The Jaipur–Bandikui Greenfield Expressway (National Expressway 4C / NE-4C) is a 67 km 4-lane access-controlled greenfield expressway developed by NHAI. Acting as the dedicated Jaipur spur of the Delhi–Mumbai Expressway, it connects the DME interchange at Bandikui directly to Bagrana / Ring Road near Jaipur, reducing driving time between Delhi NCR and Jaipur to just 3.5 hours.
The ₹1,368-crore Jaipur–Bandikui Greenfield Expressway (NE-4C) is a 66.916 km four-lane access-controlled highway developed by NHAI under Bharatmala Pariyojana Phase-I via HAM. It connects the Delhi–Vadodara Greenfield Expressway near Bandikui with Bagrana near Jaipur at NH-21, providing direct connectivity to the Delhi–Mumbai Expressway corridor.
जयपुर बांदीकुई एक्सप्रेसवे (NE-4C)
जयपुर बांदीकुई एक्सप्रेसवे (NE-4C) दिल्ली-मुंबई एक्सप्रेसवे को सीधे जयपुर शहर से जोड़ने वाला 67 किमी लंबा 4-लेन का ग्रीनफील्ड एक्सप्रेसवे है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Jaipur–Bandikui Greenfield Expressway (NE-4C) Route Map & Alignment
View and download the latest Jaipur–Bandikui Greenfield Expressway (NE-4C) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerJaipur–Bandikui Greenfield Expressway (NE-4C)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| lanes | 4 Lanes (expandable to 6) |
| model | Hybrid Annuity Mode (HAM) |
| origin | Shyamsinghpura (near Bandikui, Dausa district) — Junction with Delhi–Vadodara Expressway |
| status | Operational — Completion Certificate issued on 30 June 2026; commercial operation effective from 1 October 2025 |
| program | Bharatmala Pariyojana Phase I |
| length_km | 66.916 |
| structures | [object Object] |
| destination | Bagrana (Jaipur district) — Junction with NH-21 Agra Road & Jaipur Ring Road |
| Project Name | Jaipur–Bandikui Greenfield Expressway (NE-4C) |
| Total Length | 66.916 km |
| project_type | Greenfield Expressway Spur |
| configuration | Four-lane access-controlled greenfield expressway spur |
| Current Status | Fully Operational |
| Estimated Cost | ₹1,368 Crore |
| appointed_date | 11 November 2022 |
| concessionaire | GR Bandikui Jaipur Expressway Private Limited (G R Infraprojects Ltd.) |
| estimated_cost | ₹1,368 crore (Bid project cost, excluding GST) |
| Completion Date | October 2025 |
| completion_date | Completion Certificate: 30 June 2026 |
| Inauguration Date | 28 February 2026 |
| Target Completion | October 2025 |
| districts_covered | Dausa,Jaipur |
| highway_designation | National Expressway 4C (NE-4C) |
| implementing_agency | National Highways Authority of India (NHAI) |
| Implementing Authority | NHAI |
| formal_inauguration_date | 28 February 2026 (by Prime Minister Narendra Modi) |
| commercial_operation_date | 1 October 2025 (declared in Completion Certificate) |
NE-4C Toll Plazas, Locations & FASTag System
NE-4C uses an entry/exit-based tolling arrangement. The system has five physical fee plazas and one virtual fee plaza at Shyamsinghpura. Toll charges depend on the vehicle category and the distance travelled between the applicable entry and exit points. The Government's statutory fee notification specifies the fee-plaza chainages and distance matrix. Travellers should check the applicable FASTag charge for their actual journey before travelling. The Gazette also includes an important technical detail: the toll calculation accounts for equivalent road length for certain structures longer than 60 metres. Therefore, do not calculate a fare simply by subtracting two plaza chainages and applying a per-kilometre rate.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Shyamsinghpura | km 1.200 | Virtual fee plaza handles tolling for the connection with the Delhi–Vadodara Expressway (NE-4 mainline). Coordinates electronic FASTag tracking without physical barrier queues. |
| 2 | Bedoli Fee Plaza | km 13.282 | Physical fee plaza with grade-separated entry/exit connecting local and regional arterial routes in Dausa district. |
| 3 | Kuri Khurd Fee Plaza | km 26.482 | Physical fee plaza serving the central Dausa agricultural and logistics belt. |
| 4 | Sundarpura Fee Plaza | km 39.953 | Physical fee plaza serving eastern Jaipur district and Jamwaramgarh. |
| 5 | Gella Ki Nangal Fee Plaza | km 60.839 | Physical fee plaza serving Bassi and the eastern outer periphery of Jaipur. |
| 6 | Bagrana Fee Plaza | km 66.448 | Physical fee plaza at the western terminus of NE-4C connecting with NH-21 near Bagrana. Expressway ends at km 66.916. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Designated Toll Plazas and Access Interchanges along NE-4C
The official fee-plaza register and project alignment identify six tolling locations ordered from km 1.200 near Bandikui to km 66.448 at Jaipur:
- Shyamsinghpura (km 1.200): Virtual Fee Plaza & direct trumpet interchange connection to Delhi–Vadodara Expressway (NE-4 mainline) in Dausa district
- Bedoli (km 13.282): Physical Fee Plaza with grade-separated entry/exit connecting local arterial routes in Dausa district
- Kuri Khurd (km 26.482): Physical Fee Plaza with grade-separated entry/exit serving Senthal Road and central Dausa logistics belt
- Sundarpura (km 39.953): Physical Fee Plaza with grade-separated entry/exit serving Jamwaramgarh Road and eastern Jaipur district
- Gella Ki Nangal (km 60.839): Physical Fee Plaza with grade-separated entry/exit serving Bassi and the eastern outer region of Jaipur
- Bagrana (km 66.448): Physical Fee Plaza & terminal access point connecting NH-21 (Agra Road) and the Jaipur Ring Road
Districts & Major Locations Along the Expressway
The 66.916 km Jaipur–Bandikui Greenfield Expressway passes through two districts in Rajasthan:
- Shyamsinghpura: Virtual fee-plaza location at km 1.200
- Bedoli: Physical fee plaza at km 13.282
- Kuri Khurd: Physical fee plaza at km 26.482
- Sundarpura: Physical fee plaza at km 39.953
- Gella Ki Nangal: Physical fee plaza at km 60.839
- Bagrana: Physical fee plaza at km 66.448 (expressway terminates at km 66.916 near NH-21)
The district-wise lengths are published by the project concessionaire. The fee-plaza locations and chainages are specified in the Government of India's statutory notification.
Route Alignment & Corridor Trajectory
The western end connects to the Delhi–Vadodara Greenfield Expressway near Bandikui, while the eastern end terminates near Bagrana at NH-21 in Jaipur district. The project forms part of Bharatmala Pariyojana Phase-I and was implemented as a single HAM concession project.
Travel Advisory & Corridor Connectivity
The Jaipur–Bandikui Expressway provides access-controlled connectivity between Jaipur and the Delhi–Vadodara Greenfield Expressway near Bandikui. It gives Jaipur-bound and Delhi-bound travellers an alternative connection to the wider Delhi–Mumbai Expressway corridor. The applicable toll depends on the entry and exit points and vehicle category. Actual journey time varies with traffic, weather, toll processing and conditions on connecting highways.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Jaipur–Bandikui Greenfield Expressway (NE-4C), also known as the Bandikui–Jaipur spur, is a 66.916 km, four-lane, access-controlled greenfield expressway in Rajasthan. It connects the Delhi–Vadodara Greenfield Expressway near Bandikui with Bagrana near Jaipur.
The Jaipur–Bandikui Expressway (NE-4C) is 66.916 km long. It is a four-lane, access-controlled corridor running through Dausa and Jaipur districts in Rajasthan.
The Jaipur–Bandikui Greenfield Expressway is designated National Expressway 4C (NE-4C). It is a separate expressway spur connecting the Delhi–Vadodara Expressway with Jaipur's NH-21 corridor near Bagrana.
Yes. The Jaipur–Bandikui Expressway is operational. It received a Provisional Completion Certificate on 19 June 2025, its commercial operation became effective on 1 October 2025, and its final Completion Certificate was issued on 30 June 2026. It was formally inaugurated on 28 February 2026.
The Jaipur–Bandikui Expressway had a bid project cost of ₹1,368 crore, excluding GST. The project was implemented under the Hybrid Annuity Mode (HAM) as part of Bharatmala Pariyojana Phase-I.
The expressway starts near Bandikui in Dausa district, where it connects to the Delhi–Vadodara Greenfield Expressway (NE-4). It runs towards Bagrana in Jaipur district and terminates near NH-21.
The 66.916 km Jaipur–Bandikui Expressway passes through two Rajasthan districts: Dausa district, covering approximately 32.750 km, and Jaipur district, covering approximately 34.166 km.
The NE-4C tolling system identifies six tolling locations: Shyamsinghpura (km 1.200), Bedoli (km 13.282), Kuri Khurd (km 26.482), Sundarpura (km 39.953), Gella Ki Nangal (km 60.839), and Bagrana (km 66.448). Shyamsinghpura is the virtual fee plaza; the other five are physical fee plazas.
The Jaipur–Bandikui Expressway has five physical fee plazas and one virtual fee plaza, making six designated tolling locations in total. These are arranged from Shyamsinghpura near the Bandikui end to Bagrana near Jaipur.
Toll charges on NE-4C are based on the vehicle category and the distance between the applicable entry and exit points, using an entry/exit-based FASTag system. The statutory fee notification also accounts for equivalent road length for certain structures longer than 60 metres, so fares cannot be reliably calculated using plaza chainage differences alone.
Yes. The Jaipur–Bandikui Expressway connects to the Delhi–Vadodara Greenfield Expressway near Bandikui. The Delhi–Vadodara corridor forms part of the wider Delhi–Mumbai Expressway project, providing Jaipur with access to the Delhi–Mumbai Expressway network.
The project was implemented by GR Bandikui Jaipur Expressway Private Limited, a wholly owned subsidiary of G R Infraprojects Limited, under a Hybrid Annuity Mode (HAM) concession. NHAI is the implementing agency.
The Jaipur–Bandikui Expressway has completed its construction and certification milestones. The Provisional Completion Certificate was issued on 19 June 2025, commercial operation became effective on 1 October 2025, and the final Completion Certificate was issued on 30 June 2026.
The concessionaire's published project specifications list three interchanges, one railway overbridge, two flyovers, 11 vehicular underpasses, 17 small vehicular underpasses, two major bridges, 11 minor bridges and 136 box culverts, along with five additional box culverts.
The Jaipur–Bandikui Expressway provides access-controlled connectivity between Jaipur and the Delhi–Vadodara Expressway near Bandikui. Actual journey time depends on the entry and exit points, traffic, weather, toll processing and conditions on connecting roads; a fixed travel time should not be assumed.
Related Infrastructure Projects
Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Delhi–Gurgaon Expressway
A 27.7 km 8/6-lane access-controlled expressway corridor along NH-48 linking New Delhi to Gurugram and IGI Airport with major grade separators and the Kherki Daula toll plaza.
View Project →Delhi–Panipat Expressway (NH-44)
An approximately 70.7 km eight-lane highway upgrade on NH-44 connecting Mukarba Chowk to Panipat, connecting with the separate 10 km six-lane Panipat Elevated Highway.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.