The Yamuna Expressway (originally known as the Taj Expressway or Yamuna Express Highway) is a 165.537 km, 6-lane (expandable to 8) access-controlled rigid concrete highway in Uttar Pradesh connecting Zero Point / Pari Chowk in Greater Noida to Kuberpur (NH-19) in Agra. Built at an outlay of ₹12,839 Crore on a 36-year BOT toll concession by Jaypee Infratech Ltd (now managed by Suraksha Group under NCLAT resolution) under YEIDA oversight, it opened on 9 August 2012 and serves as the primary expressway spine for Noida International Airport (Jewar) and YEIDA urban sectors.

Inaugurated on 9 August 2012 at an investment of ₹12,839 Crore, the 165.537 km Yamuna Expressway (Taj Expressway) connects Greater Noida with Agra across Gautam Buddha Nagar, Aligarh, Mathura, Hathras, and Agra districts. Operated under YEIDA and managed by Suraksha Group (JIL), the corridor features three mainline FASTag toll plazas (Jewar Toll Plaza at Km 38.3, Mathura Toll Plaza at Km 94.9, and Agra Toll Plaza at Km 150.1) with updated 2024–2026 toll rates (₹2.95/km for cars, ~₹485 full journey). The corridor integrates direct interchanges to Noida International Airport (Jewar), the Delhi–Mumbai Expressway spur, and upcoming Film City and YEIDA urban sectors.

News & Project Summary

“Commissioned on 9 August 2012 at an investment of ₹12,839 Crore, the 165.537 km six-lane Yamuna Expressway connects Greater Noida with Agra across Gautam Buddha Nagar, Aligarh, Mathura, Hathras, and Agra districts, feeding seamlessly into the Noida–Greater Noida Expressway at the northern terminal and the Agra Inner Ring Road / Agra–Lucknow Expressway at Kuberpur. Enforced with CCTV cameras every 5 km, mobile radar speed monitoring, and three main FASTag toll plazas (Jewar at ~Km 38, Mathura at ~Km 95, and Agra at ~Km 150), the corridor has also implemented IIT Delhi safety recommendations (2025) and is gaining major interchange links to Noida International Airport (Jewar) and the Delhi–Mumbai Expressway spur.”

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length165.5 km
Estimated Cost₹12,839 Crore
Implementing AgencyYEIDA / Jaypee Infratech
Current StatusFully Operational
CompletionAugust 2012
Route Map

Route Map & Alignment (Greater Noida to Kuberpur, Agra)

Interactive GIS alignment of the 165.537 km Yamuna Expressway showing dual southbound/northbound carriageways from Zero Point / Pari Chowk (Greater Noida) past Jewar Airport, Tappal (NH-334D), Mathura–Raya (NH-530B), and Khandauli (NH-509) to Kuberpur (NH-19, Agra).

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project Name📍 Yamuna Expressway (Taj Expressway)
Total Length165.537 km (6 Lanes)
Total Cost₹12,839 Crore
Toll CollectionFASTag (3 Main Plazas)
Active Operational Plazas & User Fee Breakdown · Yamuna Expressway (Taj Expressway)

Yamuna Expressway Active Toll Plazas & Rates

165.5 km Greater Noida to Agra Access-Controlled Corridor (YEIDA Revised Tariff)

Revised Oct 2024 · YEIDA Gazetted
Corridor ClassificationClosed-Loop FASTagListed in National Toll Directory · State: Uttar Pradesh
Active Mainline Plazas3 Main PlazasJewar (Km 38) · Mathura (Km 95) · Agra (Km 150)
Full Stretch Car Toll₹485Greater Noida to Agra (₹2.95 / km base rate)
24-Hr Return Concession₹780 (Round Trip)~1.6x single-trip tariff for return within 24 hours
Tolling System & Operational Audit

The Yamuna Expressway operates a closed-loop electronic FASTag distance-based tolling system across 3 mainline toll plazas: Jewar (Km 38), Mathura (Km 95), and Agra (Km 150). Commuters pay only for the exact distance traveled between their entry and exit points. YEIDA revised vehicle tariffs effective October 1, 2024, setting the passenger car rate at ₹2.95 per km (₹485 for the complete 165.5 km stretch). Under MoRTH / YEIDA guidelines, non-FASTag entries or invalid RFID tags incur a mandatory 200% penalty in cash.

Active Fee Plazas & Locations (North to South)

3 Mainline Plazas · 165.5 km
No.Fee Plaza / FacilityChainage / LocationDistrict / StateClassificationRole & Corridor Scope
1Jewar Toll PlazaKm 38 (Jewar, Gautam Buddha Nagar)Uttar PradeshMainline Toll PlazaPrimary northern entry/exit facility serving Greater Noida, Jewar International Airport (Noida Airport), and Western UP.
2Mathura Toll PlazaKm 95 (Mathura District)Uttar PradeshMainline Toll PlazaCentral mainline barrier providing high-volume access to Mathura, Vrindavan, Govardhan, and Bharatpur.
3Agra Toll PlazaKm 150 (Agra District)Uttar PradeshMainline Toll PlazaSouthern terminal barrier connecting into Agra Inner Ring Road, NH-19, and the Agra-Lucknow Expressway.
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→
Urban & Industrial Master Plan

YEIDA Sectors, Plot Schemes & Growth Hubs Along Yamuna Expressway

The Yamuna Expressway Industrial Development Authority (YEIDA) manages over 2.68 lakh hectares of notified land across Gautam Buddha Nagar, Bulandshahr, Aligarh, Hathras, Mathura, and Agra. The initial 40 km corridor from Zero Point to Jewar Airport forms northern India's fastest-growing industrial, institutional, and residential hub.

Sector 18 & Sector 20

Km 12 – 16
Residential Plot Schemes

Largest residential sectors under YEIDA schemes with plot sizes ranging from 120 sq. m. to 4,000 sq. m., located adjacent to Eastern Peripheral Expressway interchange.

Sector 21

Km 21 – 24
International Film City

1,000-acre greenfield Noida Film City developed under PPP mode by Bayview Projects (Boney Kapoor) with direct access from Yamuna Expressway.

Sector 22D

Km 20 – 23
Group Housing & Townships

Hub for multi-storey residential complexes, affordable housing schemes, builder pockets (ATS Allure, Supertech Upcountry, Oasis Grandstand), and commercial gallerias.

Sector 28

Km 27 – 29
Medical Device Park

North India's flagship dedicated Medical Device Park (350 acres) incentivized under the central MedTech scheme with dedicated power and effluent treatment.

Sector 29, 32 & 33

Km 28 – 35
Industrial, MSME & Toy Park

Core manufacturing cluster hosting National Toy Park, Apparel Park, electronics fabrication, and logistics hubs linked directly to Jewar cargo terminals.

Noida International Airport Hub

Km 32 – 38
Jewar Aerotropolis

Dedicated multi-modal cloverleaf interchange linking the expressway to Jewar Airport passenger terminal and the 31.4 km Delhi–Mumbai Expressway spur.

Yamuna Expressway Distance & Estimated Driving Time (from Zero Point Greater Noida)
Buddh Circuit / Sec 22D15 km • ~12 min
Jewar Airport / Plaza38 km • ~25 min
Mathura / Vrindavan110 km • ~70 min
Agra (Kuberpur NH-19)165.5 km • ~105 min
Project Parameters & Technical Details

Technical Specifications & Engineering Parameters

ParameterVerified Details
Official / Alternate NameYamuna Expressway (Taj Expressway)
Corridor Length165.537 km (Expandable 6 to 8 Lanes)
Project Outlay & Model₹12,839 Crore Outlay • 36-Year BOT Toll Concession
Implementing AuthorityYEIDA / Jaypee Infratech (Suraksha Group)
Concessionaire / OperatorJaypee Infratech Limited (JIL) — managed by Suraksha Group
Lane Configuration6-Lane Divided Rigid Concrete (Expandable to 8 Lanes • 100 m RoW)
Key Structures & Facilities3 Main Toll Plazas (Jewar, Mathura, Agra) + 168 km Service Roads & IAF Emergency Airstrip
Origin & TerminusZero Point / Pari Chowk (Greater Noida) ➔ Kuberpur NH-19 (Agra)
Toll & Speed Governance100 km/h (LMV) • Section-Based FASTag Toll (₹2.95/km)
Commissioning HistoryAgreement: Feb 2003 • Opened: 9 August 2012 • Concession: 36 Years (2048)

Engineering, Insolvency Resolution & Jewar Aerotropolis Integration

Conceived in April 2001 under the Taj Expressway Authority (now YEIDA) and executed under a February 2003 36-year Build-Operate-Transfer (BOT) concession by Jaypee Infratech Limited (JIL), the Yamuna Expressway was constructed with 168 km of parallel service roads, CCTV coverage every 5 km, SOS boxes, and highway patrols every 25 km. On 21 May 2015, the stretch near Raya in Mathura became the first highway in India to host an Indian Air Force Mirage 2000 emergency landing drill.

Under NCLAT's May 2024 insolvency resolution order and ongoing Supreme Court monitoring, the Suraksha Group assumed control of Jaypee Infratech alongside obligations toward the ₹1,334 Crore enhanced farmer compensation payout to YEIDA. Meanwhile, YEIDA implemented IIT Delhi's road-safety audit measures in 2025 while connecting the corridor directly to Noida International Airport (Jewar), the Eastern Peripheral Expressway, the Delhi–Mumbai Expressway spur, and the Agra Inner Ring Road toward the Agra–Lucknow Expressway.

Major Toll Plazas, Interchanges & Districts Served:
📍 Zero Point / Pari Chowk (Greater Noida) [Km 0.0]Northern terminus seamlessly extending the 24.53 km Noida–Greater Noida Expressway
📍 Buddh International Circuit / Dankaur Interchange [Km 10.2]Grade-separated interchange serving Gautam Buddh University and YEIDA Sports Sectors
📍 Jewar / Noida International Airport Interchange [Km 32.0]Dedicated aerotropolis & greenfield expressway interchange serving Jewar Airport
📍 Jewar Mainline Toll Plaza [Km 38.3]First section-based FASTag plaza (standard LMV/car one-way plaza toll ₹120)
📍 Tappal / Bajna Interchange (NH-334D) [Km 67.3]Midway patrol hub connecting Tappal, Khair, Aligarh, and Palwal via NH-334D
📍 Mathura Mainline Toll Plaza (Mant / Surir) [Km 94.9]Second mainline FASTag toll checkpoint near Mant in Mathura district
📍 Mathura / Raya–Vrindavan Interchange (NH-530B) [Km 110.0]Links Mathura–Vrindavan & Bareilly highway; adjacent to IAF Mirage 2000 landing strip
📍 Khandauli / Baldeo Interchange (NH-509) [Km 140.6]Connects Hathras (Sadabad), Baldeo, and Khandauli toward NH-509
📍 Agra Mainline Toll Plaza & Kuberpur Terminal (NH-19) [Km 150.1 – 165.5]Third toll plaza followed by Kuberpur NH-19 junction & Agra Inner Ring Road toward Agra–Lucknow Expressway

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments & News Timeline

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
Project Schedule

Development Phases & Corridor Upgrades

Operational phases and active connectivity additions
Phase I: Greater Noida (Zero Point) to Jewar / Airport HubFully Operational

6-lane rigid concrete mainline passing Pari Chowk, Buddh International Circuit, Rabupura, Noida International Airport interchange, and Jewar Toll Plaza (~Km 38).

Progress100%
Agency: Jaypee Infratech Limited (YEIDA BOT Concession)Status: Opened 9 Aug 2012
Phase II: Jewar to Intermediate Stretch (Tappal / Bajna / Mathura)Fully Operational

Connects NH-334DD and NH-334D at Tappal / Bajna down to the Mathura Toll Plaza (~Km 95) and highway patrol station.

Progress100%
Agency: Jaypee Infratech Limited (YEIDA BOT Concession)Status: Opened 9 Aug 2012
Phase III: Mathura (Raya / Vrindavan) to Kuberpur (Agra)Fully Operational

Serves Raya–Vrindavan (NH-530B), the IAF emergency landing stretch, Khandauli (NH-509), Agra Toll Plaza (~Km 150), and Kuberpur NH-19 interchange.

Progress100%
Agency: Jaypee Infratech Limited (YEIDA BOT Concession)Status: Opened 9 Aug 2012
Safety & Connectivity Upgrades (IIT Delhi Audit & Airport / Ring Road Links)Operational / Ongoing

IIT Delhi road-safety recommendations implemented in 2025 alongside direct Jewar Airport interchanges, EPE link connectivity, and Delhi–Mumbai Expressway spur integration.

Progress85%
Agency: YEIDA / Suraksha Group JIL Management / NHAI Link ContractorsStatus: Safety Measures 2025 • Airport & DND–KMP Spurs

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Yamuna Expressway (formerly Taj Expressway / Yamuna Express Highway) spans 165.537 km. It originates at Zero Point / Pari Chowk in Greater Noida (connecting from the Noida–Greater Noida Expressway) and terminates at Kuberpur on NH-19 in Agra, passing through 5 districts: Gautam Buddha Nagar, Aligarh, Mathura, Hathras, and Agra.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement