Verified PartnerSohna Elevated Corridor (NH‑248A) Route Map, Toll Rates, Status & Latest Updates (2026)
The Sohna Elevated Corridor (NH-248A) is a 21.66 km 6-lane access-controlled highway featuring an 8.9 km elevated viaduct connecting Rajiv Chowk in Gurugram to Sohna. Fully commissioned in July 2022 by NHAI, it serves as the crucial feeder corridor directly linking Delhi-NCR with the main Delhi–Mumbai Expressway.
The Sohna Elevated Corridor is a 21.66 km six-laning and strengthening project along National Highway 248A (NH-248A) in Haryana, connecting Rajiv Chowk in Gurugram with Sohna. The project was executed in two Hybrid Annuity Mode (HAM) packages: Package I (8.942 km) and Package II (12.718 km). It includes upgraded highway carriageways, service roads, grade-separated junctions and approximately 7 km of elevated structures across congested sections, including the Badshahpur area. NHAI awarded the two packages in March 2018 for a combined contract value of ₹1,255.77 crore. At the July 2022 opening, the project was reported to involve approximately ₹2,000 crore in capital investment. The remaining Rajiv Chowk–Badshahpur section opened on a trial basis on 12 July 2022, completing the corridor's opening to traffic. The highway provides connectivity towards the Delhi–Mumbai Expressway and the KMP Expressway network.
सोहना एलिवेटेड कॉरिडोर (NH-248A)
सोहना एलिवेटेड कॉरिडोर गुरुग्राम के राजीव चौक से सोहना को जोड़ने वाला 21.66 किमी लंबा 6-लेन एक्सेस-नियंत्रित एक्सप्रेस कॉरिडोर है। यह दिल्ली-एनसीआर से दिल्ली-मुंबई एक्सप्रेसवे को सीधी सिग्नल-मुक्त हाई-स्पीड कनेक्टिविटी प्रदान करता है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Sohna Elevated Corridor (NH-248A) Route Map & Alignment
View and download the latest Sohna Elevated Corridor (NH-248A) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerSohna Elevated Corridor (NH-248A)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| status | Fully Operational |
| packages | [object Object],[object Object] |
| Project Name | Sohna Elevated Corridor (NH-248A) |
| Total Length | 21.66 km |
| configuration | Six-lane divided highway with elevated viaducts, underpasses, flyovers and service roads |
| corridor_name | Gurugram–Sohna Highway / Sohna Elevated Corridor (NH-248A) |
| Current Status | Fully Operational |
| Estimated Cost | ₹2,000 Crore |
| chainage_scope | [object Object] |
| cost_breakdown | [object Object] |
| highway_number | NH-248A |
| total_length_km | 21.66 |
| concession_model | Hybrid Annuity Mode (HAM) |
| Target Completion | July 2022 |
| opening_milestones | [object Object] |
| toll_administration | [object Object] |
| implementation_agency | National Highways Authority of India (NHAI) |
| separate_project_note | [object Object] |
| Implementing Authority | NHAI |
| elevated_viaduct_length_km | 7 |
Ghamroj Toll Rates — FY 2026–27
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Ghamroj (Toll Plaza) | Plaza 1 | Location of the official NHAI Ghamroj toll plaza on NH-248A, with electronic FASTag lanes and local pass facilities. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Digital toll payments are accepted through FASTag and UPI. Vehicles without a valid, functional FASTag that opt for UPI payment are charged 1.25 times the applicable toll fee. Cash collection has been discontinued under the digital-only toll collection system.
Corridor Access Points & Major Locations
The 21.66 km corridor incorporates grade-separated elevated ramps, flyovers, and service roads with key access points:
- Rajiv Chowk (km 2.740): Northern starting point connecting NH-48 (Delhi–Gurugram Expressway / Delhi–Jaipur Highway) and Central Gurugram.
- Subhash Chowk: Major urban intersection with elevated ramp connections providing seamless grade separation above local Gurugram city traffic.
- Badshahpur: Dense urban commercial and residential hub bypassed by the six-lane elevated viaduct.
- Bhondsi / Jail Road (km 11.682): Package boundary between Package I and Package II, featuring entry/exit ramps connecting local traffic via service roads.
- Ghamroj (Toll Plaza): Location of the official NHAI Ghamroj toll plaza on NH-248A, with electronic FASTag lanes and local pass facilities.
- Sohna / NH-919 Junction (km 24.400): Southern project boundary connecting towards NH-919 (Rewari–Palwal) and onward high-speed connectivity to the Delhi–Mumbai Expressway and KMP Expressway network.
Administrative Coverage & Regional Scope
The corridor is situated entirely within the National Capital Region (NCR) in southern Haryana:
Traverses southern Gurugram from Rajiv Chowk through Badshahpur, Bhondsi, and Ghamroj to Sohna town and the NH-919 intersection.
Route Alignment & Highway Scope
The Gurugram–Sohna highway improvement project extends over 21.66 km along NH-248A from Rajiv Chowk (km 2.740) in Gurugram to Sohna at the NH-919 junction (km 24.400). Crucially, the corridor is not a 21.66 km continuous elevated viaduct; rather, it is a six-laning and strengthening project featuring approximately 7 km of elevated structures across congested urban sections—multiple elevated sections around Subhash Chowk and Badshahpur, alongside ground-level highway improvements, flyovers, underpasses and service roads. The project was constructed in two packages: Package I (km 2.740 to km 11.682, 8.942 km) and Package II (km 11.682 to km 24.400, 12.718 km).
Travel Advisory & Highway Conditions
At the time of its opening in July 2022, the corridor was reported to reduce travel time between Rajiv Chowk and Sohna from over 60 minutes to approximately 15–20 minutes, depending on traffic conditions. Digital toll payments are accepted through FASTag and UPI. Vehicles without a valid, functional FASTag that opt for UPI payment are charged 1.25 times the applicable toll fee. Cash collection has been discontinued under the digital-only toll collection system.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Sohna Elevated Corridor is a 21.66 km six-laning and highway-strengthening project along NH-248A in Haryana. It connects Rajiv Chowk in Gurugram with Sohna and includes approximately 7 km of elevated structures, upgraded carriageways, service roads, flyovers and grade-separated junctions.
The defined technical project length is 21.66 km, comprising Package I at 8.942 km and Package II at 12.718 km. The corridor runs from Rajiv Chowk at km 2.740 to Sohna near the NH-919 junction at km 24.400.
No. The project is a 21.66 km six-laning and strengthening scheme with approximately 7 km of elevated structures. The remaining sections include ground-level highway improvements, service roads, flyovers, underpasses and grade-separated junctions.
The corridor starts near Rajiv Chowk in Gurugram at NH-248A km 2.740 and extends south towards Sohna, ending near the NH-919 junction at km 24.400. It provides onward connectivity towards the Rewari–Palwal route and the wider Delhi–Mumbai Expressway and KMP Expressway networks.
Yes. The Sohna Elevated Corridor is operational. Package II, covering the Badshahpur–Sohna section, opened to traffic on 1 April 2022, while the remaining Rajiv Chowk–Badshahpur section had a trial opening on 12 July 2022, completing the corridor's opening.
The corridor opened in phases. Package II between Badshahpur and Sohna opened on 1 April 2022, followed by the trial opening of the remaining Rajiv Chowk–Badshahpur section on 12 July 2022.
The project was implemented through two Hybrid Annuity Mode (HAM) packages. Package I covers 8.942 km from Rajiv Chowk to Bhondsi, while Package II covers 12.718 km from Bhondsi to Sohna. Together, they account for the full 21.66 km project length.
The combined NHAI contract award for the two packages in March 2018 was ₹1,255.77 crore. The project was also reported to involve approximately ₹2,000 crore in capital investment at its July 2022 opening. These figures refer to different reported cost measures and should not be treated as identical.
The National Highways Authority of India (NHAI) implemented the Sohna Elevated Corridor along NH-248A in Haryana. The two packages were awarded under the Hybrid Annuity Mode (HAM) model.
Major locations include Rajiv Chowk, Subhash Chowk, Badshahpur, Bhondsi, Jail Road, Ghamroj and Sohna. The corridor includes elevated sections and access connections designed to improve movement through these urban and suburban areas.
Ghamroj Toll Plaza is located on NH-248A along the Gurugram–Sohna corridor in Haryana. It collects user fees from eligible vehicles using the highway and provides a concessional monthly pass for qualifying local residents.
The Ghamroj Toll Plaza tariff period listed for FY 2026–27 runs from 1 April 2026 to 31 March 2027. The applicable single-journey toll depends on the vehicle category. Check the published vehicle-wise tariff table for the exact car, jeep, van, bus, truck and multi-axle vehicle rates.
Yes. Eligible non-commercial vehicles belonging to residents living within 20 km of Ghamroj Toll Plaza qualify for a concessional monthly pass of ₹350, subject to the applicable eligibility and documentation requirements.
FASTag is the primary and mandatory electronic payment method at Ghamroj Toll Plaza, and cash collection has been discontinued according to the supplied project information. Vehicles without a functional FASTag that opt to pay through UPI are subject to a 1.25-times user-fee charge under the applicable fee rules.
The newly approved 2.75 km Sohna Chowk Elevated Corridor, costing ₹340.78 crore, is a separate infrastructure project and is not part of the original 21.66 km Sohna Elevated Corridor.
Related Infrastructure Projects
Delhi–Gurgaon Expressway
A 27.7 km 8/6-lane access-controlled expressway corridor along NH-48 linking New Delhi to Gurugram and IGI Airport with major grade separators and the Kherki Daula toll plaza.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Delhi–Panipat Expressway (NH-44)
An approximately 70.7 km eight-lane highway upgrade on NH-44 connecting Mukarba Chowk to Panipat, connecting with the separate 10 km six-lane Panipat Elevated Highway.