The Hindon Elevated Road (हिंडन एलिवेटेड रोड) in Ghaziabad is a grade-separated elevated expressway connecting UP Gate (Delhi–UP Border / NH-9) directly to Raj Nagar Extension. Built by Navayuga Engineering Company Limited for the Ghaziabad Development Authority (GDA) on 227 single-pier pillars (as reported on ghaziabad.nic.in) at a total cost of ₹1,147 Crore, the completed corridor operates as a 6-lane facility (10.3 km in Environmental Clearance filings; 10.5 km on the Ghaziabad official district portal) and remains toll-free since opening on 30 March 2018.

Operational Status: Main Corridor Open & Toll-FreeInaugurated on 30 March 2018, the Ghaziabad Hindon Elevated Road carries 6 lanes (3+3) on 227 single-pier pillars (as listed on ghaziabad.nic.in) between UP Gate and Raj Nagar Extension with no active toll plaza.
New Slip-Road Ramp Tender: ₹80.37 Crore Tender ValueGDA issued UP e-Procurement Tender Ref 667/4/PA-T/2025-26 (ID: 2026_GDAUP_1143773_1) valued at ₹80.37 Crore (distinct from the ~₹90 Crore overall reported press estimate) to construct bidirectional slip roads serving Indirapuram and Vasundhara toward Delhi.
Project Summary

"The Hindon Elevated Road (हिंडन एलिवेटेड रोड) connects UP Gate (NH-9 / Delhi–Meerut Expressway border) with Raj Nagar Extension in Ghaziabad. Constructed on 227 single-pier pillars (ghaziabad.nic.in) by Navayuga Engineering Company Limited for GDA at a total project cost of ₹1,147 Crore (base construction ~₹916.92 Crore), the 6-lane viaduct measures 10.3 km in MoEF&CC Environmental Clearance filings and 10.5 km on the official Ghaziabad district portal. Operational and toll-free since 30 March 2018, GDA recently issued UP e-Procurement Tender 2026_GDAUP_1143773_1 (₹80.37 Crore estimated tender value) for additional Indirapuram and Vasundhara slip roads."

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length10.5 km
Estimated Cost₹1,147 Crore
Implementing AgencyGDA
Current StatusFully Operational
CompletionMarch 2018

Current Project Status

The Hindon Elevated Road project status is 100% operational along the mainline corridor connecting Raj Nagar Extension and UP Gate in Ghaziabad. Constructed on 227 single-pier pillars (as listed by the Ghaziabad district portal ghaziabad.nic.in) by contractor Navayuga Engineering Company Limited for the Ghaziabad Development Authority (GDA), the six-lane flyway has operated without toll collection since its inauguration on 30 March 2018.

Regarding active expansions, GDA issued UP e-Procurement Tender Ref 667/4/PA-T/2025-26 (Tender ID: 2026_GDAUP_1143773_1) to build missing slip-road ramps for Indirapuram and Vasundhara commuters travelling to and from the Delhi/UP Gate side. While press updates cite a broader project estimate of approximately ₹90 Crore, the official GDA estimated tender value stands at ₹80.37 Crore (₹80,37,07,999).

Traffic movement, posted speed limits, and slow-moving vehicle restrictions along the elevated stretch remain enforced by the Ghaziabad Traffic Police according to official traffic notifications and overhead road signage. (Exact statutory gazette orders for speed thresholds are flagged for manual verification against current Traffic Police notifications.)

Hindon Elevated Road Route and Access Points

The Hindon Elevated Road route spans north-northeast across Trans-Hindon Ghaziabad. From its southern access terminal at UP Gate (on NH-9 / NH-24 Bypass connecting the Delhi–Meerut Expressway corridor), the elevated alignment travels northeast overhead past Vaishali, Kaushambi, and Indirapuram sectors before curving north along the Hindon western embankment past Mohan Nagar, Arthala, and GT Road to its northern terminal at Raj Nagar Extension (Karhera Rotary).

Verified access points on the current route map include only the UP Gate terminal, Raj Nagar Extension terminal, the Vasundhara ascending entry ramp (for traffic moving north toward Raj Nagar Extension), and the Kanawani descending exit ramp (for traffic arriving south from Raj Nagar Extension toward Indirapuram). Neighbouring corridors like Vaishali, Kaushambi, Arthala, and GT Road pass underneath the elevated deck without direct entry or exit ramps. Commuters continuing across NCR can also connect southward via the Delhi–Noida Direct Flyway, northward along the Delhi–Dehradun Expressway, or westward toward the Delhi Mumbai Expressway.

Route Alignment: Access Terminals vs Overhead Crossings
UP GateAccess Terminal (NH-9 / DME)
Vaishali / KaushambiOverhead Pass (No Direct Ramp)
Indirapuram / KanawaniExit Ramp (Entry Ramp Tendered)
VasundharaEntry Ramp (Exit Ramp Tendered)
Arthala / GT RoadOverhead Pass (No Direct Ramp)
Raj Nagar Ext.Access Terminal (Karhera / NH-58)

Advertisement // Sponsor

Verified Partner
Loading sponsor...
GIS Alignment

Hindon Elevated Road Route and Map

Explore the interactive Hindon Elevated Road map generated from verified OpenStreetMap Relation 8429969 route coordinates. The map displays the northbound and southbound mainline carriageways between UP Gate and Raj Nagar Extension alongside the existing Vasundhara ascending entry ramp and Kanawani descending exit ramp.

Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Verified Technical Specifications

Hindon Elevated Road Length and Project Cost

Official records report minor variations in total route length due to terminal ramp inclusion: MoEF&CC Environmental Clearance documents report 10.3 km, while the Ghaziabad District Official Portal (ghaziabad.nic.in) lists 10.5 km and ₹1,147 Crore total project cost. Similarly, while early planning feasibility notes referenced four lanes, the built viaduct carries six lanes (3+3).

ParameterVerified Details
Project NameGhaziabad Hindon Elevated Road (UP Gate – Raj Nagar Extension)
Hindon Elevated Road Length10.3 km (Environmental Clearance / engineering docs) • 10.5 km (ghaziabad.nic.in official district portal)
Lane Configuration6 Lanes (3+3) as constructed (early planning blueprints referenced 4 lanes)
Total Project Cost₹1,147 Crore
Implementing AuthorityGhaziabad Development Authority (GDA)
ContractorNavayuga Engineering Company Limited
Pillar Structure227 single-pier pillars (ghaziabad.nic.in; some press reports cite 228)
Toll Collection StatusToll-Free (no operational toll plaza; GDA previously evaluated tolling proposals)
Speed & Vehicle GuidelinesEnforced by Ghaziabad Traffic Police via official traffic orders and posted gantry signage. Media articles report limits of 80 km/h (cars) and 60 km/h (two-wheelers) and restrictions on slow-moving vehicles (pending direct official notification verification).
Slip-Road Ramp Tender₹80.37 Crore (₹80,37,07,999 estimated tender value) — Tender Ref 667/4/PA-T/2025-26 (UP e-Tender ID: 2026_GDAUP_1143773_1) (vs ~₹90 Crore (reported overall allocation in press))
Toll Intelligence & Civic Bypass Audit · Hindon Elevated Road

Hindon Elevated Road Toll Status & Speed Governance

10.5 km UP Gate to Raj Nagar Extension Corridor (GDA 100% Toll-Free Elevated Highway)

100% Toll-Free · GDA Notified
Corridor Classification100% Toll-FreeListed in National Toll Directory · State: Delhi-NCR, UP
Active Toll Plazas0 Toll PlazasBuilt as a free signal-free civic bypass by GDA
Car User Fee₹0 (Toll-Free)Completely toll-free since inauguration in March 2018
New Ramps₹80.37 Cr TenderIndirapuram & Vasundhara entry/exit slip roads underway
Tolling System & Operational Audit

The Hindon Elevated Road is a 6-lane elevated expressway constructed by the Ghaziabad Development Authority (GDA) on 227 single-pier pillars. It directly links UP Gate (Delhi Border / NH-9 & DME) to Raj Nagar Extension (NH-58 bypass). Constructed at a cost of ₹1,147 Crore, the expressway operates completely toll-free with no toll booths or user fees levied on motorists. Speed limits are enforced by Ghaziabad Traffic Police at 80 km/h for four-wheelers and 60 km/h for two-wheelers.

Elevated Alignment & Corridor Scope

10.5 km Single-Pier Viaduct
No.Fee Plaza / FacilityChainage / InterchangeDistrict / StateClassificationRole & Corridor Scope
1UP Gate to Raj Nagar Extension AlignmentKm 0 to Km 10.5Delhi-NCR / UPToll-Free Elevated Highway6-lane elevated viaduct on 227 single-pier pillars; provides 100% toll-free signal-free bypass around Ghaziabad city.
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→

Extension and New Ramp Updates

Official UP e-Tender Issued: ₹80.37 Crore Tender Value vs ~₹90 Crore Reported OutlayGDA floated Tender ID 2026_GDAUP_1143773_1 (Ref 667/4/PA-T/2025-26) for the construction of slip roads on the elevated corridor serving Indirapuram toward Delhi and exiting from Delhi toward Vasundhara/Indirapuram, specifying an estimated tender value of ₹80.37 Crore and a 365–540 day work period. Media reports separately cite an overall ~₹90 Crore project allocation.

Because the original ramps near Vasundhara and Kanawani only served traffic moving toward and from Raj Nagar Extension, Indirapuram and Vasundhara commuters travelling toward UP Gate/Delhi lacked direct ramp access. The new GDA slip-road tender addresses these bidirectional access gaps. Regional press briefings report ~590 m and ~620 m precast concrete ramps with 7.5 m carriageways and two 50 m ground rotaries; these detailed engineering measurements remain subject to manual verification against official tender drawings.

Separately, discussions around Hindon Elevated Road Extension links and GDA feeder road capacity expansions along the Hindon embankment and Raj Nagar Extension approaches aim to widen feeder bottlenecks from four to six lanes to balance growing regional traffic.

Construction Details

Construction Timeline: November 2014 to 30 March 2018Following environmental clearance processes before SEIAA/NGT and a foundation ceremony in November 2014, civil erection was executed by Hyderabad-based Navayuga Engineering Company Limited ahead of the 30 March 2018 public inauguration.

Built primarily along the western bank of the Hindon River canal bed to minimize urban land acquisition across congested Sahibabad neighbourhoods, the corridor rests on single-pier concrete columns supporting wide box-girder superstructures. The Ghaziabad official district portal (ghaziabad.nic.in) explicitly cites 227 single-pier pillars and a total project outlay of ₹1,147 Crore (partially financed alongside NCR Planning Board loans and state funds), though certain media accounts cite 228 piers and base construction estimates near ₹916.92 Crore.

By providing continuous grade separation over major surface bottlenecks—including GT Road, Mohan Nagar, and rail crossings—the corridor reduces travel delays between Raj Nagar Extension and UP Gate relative to congested ground-level routes, with exact trip durations varying according to traffic volume at terminal merges.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Q&A

Frequently Asked Questions

The Hindon Elevated Road route connects UP Gate (at the Delhi–Ghaziabad border linking NH-9 and the Delhi–Meerut Expressway) to Raj Nagar Extension near the Karhera rotary. Direct verified entry/exit access is at UP Gate, Raj Nagar Extension, the Vasundhara ascending entry ramp (toward Raj Nagar Extension), and the Kanawani descending exit ramp (from Raj Nagar Extension). The corridor passes overhead past Vaishali, Kaushambi, Arthala, and GT Road without direct intermediate access ramps.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement