Verified PartnerHindon Elevated Road Route Map, Toll Rates, Length, Status & Latest Updates (2026)
The Hindon Elevated Road (हिंडन एलिवेटेड रोड) in Ghaziabad is a grade-separated elevated expressway connecting UP Gate (Delhi–UP Border / NH-9) directly to Raj Nagar Extension. Built by Navayuga Engineering Company Limited for the Ghaziabad Development Authority (GDA) on 227 single-pier pillars (as reported on ghaziabad.nic.in) at a total cost of ₹1,147 Crore, the completed corridor operates as a 6-lane facility (10.3 km in Environmental Clearance filings; 10.5 km on the Ghaziabad official district portal) and remains toll-free since opening on 30 March 2018.
ghaziabad.nic.in) between UP Gate and Raj Nagar Extension with no active toll plaza.667/4/PA-T/2025-26 (ID: 2026_GDAUP_1143773_1) valued at ₹80.37 Crore (distinct from the ~₹90 Crore overall reported press estimate) to construct bidirectional slip roads serving Indirapuram and Vasundhara toward Delhi."The Hindon Elevated Road (हिंडन एलिवेटेड रोड) connects UP Gate (NH-9 / Delhi–Meerut Expressway border) with Raj Nagar Extension in Ghaziabad. Constructed on 227 single-pier pillars (ghaziabad.nic.in) by Navayuga Engineering Company Limited for GDA at a total project cost of ₹1,147 Crore (base construction ~₹916.92 Crore), the 6-lane viaduct measures 10.3 km in MoEF&CC Environmental Clearance filings and 10.5 km on the official Ghaziabad district portal. Operational and toll-free since 30 March 2018, GDA recently issued UP e-Procurement Tender 2026_GDAUP_1143773_1 (₹80.37 Crore estimated tender value) for additional Indirapuram and Vasundhara slip roads."
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Current Project Status
The Hindon Elevated Road project status is 100% operational along the mainline corridor connecting Raj Nagar Extension and UP Gate in Ghaziabad. Constructed on 227 single-pier pillars (as listed by the Ghaziabad district portal ghaziabad.nic.in) by contractor Navayuga Engineering Company Limited for the Ghaziabad Development Authority (GDA), the six-lane flyway has operated without toll collection since its inauguration on 30 March 2018.
Regarding active expansions, GDA issued UP e-Procurement Tender Ref 667/4/PA-T/2025-26 (Tender ID: 2026_GDAUP_1143773_1) to build missing slip-road ramps for Indirapuram and Vasundhara commuters travelling to and from the Delhi/UP Gate side. While press updates cite a broader project estimate of approximately ₹90 Crore, the official GDA estimated tender value stands at ₹80.37 Crore (₹80,37,07,999).
Traffic movement, posted speed limits, and slow-moving vehicle restrictions along the elevated stretch remain enforced by the Ghaziabad Traffic Police according to official traffic notifications and overhead road signage. (Exact statutory gazette orders for speed thresholds are flagged for manual verification against current Traffic Police notifications.)
Hindon Elevated Road Route and Access Points
The Hindon Elevated Road route spans north-northeast across Trans-Hindon Ghaziabad. From its southern access terminal at UP Gate (on NH-9 / NH-24 Bypass connecting the Delhi–Meerut Expressway corridor), the elevated alignment travels northeast overhead past Vaishali, Kaushambi, and Indirapuram sectors before curving north along the Hindon western embankment past Mohan Nagar, Arthala, and GT Road to its northern terminal at Raj Nagar Extension (Karhera Rotary).
Verified access points on the current route map include only the UP Gate terminal, Raj Nagar Extension terminal, the Vasundhara ascending entry ramp (for traffic moving north toward Raj Nagar Extension), and the Kanawani descending exit ramp (for traffic arriving south from Raj Nagar Extension toward Indirapuram). Neighbouring corridors like Vaishali, Kaushambi, Arthala, and GT Road pass underneath the elevated deck without direct entry or exit ramps. Commuters continuing across NCR can also connect southward via the Delhi–Noida Direct Flyway, northward along the Delhi–Dehradun Expressway, or westward toward the Delhi Mumbai Expressway.
Advertisement // Sponsor
Verified PartnerHindon Elevated Road Route and Map
Explore the interactive Hindon Elevated Road map generated from verified OpenStreetMap Relation 8429969 route coordinates. The map displays the northbound and southbound mainline carriageways between UP Gate and Raj Nagar Extension alongside the existing Vasundhara ascending entry ramp and Kanawani descending exit ramp.
Advertisement // Sponsor
Verified PartnerHindon Elevated Road Length and Project Cost
Official records report minor variations in total route length due to terminal ramp inclusion: MoEF&CC Environmental Clearance documents report 10.3 km, while the Ghaziabad District Official Portal (ghaziabad.nic.in) lists 10.5 km and ₹1,147 Crore total project cost. Similarly, while early planning feasibility notes referenced four lanes, the built viaduct carries six lanes (3+3).
| Parameter | Verified Details |
|---|---|
| Project Name | Ghaziabad Hindon Elevated Road (UP Gate – Raj Nagar Extension) |
| Hindon Elevated Road Length | 10.3 km (Environmental Clearance / engineering docs) • 10.5 km (ghaziabad.nic.in official district portal) |
| Lane Configuration | 6 Lanes (3+3) as constructed (early planning blueprints referenced 4 lanes) |
| Total Project Cost | ₹1,147 Crore |
| Implementing Authority | Ghaziabad Development Authority (GDA) |
| Contractor | Navayuga Engineering Company Limited |
| Pillar Structure | 227 single-pier pillars (ghaziabad.nic.in; some press reports cite 228) |
| Toll Collection Status | Toll-Free (no operational toll plaza; GDA previously evaluated tolling proposals) |
| Speed & Vehicle Guidelines | Enforced by Ghaziabad Traffic Police via official traffic orders and posted gantry signage. Media articles report limits of 80 km/h (cars) and 60 km/h (two-wheelers) and restrictions on slow-moving vehicles (pending direct official notification verification). |
| Slip-Road Ramp Tender | ₹80.37 Crore (₹80,37,07,999 estimated tender value) — Tender Ref 667/4/PA-T/2025-26 (UP e-Tender ID: 2026_GDAUP_1143773_1) (vs ~₹90 Crore (reported overall allocation in press)) |
Hindon Elevated Road Toll Status & Speed Governance
10.5 km UP Gate to Raj Nagar Extension Corridor (GDA 100% Toll-Free Elevated Highway)
The Hindon Elevated Road is a 6-lane elevated expressway constructed by the Ghaziabad Development Authority (GDA) on 227 single-pier pillars. It directly links UP Gate (Delhi Border / NH-9 & DME) to Raj Nagar Extension (NH-58 bypass). Constructed at a cost of ₹1,147 Crore, the expressway operates completely toll-free with no toll booths or user fees levied on motorists. Speed limits are enforced by Ghaziabad Traffic Police at 80 km/h for four-wheelers and 60 km/h for two-wheelers.
Elevated Alignment & Corridor Scope
10.5 km Single-Pier Viaduct| No. | Fee Plaza / Facility | Chainage / Interchange | District / State | Classification | Role & Corridor Scope |
|---|---|---|---|---|---|
| 1 | UP Gate to Raj Nagar Extension Alignment | Km 0 to Km 10.5 | Delhi-NCR / UP | Toll-Free Elevated Highway | 6-lane elevated viaduct on 227 single-pier pillars; provides 100% toll-free signal-free bypass around Ghaziabad city. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Extension and New Ramp Updates
2026_GDAUP_1143773_1 (Ref 667/4/PA-T/2025-26) for the construction of slip roads on the elevated corridor serving Indirapuram toward Delhi and exiting from Delhi toward Vasundhara/Indirapuram, specifying an estimated tender value of ₹80.37 Crore and a 365–540 day work period. Media reports separately cite an overall ~₹90 Crore project allocation.Because the original ramps near Vasundhara and Kanawani only served traffic moving toward and from Raj Nagar Extension, Indirapuram and Vasundhara commuters travelling toward UP Gate/Delhi lacked direct ramp access. The new GDA slip-road tender addresses these bidirectional access gaps. Regional press briefings report ~590 m and ~620 m precast concrete ramps with 7.5 m carriageways and two 50 m ground rotaries; these detailed engineering measurements remain subject to manual verification against official tender drawings.
Separately, discussions around Hindon Elevated Road Extension links and GDA feeder road capacity expansions along the Hindon embankment and Raj Nagar Extension approaches aim to widen feeder bottlenecks from four to six lanes to balance growing regional traffic.
Construction Details
Built primarily along the western bank of the Hindon River canal bed to minimize urban land acquisition across congested Sahibabad neighbourhoods, the corridor rests on single-pier concrete columns supporting wide box-girder superstructures. The Ghaziabad official district portal (ghaziabad.nic.in) explicitly cites 227 single-pier pillars and a total project outlay of ₹1,147 Crore (partially financed alongside NCR Planning Board loans and state funds), though certain media accounts cite 228 piers and base construction estimates near ₹916.92 Crore.
By providing continuous grade separation over major surface bottlenecks—including GT Road, Mohan Nagar, and rail crossings—the corridor reduces travel delays between Raj Nagar Extension and UP Gate relative to congested ground-level routes, with exact trip durations varying according to traffic volume at terminal merges.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
Related Infrastructure Projects
Delhi–Meerut Expressway (NE-3)
An approximately 82 km access-controlled expressway corridor (NE-3) connecting Sarai Kale Khan / Nizamuddin in Delhi to Partapur in Meerut via Dasna, featuring 14 lanes on the first 28 km alongside NH-24 and 6 lanes to Meerut.
View Project →Delhi Noida Direct (DND) Flyway
A 9.2 km 8-lane access-controlled tolled bridge and corridor connecting South Delhi across the Yamuna River to Noida.
View Project →Noida–Bhangel Elevated Corridor (DSC Road)
A 4.5 km 6-lane elevated corridor along the Dadri-Surajpur-Chalera (DSC) road bypassing congested arterial intersections in Noida.