Verified PartnerDelhi–Gurgaon Expressway Route Map, Toll Rates, Status & Latest Updates (2026)
The Delhi–Gurgaon Expressway is a vital 27.7 km 8-to-10 lane access-controlled arterial highway on NH-48 connecting Dhaula Kuan in Delhi to Kherki Daula in Gurugram, Haryana. Serving as the primary vehicular spine connecting the Indira Gandhi International (IGI) Airport, DLF Cyber City, and Manesar industrial hub, it carries over 250,000 vehicles daily.
Developed as an 8/6-lane access-controlled corridor between Dhaula Kuan in Delhi and the 42nd Milestone in Gurugram, the expressway separates high-speed regional traffic from local urban movement via dedicated service roads and grade-separated interchanges. Following the end of its original BOT–Toll concession and the earlier removal of the Sirhaul border plaza in 2014, Kherki Daula operates as the sole NHAI public-funded fee plaza on the corridor.
दिल्ली गुड़गांव एक्सप्रेसवे (Delhi Gurgaon Expressway)
दिल्ली गुड़गांव एक्सप्रेसवे (NH-48) दिल्ली के धौला कुआं से गुरुग्राम के खेड़की दौला तक 27.7 किमी लंबा भारत का सर्वाधिक व्यस्त 8-10 लेन का एक्सप्रेसवे है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Delhi–Gurgaon Expressway Route Map & Alignment
View and download the latest Delhi–Gurgaon Expressway route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerDelhi–Gurgaon ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Highway | NH-48 (formerly NH-8) |
| Project Cost | Original Concession Agreement Cost: ₹555 crore | Sanctioned Change of Scope: ₹155.25 crore | Revised Concession Agreement Value: ₹710.25 crore |
| Project Name | Delhi–Gurgaon Expressway |
| Total Length | 27.7 km |
| Configuration | 8/6-lane access-controlled highway |
| Current Status | Fully Operational |
| Estimated Cost | ₹710.25 Crore |
| Project Status | Fully Operational |
| Completion Date | January 2008 |
| Concession Model | Build-Operate-Transfer (BOT – Toll) [Original development model; concession concluded 1 March 2023] |
| Opened to Traffic | 23 January 2008 (Corridor civil works reported ready 31 December 2007; final grade-separated flyovers commissioned 23 January 2008) |
| Target Completion | January 2008 |
| Sirhaul Plaza Status | 19 February 2014 – Sirhaul Toll Plaza: Toll collection ceased in February 2014, following a court-backed settlement. The physical plaza structure was subsequently subject to dismantling. |
| Concessionaire History | Original BOT Concessionaire: Delhi-Gurgaon Super Connectivity Ltd (DGSCL). Handed over in 2014 to Millennium City Expressways Pvt Ltd (MCEPL). Concession concluded on 1 March 2023 when toll plaza operations were transferred to NHAI as a public-funded fee plaza. |
| Current Highway Status | Fully Operational |
| Implementing Authority | NHAI |
| Proposed Plaza Relocation | NHAI has initiated the tendering process for a proposed Multi-Lane Free Flow (MLFF) tolling facility at Kukrola (also reported as Kukdola) near Pachgaon on NH-48. The proposed facility remains in the tendering and bidding process; Kherki Daula Toll Plaza remains fully operational until the replacement facility is formally commissioned. |
| Sanctioned change of scope | ₹155.25 crore |
| Current Toll Administration | National Highways Authority of India (NHAI) Public-Funded Fee Plaza (since 1 March 2023) |
| Reported Overall Project Cost | ₹1,175 crore (Reported total cost cited in CIRC regulatory study) |
| Toll Plaza Location & Chainage | 42nd Milestone (Kherki Daula), NH-48, Gurugram — Chainage Km 690.600 |
| Concession Agreement project cost | ₹555 crore (Original 2002 concession agreement) |
| Revised Concession Agreement Value | ₹710.25 crore |
| Toll Calculation Distance (Gazette) | Physical corridor length is 27.7 km. Notified statutory toll calculation distance under MoRTH Gazette is 65.905 km (23.455 km normal road + 4.245 km qualifying structures with a 10x equivalence factor = 42.45 equivalent km). The 42.45 km figure on portals reflects this structure-equivalent component, not the physical expressway length. |
| Combined project cost under concession heads | ₹710.25 crore (Ministry parliamentary response, March 2012) |
| Concessionaire completion cost (31 March 2008) | ₹1,170.26 crore |
| Concessionaire completion cost (31 March 2011) | ₹1,405.97 crore |
Kherki Daula Toll Plaza Rates – FY 2026–27
Kherki Daula is the existing NHAI fee plaza listed for the relevant section of NH-48. The former Sirhaul toll collection point ceased operations in February 2014.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | 42nd Milestone / Kherki Daula (Southern Terminus & Fee Plaza) | Plaza 1 | Southern terminus of the 27.7 km expressway section and location of the active NHAI public-funded fee plaza at NH-48 Chainage Km 690.600. Public tariff listings display a 42.45 km structure-equivalent tollable length (within a 65.905 km combined Gazette calculation distance). Process initiated for barrier-less MLFF relocation to Kukrola (Kukdola) near Pachgaon; Kherki Daula remains operational until replacement commissioning. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Major Junctions, Access Points & Road Connections Along the Delhi–Gurgaon Expressway
The Delhi–Gurgaon Expressway connects several important transport, commercial and urban locations along NH-48. Major junctions, access points and road connections include:
- Dhaula Kuan (Northern End): Northern terminus of the corridor in Delhi connecting with Dhaula Kuan, Rao Tula Ram Marg, Ring Road, and inner central Delhi corridors.
- Subroto Park (Delhi Cantonment): Access point near Air Force Station and Delhi Cantonment; features dedicated pedestrian Foot Overbridge (FOB) facilities and past carriageway widening works.
- Mahipalpur (Airport Approach): Strategic grade-separated junction connecting vehicular traffic to Indira Gandhi International Airport (Terminal 1 & Terminal 3 approach routes) and Mahipalpur bypass.
- Sirhaul (Delhi–Haryana Border): Historic toll collection location at the Delhi–Gurugram border. Toll collection ceased at midnight on 19 February 2014, and the 32-lane plaza was dismantled in 2014–2015, establishing a permanently toll-free border crossing.
- Shankar Chowk (Cyber City Access): High-density junction serving DLF Cyber City and Udyog Vihar. Following in-principle approvals from NHAI and GMDA in October 2026, DLF awarded a ₹325 crore construction contract in November 2026 for an 18-month decongestion package comprising a 3-lane flyover from Ambience Mall to DLF Cyber City and four vehicular underpasses (including a primary underpass from Moulsari Avenue beneath NH-48 toward Delhi).
- IFFCO Chowk (Major Junction): Major junction featuring grade-separated underpasses and multi-lane flyovers connecting NH-48 with Mehrauli–Gurgaon Road (MG Road) and eastern Gurugram sectors.
- Signature Tower (Arterial Junction): Arterial grade-separated intersection featuring a vehicular underpass linking NH-48 with Old Railway Road, Sector 29, and connecting routes toward HUDA City Centre (Millennium City Centre).
- Rajiv Chowk (Major Interchange): Primary junction featuring vehicular underpasses, connecting NH-48 directly to Sohna Road (NH-248A), Medanta Hospital, and Old Gurugram arterial roads.
- Hero Honda Chowk (Flyover & Underpass): Major grade-separated junction complex featuring an 8-lane flyover and bidirectional underpass connecting industrial estates, Basai Road, and New Gurugram sectors.
- CPR–NH-48–SPR Junction (Dwarka Expressway Connection): Located approximately 1.5–2 km north of the Kherki Daula toll plaza. This major interchange connects the Central Peripheral Road (CPR), Southern Peripheral Road (SPR), and the Dwarka Expressway (NH-248BB) with NH-48. Note: This serves as the Dwarka Expressway network connector via CPR/SPR, distinct from the toll plaza itself.
- 42nd Milestone / Kherki Daula (Southern Terminus & Fee Plaza): Southern terminus of the 27.7 km expressway section and location of the active NHAI public-funded fee plaza at NH-48 Chainage Km 690.600. Public tariff listings display a 42.45 km structure-equivalent tollable length (within a 65.905 km combined Gazette calculation distance). Process initiated for barrier-less MLFF relocation to Kukrola (Kukdola) near Pachgaon; Kherki Daula remains operational until replacement commissioning.
Delhi–Gurgaon Expressway Route Alignment
The 27.7 km Delhi–Gurgaon Expressway spans NH-48 between Dhaula Kuan in Delhi and the 42nd Milestone (Kherki Daula) in Gurugram, Haryana. The corridor serves vital transit points including Delhi Cantonment, Mahipalpur (IGI Airport approach), DLF Cyber City, IFFCO Chowk, Rajiv Chowk, and Hero Honda Chowk before reaching the CPR–SPR Dwarka Expressway interchange and terminating at the Kherki Daula toll plaza (Chainage Km 690.600). Tariff listings at Kherki Daula cite a 42.45 km structure-equivalent tollable length (forming part of a 65.905 km combined Gazette toll calculation distance across the 27.7 km physical corridor).
Traffic Conditions and Travel Guidance
The Delhi–Gurgaon Expressway is a vital arterial commuter corridor along NH-48. Indicative travel time under relatively light traffic conditions is 25–35 minutes. Actual journey time varies depending on congestion, weather, roadworks and traffic restrictions. Peak-hour congestion at nodes like Sirhaul, Shankar Chowk, and Rajiv Chowk can significantly increase travel times. Motorists are advised to check real-time traffic updates before travelling.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The physical length of the Delhi–Gurgaon Expressway is approximately 27.7 km (23.455 km of normal highway plus 4.245 km of qualifying structures). This physical length should not be confused with the 42.45 km structure-equivalent length shown on public tariff listings or the 65.905 km combined toll calculation distance under the Gazette notification.
The published FY 2026–27 tariff listing shows a single-journey toll of ₹105 for cars, jeeps and vans; ₹165 for light commercial vehicles; ₹345 for buses and trucks; ₹380 for vehicles up to 3 axles; ₹545 for 4–6 axle vehicles and HCM/EME; and ₹665 for vehicles with 7 or more axles. The listed car return fare is ₹155. These rates are reported as effective from 19 July 2026, with the next revision scheduled for 31 March 2027. Check the applicable NHAI notification or plaza information before travelling.
The relocation has been initiated but should not be described as completed. NHAI has started the process of shifting the existing Kherki Daula toll plaza to a new location near Kukdola, towards Pachgaon. A tender has also been floated for a Multi-Lane Free Flow (MLFF) tolling system at the proposed site. Kherki Daula should be treated as the existing toll location until NHAI confirms that the replacement plaza is operational.
Toll collection at the Sirhaul toll plaza on the Delhi–Gurugram border ended at midnight on 19 February 2014. toll collection ceased in February 2014, following a court-backed settlement. The physical plaza structure was subsequently subject to dismantling. The removal ended toll collection at this former Delhi–Gurugram border location.
The original concession agreement value was ₹555 crore, with an additional ₹155.25 crore sanctioned for change of scope, taking the revised agreement value to ₹710.25 crore. The Ministry of Road Transport and Highways separately reported concessionaire completion costs of ₹1,170.26 crore up to 31 March 2008 and ₹1,405.97 crore up to 31 March 2011. These figures represent different financial reporting measures and should not be treated as interchangeable project costs.
The 27.7 km Delhi–Gurgaon Expressway begins at Dhaula Kuan in Delhi and extends south along NH-48 to the 42nd Milestone at Kherki Daula in Gurugram, Haryana. It connects Delhi's airport approach roads and major Gurugram junctions with the onward NH-48 corridor towards Jaipur.
Major junctions and access points along the Delhi–Gurgaon Expressway include Dhaula Kuan, Subroto Park, Mahipalpur, the former Sirhaul toll location, Shankar Chowk, IFFCO Chowk, Signature Tower, Rajiv Chowk, Hero Honda Chowk, the CPR–SPR connection and Kherki Daula. These junctions provide access to Delhi Cantonment, IGI Airport, DLF Cyber City, central Gurugram and connecting highways.
The physical length of the Delhi–Gurgaon Expressway is 27.7 km between Dhaula Kuan and Kherki Daula. The statutory toll calculation distance under the MoRTH Gazette notification is 65.905 km, consisting of 23.455 km of normal highway plus 4.245 km of qualifying long structures multiplied by a statutory factor of 10 (42.45 equivalent km). The 42.45 km often cited on public portals is this structure-equivalent component, not the physical length of the corridor.
From 1 November 2026, eligible non-commercial private vehicle owners residing within 20 km of qualifying National Highway toll plazas can choose a concessional annual Local Pass. The annual fee is ₹3,000 for plazas within municipal or local town limits and ₹1,500 for plazas outside these limits. Kherki Daula has been reported as falling within municipal limits, making the ₹3,000 category applicable. Applicants must have a valid, functional FASTag and meet the formal residence and vehicle verification requirements; nearby residence alone does not confer automatic entitlement. The pass applies exclusively to the designated eligible plaza.
The FASTag Annual Pass and the concessional local annual pass are two different schemes. The regular FASTag Annual Pass for FY 2026–27 costs ₹3,075 and provides eligible non-commercial cars, jeeps and vans with up to 200 National Highway and National Expressway toll crossings or one year of validity, whichever comes first. The separate ₹3,000 Kherki Daula local pass is intended for eligible residents living within 20 km of the plaza. Check the NHAI Rajmargyatra portal for the applicable scheme and eligibility.
The Delhi–Gurgaon Expressway carries National Highway 48 (NH-48) through the Delhi–Gurugram corridor. NH-48 is a major national highway route connecting Delhi with Gurugram, Jaipur and destinations farther south and west. The expressway is the access-controlled section developed to improve traffic movement along this important route.
The Delhi–Gurgaon Expressway was developed as an access-controlled 8/6-lane highway. The original project specifications included widening 22.33 km to eight lanes and the remaining 5.37 km to six lanes, along with flyovers and grade-separated junctions to improve traffic flow.
Yes. The Delhi–Gurgaon Expressway provides connectivity to Indira Gandhi International Airport through the Mahipalpur and airport approach-road junctions. The project was designed with signal-free access arrangements for the airport's domestic and international terminals, improving road connectivity between Gurugram, Delhi and the airport.
DLF awarded a ₹325 crore contract on 4 November 2026 for the construction of one flyover and four underpasses near Ambience Mall, Moulsari Avenue and Shankar Chowk in Gurugram. Ground construction remains pending approval of the comprehensive traffic-management plan by the authorities. The project is intended to reduce congestion around the Delhi–Gurgaon Expressway and Cyber City.
The journey time depends on the starting point, destination, traffic conditions and time of day. Under relatively light traffic, the Delhi–Gurgaon Expressway may take approximately 25–35 minutes to cover, but congestion around Sirhaul, Shankar Chowk, IFFCO Chowk and Rajiv Chowk can increase travel time considerably. Check live traffic conditions before starting your journey.
Related Infrastructure Projects
Delhi–Faridabad Expressway (DND–KMP)
A 59.063 km 6-lane access-controlled highway (NH-148NA) connecting DND Flyway, Faridabad, and KMP. Packages 2 & 3 operational; Delhi Package 1 under carriageway trial operations.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Delhi–Panipat Expressway (NH-44)
An approximately 70.7 km eight-lane highway upgrade on NH-44 connecting Mukarba Chowk to Panipat, connecting with the separate 10 km six-lane Panipat Elevated Highway.