Advertisement // Sponsor

Verified Partner
Loading sponsor...
CORRIDOR DOSSIER INDEX // JAIPUR-BANDIKUI-EXPRESSWAY

Jaipur–Bandikui Greenfield Expressway (NE‑4C) Route Map, Toll Rates, Status & Latest Updates (2026)

Last Updated: 3 November 2026
StatusFully Operational
Length66.916 km
Corridor StatusAll 1 Packages Open (100%)
CompletionOctober 2025
Last Updated3 November 2026

The Jaipur–Bandikui Greenfield Expressway (National Expressway 4C / NE-4C) is a 67 km 4-lane access-controlled greenfield expressway developed by NHAI. Acting as the dedicated Jaipur spur of the Delhi–Mumbai Expressway, it connects the DME interchange at Bandikui directly to Bagrana / Ring Road near Jaipur, reducing driving time between Delhi NCR and Jaipur to just 3.5 hours.

Project Summary

The ₹1,368-crore Jaipur–Bandikui Greenfield Expressway (NE-4C) is a 66.916 km four-lane access-controlled highway developed by NHAI under Bharatmala Pariyojana Phase-I via HAM. It connects the Delhi–Vadodara Greenfield Expressway near Bandikui with Bagrana near Jaipur at NH-21, providing direct connectivity to the Delhi–Mumbai Expressway corridor.

जयपुर बांदीकुई एक्सप्रेसवे (NE-4C)

जयपुर बांदीकुई एक्सप्रेसवे (NE-4C) दिल्ली-मुंबई एक्सप्रेसवे को सीधे जयपुर शहर से जोड़ने वाला 67 किमी लंबा 4-लेन का ग्रीनफील्ड एक्सप्रेसवे है।

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length66.916 km
Estimated Cost₹1,368 Crore
Implementing AgencyNHAI
Current StatusFully Operational
CompletionOctober 2025
Route Map

Jaipur–Bandikui Greenfield Expressway (NE-4C) Route Map & Alignment

View and download the latest Jaipur–Bandikui Greenfield Expressway (NE-4C) route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Jaipur–Bandikui Greenfield Expressway (NE-4C) Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameJaipur–Bandikui Greenfield Expressway (NE-4C)
Total Length66.916 km
Estimated Cost₹1,368 Crore
Current StatusFully Operational
* Note: Commercial operation commenced on 1 October 2025, formal inauguration held on 28 February 2026, and full Completion Certificate issued on 30 June 2026.
Project Parameters & Technical Details

Jaipur–Bandikui Greenfield Expressway (NE-4C)Cost • Route • Timeline

ParameterTechnical Details
lanes4 Lanes (expandable to 6)
modelHybrid Annuity Mode (HAM)
originShyamsinghpura (near Bandikui, Dausa district) — Junction with Delhi–Vadodara Expressway
statusOperational — Completion Certificate issued on 30 June 2026; commercial operation effective from 1 October 2025
programBharatmala Pariyojana Phase I
length_km66.916
structures[object Object]
destinationBagrana (Jaipur district) — Junction with NH-21 Agra Road & Jaipur Ring Road
Project NameJaipur–Bandikui Greenfield Expressway (NE-4C)
Total Length66.916 km
project_typeGreenfield Expressway Spur
configurationFour-lane access-controlled greenfield expressway spur
Current StatusFully Operational
Estimated Cost₹1,368 Crore
appointed_date11 November 2022
concessionaireGR Bandikui Jaipur Expressway Private Limited (G R Infraprojects Ltd.)
estimated_cost₹1,368 crore (Bid project cost, excluding GST)
Completion DateOctober 2025
completion_dateCompletion Certificate: 30 June 2026
Inauguration Date28 February 2026
Target CompletionOctober 2025
districts_coveredDausa,Jaipur
highway_designationNational Expressway 4C (NE-4C)
implementing_agencyNational Highways Authority of India (NHAI)
Implementing AuthorityNHAI
formal_inauguration_date28 February 2026 (by Prime Minister Narendra Modi)
commercial_operation_date1 October 2025 (declared in Completion Certificate)
Five physical fee plazas and one virtual fee plaza on NE-4C

NE-4C Toll Plazas, Locations & FASTag System

NE-4C uses an entry/exit-based tolling arrangement. The system has five physical fee plazas and one virtual fee plaza at Shyamsinghpura. Toll charges depend on the vehicle category and the distance travelled between the applicable entry and exit points. The Government's statutory fee notification specifies the fee-plaza chainages and distance matrix. Travellers should check the applicable FASTag charge for their actual journey before travelling. The Gazette also includes an important technical detail: the toll calculation accounts for equivalent road length for certain structures longer than 60 metres. Therefore, do not calculate a fare simply by subtracting two plaza chainages and applying a per-kilometre rate.

