Advertisement // Sponsor
Verified PartnerKalyan Latur Expressway Route Map, Status & Latest Updates (2026)
The Kalyan Latur Expressway, also known as the Kalyan Latur Greenfield Expressway and Jankalyan Motorway, is a proposed high-speed corridor designed to improve connectivity between the Mumbai Metropolitan Region and Marathwada. This page tracks the Kalyan Latur Expressway route map, alignment, package-wise progress, contractors, construction status and latest project updates.
The Kalyan-Latur Expressway, now officially designated the 'Janakalyan' Expressway, recently received its final green light with the alignment revealed on December 28, 2025. This critical development follows the Maharashtra government's earlier clearance of the 442-km proposal, which is projected to dramatically cut travel time between Kalyan and Latur from 11 hours to just 4.
कल्याण लातूर एक्सप्रेसवे
कल्याण लातूर एक्सप्रेसवे, जिसे कल्याण लातूर ग्रीनफील्ड एक्सप्रेसवे भी कहा जाता है, महाराष्ट्र के मुंबई महानगर क्षेत्र और मराठवाड़ा क्षेत्र के बीच तेज और बेहतर कनेक्टिविटी प्रदान करने के लिए प्रस्तावित एक महत्वपूर्ण एक्सप्रेसवे परियोजना है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Kalyan Latur Expressway Route Map & Alignment
Explore the 442 km Kalyan–Latur Expressway alignment connecting the Mumbai Metropolitan Region (MMR) with Marathwada.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerKalyan Latur ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Origin | Kalyan (Mumbai Metropolitan Region) |
| Destination | Latur (Marathwada, Maharashtra) |
| Project Name | Kalyan–Latur Expressway (Jankalyan Motorway) |
| Total Length | 442 km |
| Corridor Type | Access-Controlled Greenfield & Brownfield Corridor |
| State Covered | Maharashtra |
| Current Status | Under Construction / Execution |
| Estimated Cost | ~₹12,000 Crore |
| Target Completion | NA |
| Expected Completion | NA |
| Implementing Agency | MSRDC / NHAI |
| Implementing Authority | MSRDC / NHAI |
Districts & Regions Covered by Kalyan Latur Expressway
Key districts traversed across Konkan, Western Maharashtra, and Marathwada.
Originates near Kalyan Ring Road / MMR logistics belt and heads toward Malshej Ghat
Crosses Junnar / Malshej belt and Ahilyanagar (Ahmednagar) district
Passes through Beed and Ambajogai, terminating at Latur connecting onward toward Nanded/Bidar
Kalyan Latur Expressway Route & Alignment
The Kalyan–Latur Expressway (also known as the Kalyan Latur Greenfield Expressway and Jankalyan Motorway) spans approximately 442 km from Kalyan in the Mumbai Metropolitan Region to Latur in central Maharashtra, passing through Murbad, Malshej Ghat, Ahilyanagar (Ahmednagar), Beed, and Ambajogai.
Kalyan to Latur Travel Time Reduction
Designed to reduce road transit time between the Mumbai Metropolitan Region (Kalyan/Thane) and Latur in Marathwada from 10–11 hours to approximately 4.5–5 hours.
Kalyan Latur Expressway Overview & Regional Impact
The Kalyan Latur Expressway (कल्याण लातूर एक्सप्रेसवे) provides a direct diagonal highway spine across Maharashtra, linking the industrial and port ecosystem of MMR directly with the agricultural and commercial hubs of Marathwada.
- Direct connectivity between Kalyan (MMR), Ahilyanagar, Beed, and Latur
- Decongests existing state highways and Ghat sections along NH-61
- Integrates with Ulhasnagar–Kalyan urban corridors and Marathwada highway network
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Kalyan Latur Expressway, also known as the Jan Kalyan Expressway, is a proposed six-lane, access-controlled greenfield expressway planned to provide a faster connection between the Mumbai Metropolitan Region and Marathwada. The project is being developed by the Maharashtra State Road Development Corporation (MSRDC).
The latest reported alignment runs from the Kalyan region through Murbad and Malshej Ghat toward Ahilyanagar, Beed, Dharashiv and Latur, with the corridor extending toward the Maharashtra-Karnataka border. The latest alignment was developed to provide connectivity to both Beed and Dharashiv.
The latest approved project is reported at approximately 442 km. Earlier alignment proposals were reported at around 443–450 km, so the 442 km figure represents the currently reported project scope.
The Kalyan Latur Expressway map follows the planned corridor from the Kalyan region through Murbad and Malshej Ghat toward Ahilyanagar, Beed, Dharashiv and Latur. Detailed alignment maps should be based on the latest MSRDC alignment rather than older route proposals or unofficial Google Maps drawings.
The latest reported alignment connects six districts: Thane, Pune, Ahilyanagar, Beed, Dharashiv and Latur. The exact village-level alignment can change as detailed project planning and land-related processes progress.
Yes. The planned Kalyan Latur Expressway alignment crosses the Malshej Ghat region and includes a proposed tunnel of approximately 8 km to pass through the difficult mountainous section.
The currently reported estimated project cost is around ₹35,000 crore. This remains an estimated figure, with the final cost subject to the detailed project report and subsequent project development.
No full-scale construction has been established yet. The project has received state-level approval and the alignment has been developed, but detailed project preparation, approvals, land-related work and subsequent implementation stages still need to progress before the expressway can be considered under full construction.
The Kalyan Latur Expressway has received approval from the Maharashtra government and is in the project-development stage. MSRDC is responsible for taking the project forward, while detailed planning and implementation activities remain to be completed before the corridor becomes operational.
The latest development is the approval of the approximately 442 km, six-lane Jan Kalyan Expressway. The project is estimated at about ₹35,000 crore and includes the planned 8 km Malshej Ghat tunnel. The latest alignment also provides connectivity to both Beed and Dharashiv before reaching the Latur region.
The project is planned to substantially reduce travel time between Kalyan and Latur by providing an access-controlled high-speed corridor. Current reports indicate that the Kalyan-Latur journey, which can take around 10–11 hours, could be reduced to approximately four hours once the expressway is completed.
The Jan Kalyan Expressway is planned as a connecting corridor within Maharashtra's wider expressway network, with links or connectivity planned toward corridors such as the Delhi-Mumbai Expressway, Virar-Alibag Multimodal Corridor, Nagpur-Goa Shaktipeeth Expressway and other major highway routes.
Related Infrastructure Projects
Samruddhi Vadhvan Expressway
A proposed 104 km greenfield expressway connecting the Samruddhi Mahamarg with the upcoming Vadhvan Mega Port in Palghar, Maharashtra.
View Project →Pune Ring Road
A premium 136.8 km outer circular ring bypass road easing logistics transit surrounding Pune metropolis.
View Project →Virar Alibaug Multimodal Corridor
A planned 8-lane expressway combining rapid transit, highways, and utility lines, connecting Virar to Alibaug to ease congestion in MMR.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
