The Delhi–Panipat Expressway (Grand Trunk Road section of NH-44) is a heavily engineered 70.5 km 8-lane access-controlled corridor connecting Mukarba Chowk in North Delhi with Panipat in Haryana. Upgraded with extensive flyovers, grade separators, and bypass structures at major urban choke points such as Singhu, Sonipat, and Samalkha, the corridor provides seamless high-speed connectivity towards Punjab, J&K, and Himachal Pradesh.
Serving as the primary northern gateway out of Delhi toward Haryana, Punjab, Chandigarh, and Jammu & Kashmir along National Highway 44 (formerly NH-1), the Delhi–Panipat corridor combines a ₹2,204.51-crore mainline eight-laning upgrade (with an eight-lane main carriageway, with four lanes in each direction, together with additional service roads) from Mukarba Chowk to Panipat with a separate 10 km six-lane elevated viaduct across Panipat city. Together with 11 grade-separated flyovers completed in June 2023, the corridor eliminates major signalized bottlenecks across North Delhi, Sonipat, and Panipat while linking directly with the KMP and Eastern Peripheral Expressways at Kundli.
दिल्ली पानीपत एक्सप्रेसवे (NH-44)
दिल्ली पानीपत एक्सप्रेसवे उत्तर भारत का व्यस्ततम ग्रैंड ट्रंक रोड कॉरिडोर है, जिसे 8-लेन एक्सेस-कंट्रोल्ड हाईवे के रूप में विकसित किया गया है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Delhi–Panipat Expressway (NH-44) Route Map & Alignment
View and download the latest Delhi–Panipat Expressway (NH-44) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerCorridor Comparison: Mainline Eight-Laning vs. Panipat Elevated Highway
| Feature / Parameter | Mainline Eight-Laning Project | Panipat Elevated Highway (Viaduct) |
|---|---|---|
| Length | 70.7 km (per NHAI records; ~70.5 km by chainage km 15.500–86.000; 69.84 km CCEA approval) | 10.0 km (Km 86.000 to Km 96.000; commercial operations began 17 July 2008) |
| Corridor Scope | Mukarba Chowk (Delhi) to Panipat city entrance | Elevated grade-separated bypass across Panipat city |
| Carriageway Configuration | An eight-lane main carriageway, with four lanes in each direction, together with additional service roads | 6-lane access-controlled elevated viaduct |
| Project Cost & Approval | ₹2,204.51 Cr (CCEA April 2015 approval) | ₹2,128.72 Cr (Separate PPPAC record) | Separate BOT Concession (~₹422 Cr original concession) |
| Inauguration / Milestones | 11 flyovers (24 km) inaugurated 20 June 2023 (₹890 Cr) | Commercial operations commenced 17 July 2008 |
| Toll Plaza & Operation | Bhagan Toll Plaza (Km 53.600 near Murthal; ₹120 car) | Panipat Elevated Toll Plaza (Km 86–96; ₹45 car; Extended concession period expected to end in January 2027; toll closure is subject to NHAI handover.) |
Delhi–Panipat Expressway (NH-44)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Travel Time | Approximately 60–75 minutes under favourable traffic conditions (indicative estimate) |
| Project Name | Delhi–Panipat Highway (NH-44) |
| Total Length | 70.7 km |
| Corridor Scope | 70.7 km Mukarba Chowk–Panipat eight-laning on NH-44; separate 10 km Panipat Elevated Highway |
| Current Status | Fully Operational |
| Estimated Cost | ₹2,204.51 Crore |
| Total Packages | Construction package count: Not confirmed in the cited project records. |
| Toll Facilities | Bhagan Toll Plaza (km 53.600 near Murthal) and separate Panipat Elevated Toll Plaza (km 86–96) |
| Inauguration Date | 20 June 2023 |
| Target Completion | 20 June 2023 |
| Lane Configuration | An eight-lane main carriageway, with four lanes in each direction, together with additional service roads; six-lane elevated viaduct on Panipat Elevated Highway |
| Connected Structure | Panipat Elevated Highway (Separate 10 km BOT project, km 86.000–96.000) |
| Implementing Agency | National Highways Authority of India (NHAI) |
| Implementing Authority | NHAI |
| Mainline Project Length | 70.7 km (per NHAI records; ~70.5 km by chainage km 15.500–86.000; 69.84 km CCEA approval) |
| Flyover Improvement Works | 11 flyovers spanning a combined 24 km inaugurated on 20 June 2023 (reported cost ₹890 crore) |
| Major Network Connections | Kundli: Important highway connection near the Delhi–Haryana border, providing access to the Kundli–Manesar–Palwal (KMP) Expressway and the Eastern Peripheral Expressway (EPE) network. |
| Major Locations Along Route | Mukarba Chowk, Alipur, Singhu Border, Kundli, Rai, Sonipat, Murthal, Samalkha, Panipat |
| Opening / Operational Status | Major milestone: 11 flyovers inaugurated on 20 June 2023. Overall project completion date: Not established by this milestone alone. |
| CCEA-Approved Project Estimate | ₹2,204.51 crore (CCEA approval, 22 April 2015); PPPAC document separately records ₹2,128.72 crore (distinguished estimates) |
| Panipat Elevated Commercial Operations | Commercial operations began on 17 July 2008; Extended concession period expected to end in January 2027; toll closure is subject to NHAI handover. |
Delhi–Panipat Highway (NH-44) Toll Rates (2026)
Travelers driving along the Delhi–Panipat NH-44 corridor encounter two separate toll facilities: Bhagan Toll Plaza at Km 53.600 in Sonipat, and the Panipat Elevated Toll Plaza across the separate 10 km Panipat elevated bypass (Km 86–96). These facilities have separate tariffs and concession histories. Gharaunda Toll Plaza is located farther north on NH-44 towards Karnal and is not part of the Delhi–Panipat eight-laning project.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Bhagan Toll Plaza | Plaza 1 | NHAI mainline toll plaza located at km 53.600. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Major Locations & Highway Connections
The Delhi–Panipat NH-44 corridor connects key urban centres, junctions, and regional connections in North Delhi and Haryana along the Grand Trunk Road alignment:
- Mukarba Chowk: Delhi-side starting terminal at km 15.500, connecting Outer Ring Road and Ring Road.
- Alipur: Major urban junction in North Delhi with distributor and service connections.
- Singhu Border: NCT Delhi–Haryana inter-state border checkpoint.
- Kundli: Important highway connection near the Delhi–Haryana border, providing access to the Kundli–Manesar–Palwal (KMP) Expressway and the Eastern Peripheral Expressway (EPE) network.
- Rai: Major industrial township connection and Rajiv Gandhi Education City junction in Sonipat.
- Sonipat / Bahalgarh: Interchange connection serving Sonipat city and the Meerut road link.
- Murthal: Prominent culinary and highway commercial cluster near km 50.
- Bhagan Toll Plaza: NHAI mainline toll plaza located at km 53.600.
- Samalkha: Southern Panipat district industrial centre with grade-separated crossing.
- Panipat Elevated Highway (Km 86–96): Separate 10 km six-lane elevated BOT bypass carrying through-traffic over Panipat city.
Districts Covered & Administrative Scope
Connecting the National Capital Territory with northern Haryana along National Highway 44:
Origin at Mukarba Chowk traversing Outer Ring Road junction, Jahangirpuri, and Alipur distributor connections.
Encompasses Kundli interchange, Rai, Bahalgarh, Murthal, and Bhagan Toll Plaza.
Mainline eight-laning up to km 86.000; separate 10 km elevated BOT bypass through Panipat city.
Route Alignment & Highway Scope
The Delhi–Panipat highway corridor follows the historic Grand Trunk Road alignment on National Highway 44 (NH-44). Starting from Mukarba Chowk in North Delhi (km 15.500), the route traverses Alipur and Singhu Border before entering Haryana at Kundli. It proceeds through Rai, Sonipat, Murthal, and Samalkha, concluding its 70.7 km eight-laning scope at km 86.000 just south of Panipat. At km 86.000, through-traffic connects directly onto the separate 10 km six-lane Panipat Elevated Highway (km 86.000 to km 96.000), which carries transit traffic over Panipat city.
Travel Time
Travel between Mukarba Chowk in Delhi and Panipat generally takes approximately 60–75 minutes under favourable traffic conditions. Actual journey time varies with congestion, traffic at the Delhi–Haryana border, roadworks, weather and the selected route. The 10 km Panipat Elevated Highway helps through-traffic bypass congested sections of Panipat city.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Delhi–Panipat NH-44 eight-laning corridor covers approximately 70.5 km by chainage (from km 15.500 to km 86.000). Official project records reflect different measurements across approval stages: the CCEA approval of 22 April 2015 approved approximately 69.84 km; PPPAC records list 69.849 km plus a 1.54 km EPC stretch (71.389 km); and NHAI corridor records cite 70.7 km. The separate 10 km Panipat Elevated Highway (km 86.000 to km 96.000) is a distinct BOT project.
The published FY 2026–27 car toll at Bhagan Toll Plaza near Murthal is ₹120 for a single journey and ₹185 for a same-day return journey. The separate Panipat Elevated Toll Plaza charges ₹45 per car crossing. Actual charges depend on the vehicle category and the toll facility used.
Bhagan Toll Plaza is located at approximately km 53.600 on National Highway 44 in Sonipat district, Haryana, near Murthal. It serves traffic travelling along the Delhi–Panipat highway corridor.
The Panipat Elevated Highway toll facility is located on the separate 10 km elevated bypass between chainage km 86.000 and km 96.000 in Panipat, Haryana. It collects toll from vehicles using the elevated corridor to bypass congested sections of Panipat city.
The 10 km Panipat Elevated Highway is a separate six-lane BOT project where commercial operations began on 17 July 2008. The original concession period ended in January 2026, and NHAI granted an extension of approximately one year. The extended concession period is expected to end in January 2027; toll closure is subject to NHAI handover.
Yes. The 70.7 km Delhi–Panipat NH-44 eight-laning corridor is operational. The 11 flyovers developed along the section were inaugurated on 20 June 2023. The separate Panipat Elevated Highway has also been operational since 2008.
Yes. The Delhi–Panipat mainline project is an eight-laning upgrade of NH-44 between Mukarba Chowk in Delhi and the Panipat section at km 86.000. It includes improved junctions, service-road connections and grade-separated structures along the Grand Trunk Road corridor.
No. The Panipat Elevated Highway is a separate 10 km, six-lane elevated BOT corridor between km 86.000 and km 96.000. The 70.7 km Delhi–Panipat eight-laning project ends at km 86.000. The two projects have separate construction histories, costs, toll facilities and concession arrangements.
The Delhi–Panipat NH-44 corridor connects Mukarba Chowk in North Delhi with Panipat in Haryana. Important locations along the route include Alipur, Singhu Border, Kundli, Rai, Sonipat, Bahalgarh, Murthal, Bhagan Toll Plaza and Samalkha.
Yes. The NH-44 corridor provides connectivity to the Kundli–Manesar–Palwal (KMP) Expressway and the Eastern Peripheral Expressway network near Kundli. These connections help vehicles travel between Haryana, Delhi NCR and other regional highways without passing through central Delhi.
Yes. Bhagan Toll Plaza collects toll on the mainline NH-44 corridor, while the Panipat Elevated Toll Plaza operates separately on the 10 km elevated bypass. A vehicle travelling through both facilities may incur charges at both plazas, depending on its route and vehicle category.
No. Gharaunda Toll Plaza is located farther north on NH-44 towards Karnal and is not part of the 70.7 km Delhi–Panipat eight-laning project or the separate 10 km Panipat Elevated Highway. It belongs to a different stretch of the NH-44 corridor.
The Delhi–Panipat Highway is part of National Highway 44 (NH-44), which forms a major north–south road corridor in India. The Delhi–Panipat section follows the historic Grand Trunk Road alignment through Delhi and Haryana.
The Delhi–Panipat eight-laning project is a 70.7 km at-grade highway upgrade on NH-44 between Mukarba Chowk and km 86.000 near Panipat. The Panipat Elevated Highway is a separate 10 km, six-lane elevated bypass between km 86.000 and km 96.000, designed to carry through-traffic above congested parts of Panipat city. They have different project costs, toll arrangements and concession histories.
The published FY 2026–27 tariff listing shows a local monthly pass of ₹360 for eligible cars, jeeps and vans at Bhagan Toll Plaza. Eligibility generally depends on residence within the prescribed 20 km local area and compliance with applicable NHAI and FASTag rules. Residents should confirm current eligibility and pass issuance details with the toll plaza or NHAI.
Related Infrastructure Projects
Delhi–Meerut Expressway (NE-3)
An approximately 82 km access-controlled expressway corridor (NE-3) connecting Sarai Kale Khan / Nizamuddin in Delhi to Partapur in Meerut via Dasna, featuring 14 lanes on the first 28 km alongside NH-24 and 6 lanes to Meerut.
View Project →Delhi–Gurgaon Expressway
A 27.7 km 8/6-lane access-controlled expressway corridor along NH-48 linking New Delhi to Gurugram and IGI Airport with major grade separators and the Kherki Daula toll plaza.
View Project →Delhi–Faridabad Expressway (DND–KMP)
A 59.063 km 6-lane access-controlled highway (NH-148NA) connecting DND Flyway, Faridabad, and KMP. Packages 2 & 3 operational; Delhi Package 1 under carriageway trial operations.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.