28 km between Delhi and Dasna. This section combines a six-lane access-controlled expressway with the existing eight-lane NH-24 highway. Beyond Dasna, the dedicated greenfield expressway towards Meerut is six lanes.
The Delhi–Meerut Expressway starts at Sarai Kale Khan near the Nizamuddin Bridge in Delhi and ends at Partapur in Meerut, Uttar Pradesh. It provides a direct high-speed road connection between Delhi and western Uttar Pradesh.
Yes. The expressway uses a distance-based closed tolling system in which vehicle entry and exit points determine the applicable toll. FASTag supports electronic toll deduction, while Automatic Number Plate Recognition (ANPR) technology has been introduced or piloted to help identify vehicles and support automated toll collection.
The government-reported total capital cost of the Delhi–Meerut Expressway project is approximately ₹8,346 crore. This figure covers the full 82 km project scope, including the access-controlled expressway sections and the upgraded National Highway sections.
The Delhi–Meerut Expressway connects Delhi with the Uttar Pradesh districts of Ghaziabad, Hapur and Meerut. It improves road connectivity between the National Capital Region and western Uttar Pradesh.
Yes. The Delhi–Meerut Expressway connects with the Eastern Peripheral Expressway network at the Dasna interchange. This connection improves access between Delhi, Ghaziabad, Hapur and other parts of the National Capital Region.
The Delhi–Meerut Expressway is designated National Expressway 3 (NE-3). Parts of the wider corridor also use or upgrade the existing NH-24/NH-9 route, so NE-3 is the expressway's national expressway designation.
No. Two-wheelers are prohibited from entering the Delhi–Meerut Expressway under the government notification dated 15 January 2021. The restriction applies because the corridor is an access-controlled, high-speed expressway.
Related Infrastructure Projects
Delhi–Panipat Expressway (NH-44)
An approximately 70.7 km eight-lane highway upgrade on NH-44 connecting Mukarba Chowk to Panipat, connecting with the separate 10 km six-lane Panipat Elevated Highway.
View Project →Delhi–Faridabad Expressway (DND–KMP)
A 59.063 km 6-lane access-controlled highway (NH-148NA) connecting DND Flyway, Faridabad, and KMP. Packages 2 & 3 operational; Delhi Package 1 under carriageway trial operations.
View Project →Delhi–Gurgaon Expressway
A 27.7 km 8/6-lane access-controlled expressway corridor along NH-48 linking New Delhi to Gurugram and IGI Airport with major grade separators and the Kherki Daula toll plaza.