Delhi–Panipat Expressway (NH‑44) Route Map, Toll Rates, Status & Latest Updates (2026)

Last Updated: 3 November 2026
StatusFully Operational
Length70.7 km
Corridor StatusEntire Corridor Operational
Completion20 June 2023
Last Updated3 November 2026

The Delhi–Panipat Expressway (Grand Trunk Road section of NH-44) is a heavily engineered 70.5 km 8-lane access-controlled corridor connecting Mukarba Chowk in North Delhi with Panipat in Haryana. Upgraded with extensive flyovers, grade separators, and bypass structures at major urban choke points such as Singhu, Sonipat, and Samalkha, the corridor provides seamless high-speed connectivity towards Punjab, J&K, and Himachal Pradesh.

Project Summary

Serving as the primary northern gateway out of Delhi toward Haryana, Punjab, Chandigarh, and Jammu & Kashmir along National Highway 44 (formerly NH-1), the Delhi–Panipat corridor combines a ₹2,204.51-crore mainline eight-laning upgrade (with an eight-lane main carriageway, with four lanes in each direction, together with additional service roads) from Mukarba Chowk to Panipat with a separate 10 km six-lane elevated viaduct across Panipat city. Together with 11 grade-separated flyovers completed in June 2023, the corridor eliminates major signalized bottlenecks across North Delhi, Sonipat, and Panipat while linking directly with the KMP and Eastern Peripheral Expressways at Kundli.

दिल्ली पानीपत एक्सप्रेसवे (NH-44)

दिल्ली पानीपत एक्सप्रेसवे उत्तर भारत का व्यस्ततम ग्रैंड ट्रंक रोड कॉरिडोर है, जिसे 8-लेन एक्सेस-कंट्रोल्ड हाईवे के रूप में विकसित किया गया है।

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length70.7 km
Estimated Cost₹2,204.51 Crore
Implementing AgencyNHAI
Current StatusFully Operational
Completion20 June 2023
Route Map

Delhi–Panipat Expressway (NH-44) Route Map & Alignment

View and download the latest Delhi–Panipat Expressway (NH-44) route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Delhi–Panipat Expressway (NH-44) Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameDelhi–Panipat Expressway (NH-44)
Total Length70.7 km
Estimated Cost₹2,204.51 Crore
Current StatusFully Operational
* Note: Project length and cost clarification: • Project Length: Official records reflect different measurements across approval stages. The Cabinet Committee on Economic Affairs (CCEA) approval of 22 April 2015 approved approximately 69.84 km. The PPPAC record lists 69.849 km plus a 1.54 km EPC stretch (totalling 71.389 km). NHAI project documentation identifies the alignment from km 15.500 to km 86.000, giving approximately 70.5 km by chainage. NHAI project records also cite an approved corridor length of 70.7 km. The separate 10 km Panipat Elevated Highway (km 86.000 to km 96.000) is a distinct project. • Project Cost Distinction: The ₹2,204.51 crore figure is supported by the 22 April 2015 CCEA approval (including land acquisition and pre-construction). The PPPAC document separately records ₹2,128.72 crore. These represent distinct cost estimates from different reporting stages and are maintained as separate figures rather than treated as interchangeable.

Corridor Comparison: Mainline Eight-Laning vs. Panipat Elevated Highway

Feature / ParameterMainline Eight-Laning ProjectPanipat Elevated Highway (Viaduct)
Length70.7 km (per NHAI records; ~70.5 km by chainage km 15.500–86.000; 69.84 km CCEA approval)10.0 km (Km 86.000 to Km 96.000; commercial operations began 17 July 2008)
Corridor ScopeMukarba Chowk (Delhi) to Panipat city entranceElevated grade-separated bypass across Panipat city
Carriageway ConfigurationAn eight-lane main carriageway, with four lanes in each direction, together with additional service roads6-lane access-controlled elevated viaduct
Project Cost & Approval₹2,204.51 Cr (CCEA April 2015 approval) | ₹2,128.72 Cr (Separate PPPAC record)Separate BOT Concession (~₹422 Cr original concession)
Inauguration / Milestones11 flyovers (24 km) inaugurated 20 June 2023 (₹890 Cr)Commercial operations commenced 17 July 2008
Toll Plaza & OperationBhagan Toll Plaza (Km 53.600 near Murthal; ₹120 car)Panipat Elevated Toll Plaza (Km 86–96; ₹45 car; Extended concession period expected to end in January 2027; toll closure is subject to NHAI handover.)
Project Parameters & Technical Details

Delhi–Panipat Expressway (NH-44)Cost • Route • Timeline

ParameterTechnical Details
Travel TimeApproximately 60–75 minutes under favourable traffic conditions (indicative estimate)
Project NameDelhi–Panipat Highway (NH-44)
Total Length70.7 km
Corridor Scope70.7 km Mukarba Chowk–Panipat eight-laning on NH-44; separate 10 km Panipat Elevated Highway
Current StatusFully Operational
Estimated Cost₹2,204.51 Crore
Total PackagesConstruction package count: Not confirmed in the cited project records.
Toll FacilitiesBhagan Toll Plaza (km 53.600 near Murthal) and separate Panipat Elevated Toll Plaza (km 86–96)
Inauguration Date20 June 2023
Target Completion20 June 2023
Lane ConfigurationAn eight-lane main carriageway, with four lanes in each direction, together with additional service roads; six-lane elevated viaduct on Panipat Elevated Highway
Connected StructurePanipat Elevated Highway (Separate 10 km BOT project, km 86.000–96.000)
Implementing AgencyNational Highways Authority of India (NHAI)
Implementing AuthorityNHAI
Mainline Project Length70.7 km (per NHAI records; ~70.5 km by chainage km 15.500–86.000; 69.84 km CCEA approval)
Flyover Improvement Works11 flyovers spanning a combined 24 km inaugurated on 20 June 2023 (reported cost ₹890 crore)
Major Network ConnectionsKundli: Important highway connection near the Delhi–Haryana border, providing access to the Kundli–Manesar–Palwal (KMP) Expressway and the Eastern Peripheral Expressway (EPE) network.
Major Locations Along RouteMukarba Chowk, Alipur, Singhu Border, Kundli, Rai, Sonipat, Murthal, Samalkha, Panipat
Opening / Operational StatusMajor milestone: 11 flyovers inaugurated on 20 June 2023. Overall project completion date: Not established by this milestone alone.
CCEA-Approved Project Estimate₹2,204.51 crore (CCEA approval, 22 April 2015); PPPAC document separately records ₹2,128.72 crore (distinguished estimates)
Panipat Elevated Commercial OperationsCommercial operations began on 17 July 2008; Extended concession period expected to end in January 2027; toll closure is subject to NHAI handover.
Published Tariff Listings – Bhagan & Panipat Elevated Plazas

Delhi–Panipat Highway (NH-44) Toll Rates (2026)

1 April 2026 (Bhagan) / 17 July 2026 (Panipat Elevated)

Travelers driving along the Delhi–Panipat NH-44 corridor encounter two separate toll facilities: Bhagan Toll Plaza at Km 53.600 in Sonipat, and the Panipat Elevated Toll Plaza across the separate 10 km Panipat elevated bypass (Km 86–96). These facilities have separate tariffs and concession histories. Gharaunda Toll Plaza is located farther north on NH-44 towards Karnal and is not part of the Delhi–Panipat eight-laning project.

Fee Plazas on Corridor (NETC / NPCI Master)
1 Toll Point
No.Toll Plaza NamePlaza Code / ChainageInterchange Details & Connectivity
1Bhagan Toll PlazaPlaza 1NHAI mainline toll plaza located at km 53.600.
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→
Corridor Junctions & Alignment

Major Locations & Highway Connections

The Delhi–Panipat NH-44 corridor connects key urban centres, junctions, and regional connections in North Delhi and Haryana along the Grand Trunk Road alignment:

  • Mukarba Chowk: Delhi-side starting terminal at km 15.500, connecting Outer Ring Road and Ring Road.
  • Alipur: Major urban junction in North Delhi with distributor and service connections.
  • Singhu Border: NCT Delhi–Haryana inter-state border checkpoint.
  • Kundli: Important highway connection near the Delhi–Haryana border, providing access to the Kundli–Manesar–Palwal (KMP) Expressway and the Eastern Peripheral Expressway (EPE) network.
  • Rai: Major industrial township connection and Rajiv Gandhi Education City junction in Sonipat.
  • Sonipat / Bahalgarh: Interchange connection serving Sonipat city and the Meerut road link.
  • Murthal: Prominent culinary and highway commercial cluster near km 50.
  • Bhagan Toll Plaza: NHAI mainline toll plaza located at km 53.600.
  • Samalkha: Southern Panipat district industrial centre with grade-separated crossing.
  • Panipat Elevated Highway (Km 86–96): Separate 10 km six-lane elevated BOT bypass carrying through-traffic over Panipat city.
Corridor Geography & Route Nodes

Districts Covered & Administrative Scope

Connecting the National Capital Territory with northern Haryana along National Highway 44:

North Delhi (NCT)
Mainline Section (km 15.500 to Singhu Border)

Origin at Mukarba Chowk traversing Outer Ring Road junction, Jahangirpuri, and Alipur distributor connections.

Sonipat (Haryana)
Mainline Section (Singhu Border to Samalkha border)

Encompasses Kundli interchange, Rai, Bahalgarh, Murthal, and Bhagan Toll Plaza.

Panipat (Haryana)
Mainline Section (Samalkha to km 86.000) & Panipat Elevated Highway (km 86.000–96.000)

Mainline eight-laning up to km 86.000; separate 10 km elevated BOT bypass through Panipat city.

Corridor Trajectory

Route Alignment & Highway Scope

The Delhi–Panipat highway corridor follows the historic Grand Trunk Road alignment on National Highway 44 (NH-44). Starting from Mukarba Chowk in North Delhi (km 15.500), the route traverses Alipur and Singhu Border before entering Haryana at Kundli. It proceeds through Rai, Sonipat, Murthal, and Samalkha, concluding its 70.7 km eight-laning scope at km 86.000 just south of Panipat. At km 86.000, through-traffic connects directly onto the separate 10 km six-lane Panipat Elevated Highway (km 86.000 to km 96.000), which carries transit traffic over Panipat city.

Travel Advisory

Travel Time

Travel between Mukarba Chowk in Delhi and Panipat generally takes approximately 60–75 minutes under favourable traffic conditions. Actual journey time varies with congestion, traffic at the Delhi–Haryana border, roadworks, weather and the selected route. The 10 km Panipat Elevated Highway helps through-traffic bypass congested sections of Panipat city.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Delhi–Panipat NH-44 eight-laning corridor covers approximately 70.5 km by chainage (from km 15.500 to km 86.000). Official project records reflect different measurements across approval stages: the CCEA approval of 22 April 2015 approved approximately 69.84 km; PPPAC records list 69.849 km plus a 1.54 km EPC stretch (71.389 km); and NHAI corridor records cite 70.7 km. The separate 10 km Panipat Elevated Highway (km 86.000 to km 96.000) is a distinct BOT project.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Delhi NCR Dashboard →DL
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement