CORRIDOR DOSSIER INDEX // SOHNA-ELEVATED-CORRIDOR

Sohna Elevated Corridor (NH‑248A) Route Map, Toll Rates, Status & Latest Updates (2026)

Last Updated: 3 November 2026
StatusFully Operational
Length21.66 km
Corridor StatusAll 2 Packages Open (100%)
CompletionJuly 2022
Last Updated3 November 2026

The Sohna Elevated Corridor (NH-248A) is a 21.66 km 6-lane access-controlled highway featuring an 8.9 km elevated viaduct connecting Rajiv Chowk in Gurugram to Sohna. Fully commissioned in July 2022 by NHAI, it serves as the crucial feeder corridor directly linking Delhi-NCR with the main Delhi–Mumbai Expressway.

Project Summary

The Sohna Elevated Corridor is a 21.66 km six-laning and strengthening project along National Highway 248A (NH-248A) in Haryana, connecting Rajiv Chowk in Gurugram with Sohna. The project was executed in two Hybrid Annuity Mode (HAM) packages: Package I (8.942 km) and Package II (12.718 km). It includes upgraded highway carriageways, service roads, grade-separated junctions and approximately 7 km of elevated structures across congested sections, including the Badshahpur area. NHAI awarded the two packages in March 2018 for a combined contract value of ₹1,255.77 crore. At the July 2022 opening, the project was reported to involve approximately ₹2,000 crore in capital investment. The remaining Rajiv Chowk–Badshahpur section opened on a trial basis on 12 July 2022, completing the corridor's opening to traffic. The highway provides connectivity towards the Delhi–Mumbai Expressway and the KMP Expressway network.

सोहना एलिवेटेड कॉरिडोर (NH-248A)

सोहना एलिवेटेड कॉरिडोर गुरुग्राम के राजीव चौक से सोहना को जोड़ने वाला 21.66 किमी लंबा 6-लेन एक्सेस-नियंत्रित एक्सप्रेस कॉरिडोर है। यह दिल्ली-एनसीआर से दिल्ली-मुंबई एक्सप्रेसवे को सीधी सिग्नल-मुक्त हाई-स्पीड कनेक्टिविटी प्रदान करता है।

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length21.66 km
Estimated Cost₹2,000 Crore
Implementing AgencyNHAI
Current StatusFully Operational
CompletionJuly 2022
Route Map

Sohna Elevated Corridor (NH-248A) Route Map & Alignment

View and download the latest Sohna Elevated Corridor (NH-248A) route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Sohna Elevated Corridor (NH-248A) Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameSohna Elevated Corridor (NH-248A)
Total Length21.66 km
Estimated Cost₹2,000 Crore
Current StatusFully Operational
* Note: Reported Capital Investment: Approximately ₹2,000 crore (reported at the July 2022 opening). Original combined NHAI contract award: ₹1,255.77 crore (2018).
Project Parameters & Technical Details

Sohna Elevated Corridor (NH-248A)Cost • Route • Timeline

ParameterTechnical Details
statusFully Operational
packages[object Object],[object Object]
Project NameSohna Elevated Corridor (NH-248A)
Total Length21.66 km
configurationSix-lane divided highway with elevated viaducts, underpasses, flyovers and service roads
corridor_nameGurugram–Sohna Highway / Sohna Elevated Corridor (NH-248A)
Current StatusFully Operational
Estimated Cost₹2,000 Crore
chainage_scope[object Object]
cost_breakdown[object Object]
highway_numberNH-248A
total_length_km21.66
concession_modelHybrid Annuity Mode (HAM)
Target CompletionJuly 2022
opening_milestones[object Object]
toll_administration[object Object]
implementation_agencyNational Highways Authority of India (NHAI)
separate_project_note[object Object]
Implementing AuthorityNHAI
elevated_viaduct_length_km7
Applicable from 1 April 2026 to 31 March 2027 along NH-248A

Ghamroj Toll Rates — FY 2026–27

Fee Plazas on Corridor (NETC / NPCI Master)
1 Toll Point
No.Toll Plaza NamePlaza Code / ChainageInterchange Details & Connectivity
1Ghamroj (Toll Plaza)Plaza 1Location of the official NHAI Ghamroj toll plaza on NH-248A, with electronic FASTag lanes and local pass facilities.
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→

Digital toll payments are accepted through FASTag and UPI. Vehicles without a valid, functional FASTag that opt for UPI payment are charged 1.25 times the applicable toll fee. Cash collection has been discontinued under the digital-only toll collection system.

Entry, Exit & Interchange Junctions along NH-248A

Corridor Access Points & Major Locations

The 21.66 km corridor incorporates grade-separated elevated ramps, flyovers, and service roads with key access points:

  • Rajiv Chowk (km 2.740): Northern starting point connecting NH-48 (Delhi–Gurugram Expressway / Delhi–Jaipur Highway) and Central Gurugram.
  • Subhash Chowk: Major urban intersection with elevated ramp connections providing seamless grade separation above local Gurugram city traffic.
  • Badshahpur: Dense urban commercial and residential hub bypassed by the six-lane elevated viaduct.
  • Bhondsi / Jail Road (km 11.682): Package boundary between Package I and Package II, featuring entry/exit ramps connecting local traffic via service roads.
  • Ghamroj (Toll Plaza): Location of the official NHAI Ghamroj toll plaza on NH-248A, with electronic FASTag lanes and local pass facilities.
  • Sohna / NH-919 Junction (km 24.400): Southern project boundary connecting towards NH-919 (Rewari–Palwal) and onward high-speed connectivity to the Delhi–Mumbai Expressway and KMP Expressway network.
Corridor Geography & Route Nodes

Administrative Coverage & Regional Scope

The corridor is situated entirely within the National Capital Region (NCR) in southern Haryana:

Gurugram District
Package I (8.942 km) & Package II (12.718 km)

Traverses southern Gurugram from Rajiv Chowk through Badshahpur, Bhondsi, and Ghamroj to Sohna town and the NH-919 intersection.

Corridor Trajectory

Route Alignment & Highway Scope

The Gurugram–Sohna highway improvement project extends over 21.66 km along NH-248A from Rajiv Chowk (km 2.740) in Gurugram to Sohna at the NH-919 junction (km 24.400). Crucially, the corridor is not a 21.66 km continuous elevated viaduct; rather, it is a six-laning and strengthening project featuring approximately 7 km of elevated structures across congested urban sections—multiple elevated sections around Subhash Chowk and Badshahpur, alongside ground-level highway improvements, flyovers, underpasses and service roads. The project was constructed in two packages: Package I (km 2.740 to km 11.682, 8.942 km) and Package II (km 11.682 to km 24.400, 12.718 km).

Travel Guidance

Travel Advisory & Highway Conditions

At the time of its opening in July 2022, the corridor was reported to reduce travel time between Rajiv Chowk and Sohna from over 60 minutes to approximately 15–20 minutes, depending on traffic conditions. Digital toll payments are accepted through FASTag and UPI. Vehicles without a valid, functional FASTag that opt for UPI payment are charged 1.25 times the applicable toll fee. Cash collection has been discontinued under the digital-only toll collection system.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Sohna Elevated Corridor is a 21.66 km six-laning and highway-strengthening project along NH-248A in Haryana. It connects Rajiv Chowk in Gurugram with Sohna and includes approximately 7 km of elevated structures, upgraded carriageways, service roads, flyovers and grade-separated junctions.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Haryana Dashboard →HR
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement