The Delhi–Faridabad–Sohna Expressway (National Highway 148NA / DND Flyway extension) is a 59 km 6-lane access-controlled spur connecting Maharani Bagh / DND in South Delhi directly with the Delhi–Mumbai Expressway mainline at Sohna via Faridabad and Ballabhgarh. Designed to provide non-stop high-speed access to the national corridor while completely bypassing Mathura Road, the project features extensive elevated viaducts.
The ₹4,463-crore Delhi–Faridabad–Sohna Expressway is a 59.063 km six-lane access-controlled highway developed by NHAI under Bharatmala Pariyojana. It connects South Delhi with Faridabad and the KMP Expressway, providing onward connectivity to the Delhi–Mumbai Expressway network.
दिल्ली–फरीदाबाद–सोहना एक्सप्रेसवे (NH-148NA)
दिल्ली-फरीदाबाद-सोहना एक्सप्रेसवे (DND-KMP स्पर) दिल्ली और फरीदाबाद के यात्रियों को सीधे दिल्ली-मुंबई एक्सप्रेसवे से जोड़ने वाला 59 किमी लंबा 6-लेन का एक्सप्रेसवे है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Delhi–Faridabad–Sohna Expressway (NH-148NA) Route Map & Alignment
View and download the latest Delhi–Faridabad–Sohna Expressway (NH-148NA) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerDelhi–Faridabad–Sohna Expressway (NH-148NA)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Toll Plaza | Jita Kherli Kiranj Toll Plaza (Plaza Code: 312073) is located near Kiranj village in Nuh district, Haryana, at chainage 55.880 km. Published FY 2026–27 tariff listings report a tollable distance of 50.063 km. |
| Travel Time | During trial runs, media reports cited journey times ranging from approximately 30–45 minutes for travel between Delhi and destinations including Sohna and Palwal. These are reported trial-run estimates rather than guaranteed journey times. Actual travel times will depend on the starting point, destination, traffic, access arrangements and operating status of the corridor. |
| Project Cost | The Ministry of Road Transport and Highways reported an estimated project cost of ₹4,463 crore under Bharatmala Pariyojana. Separately, the December 2024 Lok Sabha statement lists package-wise construction costs totalling ₹4,903.89 crore (Package 1: ₹2,017.42 crore; Package 2: ₹1,908.40 crore; Package 3: ₹978.07 crore). These are separately reported cost figures, and the cited documents do not provide a detailed reconciliation between them. |
| Project Name | Delhi–Faridabad–Sohna Expressway (NH-148NA) |
| Total Length | 59.063 km |
| Configuration | Six-lane access-controlled highway |
| Official Name | Delhi–Faridabad–Sohna Expressway (DND–Faridabad–Sohna Highway, NH-148NA) |
| Current Status | Partially Operational |
| Estimated Cost | ₹4,463 Crore |
| Highway Number | NH-148NA |
| Project Status | Partially Operational |
| Total Packages | All three packages constructed; two operational, one under trial |
| Completion Target | 2026 |
| Districts Covered | South East Delhi (NCT), Faridabad District (Haryana), Palwal & Nuh Districts (Haryana). |
| Inauguration Date | November 2024 |
| Target Completion | 2026 |
| Jewar Airport Link | The separate 31.42 km Greenfield Connectivity to Jewar International Airport project has a revised total capital cost of ₹3,630.77 crore, approved by the Cabinet Committee on Economic Affairs in March 2026. |
| Implementing Agency | National Highways Authority of India (NHAI) |
| Commissioning Status | Packages 2 and 3 operational; Package 1 has entered trial operations, with formal commissioning pending. |
| Delhi Section Status | 9 km DND Flyway–Jaitpur section open on a toll-free trial basis (40 km/h trial speed limit); opposite carriageway closed for safety works; NHAI conducting load testing ahead of full commissioning. |
| Haryana Section Status | Operational (Package 2 open since Sept 2024; Package 3 open since May 2023) with electronic FASTag tolling at Kiranj Toll Plaza. |
| Implementing Authority | NHAI |
| Key Engineering Feature | 140 m Network Arch Bridge over Agra Canal on Delhi connection (tied-arch with crossed hangers, precast segmental construction, launching girders, high-strength steel). |
| Official Corridor Length | 59.063 km (Principal alignment cited in MoRTH / PIB releases) |
| Southern Terminal Junction | KMP Expressway Terminal Junction (km 59.063): The southern end of NH-148NA connects with the KMP Expressway and the NH-148N Delhi–Vadodara Expressway section, providing onward connectivity to the Delhi–Mumbai Expressway network. |
| Package Alignment Breakdown | The highway is divided into three construction packages. Package 1 covers the 9 km DND–Jaitpur section (design chainage 0–9 km). Package 2 covers the 24 km main alignment between Jaitpur and the Sector 62/65 junction (design chainage 9–33 km), together with a 1.38 km spur to NH-19 near Badarpur Border (from chainage 13.200), giving a combined package length of 25.38 km. Package 3 covers the 26.063 km section from Sector 62/65 to the KMP Expressway junction (design chainage 33–59.063 km). |
| Package Awards Breakdown (Parliamentary Records) | Package 1: 9 km (₹2,017.42 Cr) | Package 2: 25.38 km (₹1,908.40 Cr) | Package 3: 26.063 km (₹978.07 Cr). Total package construction awards sum to ₹4,903.89 Cr (Lok Sabha Question No. 157, Dec 5, 2024). |
Delhi–Faridabad–Sohna Expressway Toll Rates (NH-148NA)
The Jita Kherli Kiranj Toll Plaza (Plaza Code: 312073) is located near Kiranj village in Nuh district, Haryana, at chainage 55.880 km. Published FY 2026–27 tariff listings report a tollable distance of 50.063 km. The published rates are effective from 1 April 2026 to 31 March 2027:
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | KMP Expressway Terminal Junction | km 59.063 | The southern end of NH-148NA connects with the KMP Expressway and the NH-148N Delhi–Vadodara Expressway section, providing onward connectivity to the Delhi–Mumbai Expressway network. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Published FY 2026–27 listings show a ₹350 monthly concession pass for eligible local non-commercial vehicles residing within 20 km of the toll plaza. Under the National Highways Fee (Determination of Rates and Collection) (Fifth Amendment) Rules, 2026, effective 1 November 2026, a concessional annual Local Pass is available for eligible non-commercial vehicles residing within 20 km of National Highway fee plazas. The annual fee is ₹1,500 for eligible plazas outside municipal or local town limits and ₹3,000 for those within these limits. Applicants must have a valid functional FASTag registered for non-commercial use. The pass is subject to eligibility restrictions and is valid only for the designated toll plaza. Availability and eligibility at Jita Kherli Kiranj Toll Plaza must be confirmed with NHAI or the toll operator. Under the National Highways Fee (Determination of Rates and Collection) (Third Amendment) Rules, 2026, effective 10 April 2026, vehicles entering a fee plaza without a FASTag or a valid, functional FASTag and opting to pay through UPI are charged 1.25 times the applicable user fee. This surcharge applies to vehicles without a valid FASTag and does not apply to ordinary UPI payments made by FASTag-compliant users. The Government has announced a transition towards digital-only toll payments at National Highway fee plazas through FASTag and UPI. Implementation should be verified against the latest NHAI instructions applicable to the individual plaza.
Key Interchanges & Package Layout
The highway is divided into three construction packages. Package 1 covers the 9 km DND–Jaitpur section. Package 2 covers the 24 km main alignment between Jaitpur and the Sector 62/65 junction, together with a spur to NH-19 near Badarpur Border, giving a combined package length of 25.38 km. Package 3 covers the 26.063 km section from Sector 62/65 to the KMP Expressway junction:
- Package 1: DND Flyway & Ring Road (Maharani Bagh) to Jaitpur (9 km, ₹2,017.42 Cr): Elevated urban viaduct along Agra Canal featuring a 140 m Network Arch Bridge (design chainage 0–9 km). Construction of Package 1 has been reported complete, with trial operations reported on one carriageway of the approximately 9 km DND–Jaitpur section. The section remains subject to technical evaluations, load testing and formal commissioning by NHAI. During reported trial operations, a speed restriction of 40 km/h was applied. Full operational status should not be assumed until NHAI confirms formal commissioning.
- Package 2: Jaitpur to Sector 62/65 Faridabad (25.38 km package, ₹1,908.40 Cr): Covers the 24 km main alignment (design chainage 9–33 km) together with a 1.38 km spur from chainage 13.200 to NH-19 near Badarpur Border. Open to traffic since September 2024.
- Package 3: Sector 62/65 Faridabad to KMP Junction (26.063 km, ₹978.07 Cr): Design chainage 33–59.063 km traversing southern Haryana past Jita Kherli Kiranj Toll Plaza (km 55.880) in Nuh district to the KMP Expressway junction. Open to traffic since May 2023.
- KMP Expressway Terminal Junction (km 59.063): The southern end of NH-148NA connects with the KMP Expressway and the NH-148N Delhi–Vadodara Expressway section, providing onward connectivity to the Delhi–Mumbai Expressway network.
Districts & Areas Covered
Traversing verified administrative districts across Delhi and Haryana:
DND Flyway, Maharani Bagh, Kalindi Kunj corridor, and Agra Canal elevated viaduct with 140 m Network Arch Bridge
Jaitpur to Sector 62/65 dividing road along the Faridabad–Ballabgarh bypass, including Badarpur Border spur
Traverses Palwal and Nuh up to Jita Kherli Kiranj Toll Plaza (km 55.880) and KMP Expressway terminal junction
Route Alignment & Packages
The 59.063 km Delhi–Faridabad–Sohna Access Controlled Highway (NH-148NA) originates in South Delhi with interchanges connecting the Ring Road near Maharani Bagh and the DND Flyway. The alignment runs parallel to the Yamuna and along the Agra Canal via an elevated viaduct through Kalindi Kunj into Jaitpur (Package 1: 9 km), continues south along the 6-lane Faridabad Bypass (Package 2: 24 km mainline plus 1.38 km Badarpur spur = 25.38 km), and traverses southern Haryana past Kiranj in Nuh district to terminate at the KMP Expressway junction (Package 3: 26.063 km), providing connectivity to the KMP Expressway and the NH-148N Delhi–Vadodara Expressway section. The official corridor length is 59.063 km, while the three package lengths listed in the December 2024 parliamentary statement total 60.443 km including the Badarpur spur.
Travel Advisory
During trial runs, media reports cited journey times ranging from approximately 30–45 minutes for travel between Delhi and destinations including Sohna and Palwal. These are reported trial-run estimates rather than guaranteed journey times. Actual travel times will depend on the starting point, destination, traffic, access arrangements and operating status of the corridor.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Delhi–Faridabad–Sohna Expressway, also known as the DND–Faridabad–Sohna Access Controlled Highway (NH-148NA), is a six-lane highway connecting South Delhi with Faridabad and Sohna in Haryana. It is being developed under the Bharatmala Pariyojana to improve connectivity across the Delhi-NCR region.
The total length of the Delhi–Faridabad–Sohna Expressway (NH-148NA) is approximately 59.063 km. The corridor is divided into three construction packages covering sections in Delhi and Haryana.
Packages 2 and 3, covering approximately 50 km in Haryana, are operational. The 9 km DND–Jaitpur section in Delhi has undergone trial operations on one carriageway, with full commissioning formalities still pending. Check the latest traffic advisories before travelling.
The final Delhi section has undergone trial operations and technical evaluations. However, a confirmed date for full commissioning should be announced by NHAI or the Ministry of Road Transport and Highways. Follow official announcements for the latest opening information.
The corridor starts near the DND Flyway and South Delhi, passes through Jaitpur and Faridabad, and continues towards Sohna and the KMP Expressway junction. It provides connectivity to important highway networks in southern Haryana and the wider Delhi-NCR region.
The expressway improves road connectivity between Delhi, Faridabad, Ballabhgarh and Sohna, with onward access towards Palwal and the KMP Expressway. It is expected to benefit commuters and commercial traffic travelling between South Delhi and southern Haryana.
The project consists of three construction packages: Package 1 connects DND Flyway to Jaitpur and is approximately 9 km long; Package 2 connects Jaitpur to Sector 62/65 in Faridabad and is approximately 25.38 km long, including the Badarpur spur; Package 3 connects Faridabad to the KMP Expressway junction and is approximately 26.063 km long. The main corridor is 59.063 km, excluding the additional Badarpur spur.
The estimated project cost of the 59.063 km Delhi–Faridabad–Sohna Expressway is approximately ₹4,463 crore. The project is being implemented by the National Highways Authority of India (NHAI) under the Bharatmala Pariyojana.
The National Highways Authority of India (NHAI), under the Ministry of Road Transport and Highways, is responsible for implementing the DND–Faridabad–Sohna Access Controlled Highway project. The corridor is part of the Government of India's Bharatmala Pariyojana.
The Jita Kherli Kiranj Toll Plaza is associated with the Haryana section of the corridor. It is located near Kiranj village in Nuh district, Haryana. Toll charges depend on vehicle category and the applicable fee schedule.
Toll charges vary according to vehicle type, including cars, light commercial vehicles, buses, trucks and multi-axle vehicles. For FY 2026–27, the listed single-journey toll for a car, jeep or van is ₹155 at the Jita Kherli Kiranj Toll Plaza. Refer to the toll-rate table on this page for return-journey and monthly-pass charges.
During reported trial runs, the journey from Sarai Kale Khan to Sohna and Palwal took approximately 40–45 minutes, compared with up to three hours on existing routes during peak traffic. Actual journey times depend on traffic, entry and exit points, and operating conditions.
Yes. The corridor provides onward connectivity to the Delhi–Mumbai Expressway network through its connection towards the KMP Expressway and the southern Haryana highway network. This improves access between Delhi-NCR and major destinations along the Delhi–Mumbai corridor.
The corridor is part of the broader road network planned to improve connectivity towards Noida International Airport at Jewar. A separate 31.42 km greenfield connectivity project has been approved to connect the airport with the Delhi–Faridabad–Ballabhgarh–Sohna spur of the Delhi–Mumbai Expressway. This airport connector is a separate project and is not included in the 59.063 km NH-148NA length.
The expressway is expected to provide an alternative route for traffic travelling between South Delhi, Faridabad and southern Haryana. By improving access to the highway network, it could reduce pressure on congested roads and junctions such as Ashram Chowk, Kalindi Kunj and Mathura Road.
Related Infrastructure Projects
Delhi–Gurgaon Expressway
A 27.7 km 8/6-lane access-controlled expressway corridor along NH-48 linking New Delhi to Gurugram and IGI Airport with major grade separators and the Kherki Daula toll plaza.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Delhi–Meerut Expressway (NE-3)
An approximately 82 km access-controlled expressway corridor (NE-3) connecting Sarai Kale Khan / Nizamuddin in Delhi to Partapur in Meerut via Dasna, featuring 14 lanes on the first 28 km alongside NH-24 and 6 lanes to Meerut.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.