Fee Plazas on Corridor (NETC / NPCI Master)
6 Toll Facilities
No.Toll Plaza NamePlaza Code / ChainageInterchange Details & Connectivity
1Shyamsinghpurakm 1.200Virtual fee plaza handles tolling for the connection with the Delhi–Vadodara Expressway (NE-4 mainline). Coordinates electronic FASTag tracking without physical barrier queues.
2Bedoli Fee Plazakm 13.282Physical fee plaza with grade-separated entry/exit connecting local and regional arterial routes in Dausa district.
3Kuri Khurd Fee Plazakm 26.482Physical fee plaza serving the central Dausa agricultural and logistics belt.
4Sundarpura Fee Plazakm 39.953Physical fee plaza serving eastern Jaipur district and Jamwaramgarh.
5Gella Ki Nangal Fee Plazakm 60.839Physical fee plaza serving Bassi and the eastern outer periphery of Jaipur.
6Bagrana Fee Plazakm 66.448Physical fee plaza at the western terminus of NE-4C connecting with NH-21 near Bagrana. Expressway ends at km 66.916.
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→
Order of Tolling Locations from Bandikui / Delhi–Vadodara Expressway End towards Jaipur

Designated Toll Plazas and Access Interchanges along NE-4C

The official fee-plaza register and project alignment identify six tolling locations ordered from km 1.200 near Bandikui to km 66.448 at Jaipur:

  • Shyamsinghpura (km 1.200): Virtual Fee Plaza & direct trumpet interchange connection to Delhi–Vadodara Expressway (NE-4 mainline) in Dausa district
  • Bedoli (km 13.282): Physical Fee Plaza with grade-separated entry/exit connecting local arterial routes in Dausa district
  • Kuri Khurd (km 26.482): Physical Fee Plaza with grade-separated entry/exit serving Senthal Road and central Dausa logistics belt
  • Sundarpura (km 39.953): Physical Fee Plaza with grade-separated entry/exit serving Jamwaramgarh Road and eastern Jaipur district
  • Gella Ki Nangal (km 60.839): Physical Fee Plaza with grade-separated entry/exit serving Bassi and the eastern outer region of Jaipur
  • Bagrana (km 66.448): Physical Fee Plaza & terminal access point connecting NH-21 (Agra Road) and the Jaipur Ring Road
Corridor Geography & Route Nodes

Districts & Major Locations Along the Expressway

The 66.916 km Jaipur–Bandikui Greenfield Expressway passes through two districts in Rajasthan:

Dausa District — 32.750 km
Chainage km 0.000 to km 32.750
  • Shyamsinghpura: Virtual fee-plaza location at km 1.200
  • Bedoli: Physical fee plaza at km 13.282
  • Kuri Khurd: Physical fee plaza at km 26.482
Jaipur District — 34.166 km
Chainage km 32.750 to km 66.916
  • Sundarpura: Physical fee plaza at km 39.953
  • Gella Ki Nangal: Physical fee plaza at km 60.839
  • Bagrana: Physical fee plaza at km 66.448 (expressway terminates at km 66.916 near NH-21)

The district-wise lengths are published by the project concessionaire. The fee-plaza locations and chainages are specified in the Government of India's statutory notification.

Corridor Trajectory

Route Alignment & Corridor Trajectory

The western end connects to the Delhi–Vadodara Greenfield Expressway near Bandikui, while the eastern end terminates near Bagrana at NH-21 in Jaipur district. The project forms part of Bharatmala Pariyojana Phase-I and was implemented as a single HAM concession project.

Travel Advisory

Travel Advisory & Corridor Connectivity

The Jaipur–Bandikui Expressway provides access-controlled connectivity between Jaipur and the Delhi–Vadodara Greenfield Expressway near Bandikui. It gives Jaipur-bound and Delhi-bound travellers an alternative connection to the wider Delhi–Mumbai Expressway corridor. The applicable toll depends on the entry and exit points and vehicle category. Actual journey time varies with traffic, weather, toll processing and conditions on connecting highways.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Jaipur–Bandikui Greenfield Expressway (NE-4C), also known as the Bandikui–Jaipur spur, is a 66.916 km, four-lane, access-controlled greenfield expressway in Rajasthan. It connects the Delhi–Vadodara Greenfield Expressway near Bandikui with Bagrana near Jaipur.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Rajasthan Dashboard →RJ
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement