CORRIDOR DOSSIER // NOIDA-GREATER-NOIDA-EXPRESSWAY

Noida–Greater Noida Expressway Route Map, Toll Rates, Status & Latest Updates (2026)

Mahamaya Flyover to Pari Chowk • Last Updated: November 2026
The Noida–Greater Noida Expressway (NGN Expressway) is a 24.53 km, 6-lane access-controlled, toll-free expressway linking Noida (Mahamaya Flyover) to Greater Noida (Pari Chowk / Yamuna Expressway Zero Point). Commissioned in 2002 at ₹400 Crore to decongest old NH-2, it serves as the primary spine for IT parks, residential sectors, Aqua Line Metro interchanges, and Jewar Airport transit.

Built in 2002 at an original cost of ₹400 Crore, the 24.53 km six-lane Noida–Greater Noida Expressway connects Mahamaya Flyover (Sector 15A/16A, linking DND Flyway and Kalindi Kunj) directly to Pari Chowk and the Yamuna Expressway Zero Point in Greater Noida. Operating completely toll-free with a standard speed limit of 100 km/h for light motor vehicles (75 km/h during winter fog), the corridor continues to expand capacity via diaphragm-wall underpasses at Sultanpur and Jhatta, existing underpasses at Sector 96, 142/168, and Kondli, a planned Sector 148–150 arch flyover, plus feeder projects like the Chilla Elevated Road.

Project Summary

“Built in 2002 at an original cost of ₹400 Crore, the 24.53 km six-lane Noida–Greater Noida Expressway connects Mahamaya Flyover (Sector 15A/16A, linking DND Flyway and Kalindi Kunj) directly to Pari Chowk and the Yamuna Expressway Zero Point in Greater Noida. Operating completely toll-free with a standard speed limit of 100 km/h for light motor vehicles (75 km/h during winter fog), the corridor continues to expand capacity via diaphragm-wall underpasses at Sultanpur and Jhatta, existing underpasses at Sector 96, 142/168, and Kondli, plus feeder projects like the Chilla Elevated Road.”

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length24.5 km
Estimated Cost₹400 Crore
Implementing AgencyNoida Authority / GNIDA
Current StatusFully Operational
Completion2002

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Route Map

Route Map & Expressway Alignment (Mahamaya Flyover to Pari Chowk)

Interactive GIS dual-carriageway alignment of the 24.53 km Noida–Greater Noida Expressway from Mahamaya Flyover (Sector 15A/16A) to Pari Chowk / Yamuna Expressway Zero Point, featuring 9 major interchange points and Metro crossings.

Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project Name📍 Noida–Greater Noida Expressway Route Map, Toll Rates, Status & Latest Updates (2026)
Total Length24.5 km (6 Lanes)
Cost₹400 Crore
Toll CollectionToll-Free
Project Parameters & Technical Details

Technical Specifications & Engineering Parameters

ParameterVerified Details
Official Project NameNoida–Greater Noida Expressway (NGN Expressway)
Official Project NameNoida–Greater Noida Expressway (NGN Expressway)
Total Corridor Length24.53 km (15.24 miles) • Dual 3+3 Divided Access-Controlled Carriageway
Original Project Cost (2002)₹400 Crore (Original 2002 Build) • Ongoing Underpass Upgrades
Implementing AuthoritiesNoida Authority / GNIDA
Origin PointMahamaya Flyover / Sector 15A & 16A (DND Flyway & Chhalera Interface, Noida)
Terminus PointPari Chowk / Yamuna Expressway Zero Point (Knowledge Park, Greater Noida)
Maximum Speed Limit100 km/h (Cars/SUVs) • 60 km/h (Heavy Vehicles); 75/50 km/h in Winter Fog (Dec 15 – Feb 15)
Toll StatusToll-Free (100% Toll-Free Access-Controlled Public Expressway)
Commissioned Year2002 (Commissioned & Operational)
Key Upgrades & UnderpassesSector 96, 142/168 & Kondli (Km 19.4) operational; Sultanpur (Sec 128) & Jhatta (Sec 145/146) underpasses advancing

Corridor Evolution, Underpasses & Parallel Expansion Links

Inaugurated in 2002 at an original cost of ₹400 Crore, the 24.53 km Noida–Greater Noida Expressway was constructed to divert Delhi–Agra highway traffic off congested old NH-2 corridors through Faridabad, Ballabhgarh, and Palwal. Over two decades, rapid development of residential sectors, corporate tech campuses, and the Noida Metro Aqua Line transformed the expressway into NCR's primary suburban corridor, prompting grade-separated box-pushing underpasses at Sector 96 (Noida Authority HQ / Amity corridor), Sector 142/168 (Advant Navis hub), and Kondli at Km 19.4.

Operating completely toll-free under the jurisdiction of the Noida Authority and GNIDA, the expressway features standard speed limits of 100 km/h for light vehicles (cars/SUVs) and 60 km/h for heavy commercial vehicles, adjusted downward during the winter fog window (typically 15 December to 15 February) to 75 km/h and 50 km/h respectively.

To handle expanding passenger flows toward the upcoming Noida International Airport (Jewar), the Noida Authority is advancing two new ~700m diaphragm-wall underpasses at Sultanpur (Sector 128, ~₹80 Cr) and Jhatta (Sector 145/146, ~₹100 Cr) vetted by IIT Roorkee to prevent carriageway subsidence. Additionally, to eliminate recurring monsoon waterlogging and peak-hour bottlenecks at the existing Kondli underpass, a Detailed Project Report (DPR) for a 610m pillarless arch flyover connecting Sectors 148 and 150 (~₹84.16 Cr) has been vetted.

Regional commuter dispersal is further supported by feeder projects including the 5.5 km Chilla Elevated Road (~₹893 Cr, ~55% progress, target mid-2027) linking Mayur Vihar directly to Mahamaya Flyover, and the proposed 31–32 km Yamuna Pushta parallel expressway being planned with NHAI and the UP Irrigation Department.

Major Interchanges, Underpasses & Sectors Along Alignment:
📍 Mahamaya Flyover (Sector 15A / 16A) [Km 0.0]Northern origin linking DND Flyway, Kalindi Kunj, Mayur Vihar & Chilla Regulator
📍 Sector 44 & Botanical Garden Interchange [Km 2.5]Arterial link to Noida Golf Course, Magenta/Blue Line Metro & City Centre
📍 Amity University & Sector 96/125/126 [Km 4.5]Sector 96 4-lane box-pushing underpass & Noida Authority HQ complex
📍 Sector 128 / 132 (Wish Town & Sultanpur) [Km 11.5]Institutional hub, Jaypee Wish Town & upcoming ~700m Sultanpur underpass (~₹80 Cr)
📍 Sector 142 / 168 (Advant Navis & Aqua Line) [Km 14.5]Major IT business hub, Sector 142 Metro station & box-pushing underpass
📍 Sector 145 / 146 & Jhatta Crossing [Km 16.8]Upcoming ~₹100 Cr diaphragm-wall Jhatta underpass connecting Sectors 155/159
📍 Sector 148 / 150 & Kondli Crossing [Km 19.4]Operational 785m Kondli underpass & planned ₹84.16 Cr Sector 148–150 arch flyover
📍 Pari Chowk / Yamuna Expressway Zero Point [Km 24.53]Southern terminus connecting Yamuna Expressway toward Jewar Airport & Agra
Toll Intelligence & Expressway Feeder Audit · Noida–Greater Noida Expressway

Noida–Greater Noida Expressway Toll Status & Rules

24.53 km Mahamaya Flyover to Pari Chowk Corridor (100% Toll-Free Access-Controlled Expressway)

100% Toll-Free · Authority Notified
Corridor Classification100% Toll-FreeListed in National Toll Directory · State: Delhi-NCR, UP
Toll Plazas0 Toll PlazasCompletely free-flow access-controlled highway
Passenger Car Toll₹0 (Toll-Free)Zero toll for all private and commercial vehicles
Feeder ConnectionYamuna Expy FeederTransitions to tolled Yamuna Expressway at Pari Chowk
Tolling System & Operational Audit

The Noida–Greater Noida Expressway is a 6-lane access-controlled arterial highway connecting Mahamaya Flyover (Sector 16A, Noida) to Pari Chowk (Greater Noida). Developed by the Noida Authority and GNIDA, the entire 24.53 km corridor operates 100% toll-free with zero user fee charged. At Pari Chowk, southbound commuters transition seamlessly into the tolled Yamuna Expressway (operated under YEIDA closed-loop FASTag tolling).

Corridor Terminals & Interchanges

24.53 km Toll-Free Corridor
No.Fee Plaza / FacilityChainage / PointDistrict / StateClassificationRole & Corridor Scope
1Mahamaya Flyover to Pari Chowk CorridorKm 0 to Km 24.53Delhi-NCR / UPToll-Free ExpresswayAccess-controlled 6-lane expressway; completely toll-free feeder connecting directly into Yamuna Expressway at Pari Chowk.
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments & News Timeline

Verified project updates from news sources and official announcements
Video Coverage

Video Coverage & Drone Updates

Latest drone footage, progress reports, and ground coverage
Corridor Expansion & Underpasses

Mainline Sections, Underpasses & Feeder Links

Operational status and ongoing decongestion works
Operational Grade-Separated Underpasses (Sector 96, Sector 142/168 & Kondli)Fully Operational

Operational 4-lane box-pushing underpasses at Sector 96 (Amity/Authority HQ corridor), Sector 142/168 (Advant Navis hub), and the 785m Kondli underpass at Km 19.4 (Sector 148/150).

Progress100%
Agency: Noida Authority Civil WorksStatus: Completed & Open to Traffic
New Diaphragm-Wall Underpasses: Sultanpur (Sector 128) & Jhatta (Sector 145/146)Under Execution / Tendering

Two ~700m underpasses utilizing diaphragm-wall engineering to eliminate carriageway subsidence: Sultanpur underpass (~₹80 Cr, Sector 128/129) and Jhatta underpass (~₹100 Cr, Sector 145/146 connecting Sectors 155/159).

Progress25%
Agency: Noida Authority (IIT Roorkee Vetted)Status: Phased Execution (18-Month Construction Window)
Mainline 6-Lane Expressway (Mahamaya Flyover to Pari Chowk — 24.53 km)Operational (Since 2002 • Toll-Free)

Full 24.53 km dual 3+3 access-controlled concrete/asphalt carriageway with 45m service roads, automated ITMS surveillance cameras, and seamless Yamuna Expressway transition at Pari Chowk.

Progress100%
Agency: Noida Authority & GNIDAStatus: Operational (Built 2002 at ₹400 Cr)
Feeder & Parallel Corridors: Chilla Elevated Road, Sec 148-150 Flyover & Yamuna PushtaUnder Construction / DPR Stage

5.5 km 6-lane Chilla Elevated Road (~₹893 Cr, ~55% complete, linking Mayur Vihar to Mahamaya Flyover by mid-2027), 610m Sector 148–150 arch flyover (~₹84.16 Cr DPR), and 31–32 km Yamuna Pushta expressway (NHAI DPR stage).

Progress55%
Agency: UP Bridge Corporation / Noida Authority / NHAIStatus: Chilla Link: Mid-2027 • Pushta Road: DPR Stage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Noida–Greater Noida Expressway spans 24.53 km (15.24 miles) with a 6-lane access-controlled dual carriageway. It starts at Mahamaya Flyover (Sector 15A/16A in Noida, connecting with DND Flyway, Mayur Vihar, and Kalindi Kunj) and terminates at Pari Chowk / Zero Point in Greater Noida, transitioning directly onto the Yamuna Expressway.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement