Advertisement // Sponsor
Verified PartnerPurvanchal Expressway Route Map, Toll Rates, Status & Latest Updates (2026)
The Purvanchal Expressway (also searched as the Lucknow Ghazipur Expressway) is a 340.824 km, six-lane access-controlled greenfield expressway developed and operated by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA).
Officially inaugurated and opened to public traffic in November 2021, the expressway originates at Chand Sarai village on the Lucknow-Sultanpur Road (NH-731) and terminates at Haidaria village on NH-31 in Ghazipur district near the Bihar border. Traversal time across eastern Uttar Pradesh has dropped from 7–8 hours to under 4 hours.
The Purvanchal Expressway is set for substantial network expansion, with the UP Cabinet recently approving a 117 km Vindhya-Purvanchal Link and an Agra-Lucknow-Purvanchal connection as part of a broader Rs 47,000 crore investment in new expressways. These strategic additions significantly enhance the operational corridor's regional connectivity, solidifying its role as a critical infrastructure backbone in Uttar Pradesh.
पूर्वांचल एक्सप्रेसवे (Purvanchal Expressway)
पूर्वांचल एक्सप्रेसवे उत्तर प्रदेश में 340.8 किमी लंबा 6-लेन ग्रीनफील्ड एक्सप्रेसवे है जो लखनऊ को गाजीपुर से जोड़ता है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Purvanchal Expressway Interactive Route Map & Alignment
Explore the official 340.8 km Purvanchal Expressway corridor from Chand Sarai (Lucknow) to Haidaria (Ghazipur), featuring interchange exits, major river bridges, and 9 traversed districts.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerPurvanchal ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Lanes | 6 Lanes (Expandable to 8 Lanes) |
| Design Speed | 120 km/h |
| Project Name | Purvanchal Expressway (Lucknow–Ghazipur Expressway) |
| Total Length | 340.824 km |
| East Terminal | Haidaria, Ghazipur (NH-31, near Bihar Border) |
| West Terminal | Chand Sarai, Lucknow (NH-731) |
| Current Status | Fully Operational |
| Estimated Cost | ~₹22,496 Crore |
| Total Packages | 8 Civil Construction Packages (All Completed) |
| Inauguration Date | 16 November 2021 |
| Target Completion | Completed (Inaugurated Nov 2021) |
| Emergency Airstrip | 3.2 km IAF Emergency Landing Strip at Kurebhar (Sultanpur) |
| Implementing Agency | UPEIDA |
| Implementing Authority | UPEIDA |
Purvanchal Expressway Toll Rates & 13-Plaza Matrix
Because the 340.8 km Purvanchal Expressway operates a closed-loop tolling system across 13 entry/exit plazas from Chand Sarai (Lucknow) to Haidaria (Ghazipur), drivers are billed strictly for the distance travelled between entry and exit stations (~₹1.98 to ₹2.15 per km for Cars, Jeeps, and LMVs).
Purvanchal Expressway tracks your exact entry and exit stations across 13 toll plazas. Entry 1 (Chand Sarai, Lucknow) spans ₹75 (Haidergarh) to ₹700 (Haidaria) one-way (₹150–₹1,400 round-trip in 24h), while Entries 2–5 scale ₹45–₹625, Entries 6–9 scale ₹35–₹560, and Entries 10–13 scale ₹40–₹700.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Chand Sarai Toll Plaza | Entry 1 · Lucknow Start | Western terminus entry/exit plaza in Lucknow (full route to Haidaria: ₹700 one-way / ₹1,400 24h round-trip) |
| 2 | Haidergarh Toll Plaza | Entry 2 · Barabanki | Barabanki sector interchange plaza (₹75 from Chand Sarai; Entries 2–5 span ₹45–₹625) |
| 3 | Inhauna / Rudauli Toll Plaza | Entry 3 · Amethi / Ayodhya | Interchange serving Inhauna & Rudauli belt (₹120 from Chand Sarai) |
| 4 | Jagdishpur / Kurebhar Toll Plaza | Entry 4 · Amethi | Jagdishpur & Kurebhar interchange plaza (₹170 from Chand Sarai) |
| 5 | Sultanpur (North) Toll Plaza | Entry 5 · Sultanpur | Northern Sultanpur interchange plaza (₹250 from Chand Sarai) |
| 6 | Sultanpur (East) Toll Plaza | Entry 6 · Sultanpur | Eastern Sultanpur interchange plaza (₹285 from Chand Sarai; Entries 6–9 span ₹35–₹560) |
| 7 | Dostpur Toll Plaza | Entry 7 · Sultanpur | Dostpur interchange plaza (₹330 from Chand Sarai) |
| 8 | Akbarpur / Katrighat Toll Plaza | Entry 8 · Ambedkar Nagar | Akbarpur / Katrighat interchange plaza (₹375 from Chand Sarai) |
| 9 | Ahiraula Toll Plaza | Entry 9 · Azamgarh West | Ahiraula interchange plaza serving western Azamgarh (₹420 from Chand Sarai) |
| 10 | Azamgarh (Main) Toll Plaza | Entry 10 · Azamgarh | Main Azamgarh interchange near Gorakhpur Link junction (₹485 from Chand Sarai; Entries 10–13 span ₹40–₹700) |
| 11 | Mau Toll Plaza | Entry 11 · Mau | Mau district interchange plaza (₹525 from Chand Sarai) |
| 12 | Ghazipur (West) Toll Plaza | Entry 12 · Ghazipur | Western Ghazipur interchange plaza (₹605 from Chand Sarai) |
| 13 | Haidaria Toll Plaza | Entry 13 · Ghazipur End | Eastern terminus plaza near UP–Bihar border (₹700 one-way / ₹1,400 round-trip back to Chand Sarai) |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Closed-Loop Matrix Note: Per-km car tariffs fall between ₹1.98 and ₹2.15 per km (averaging ~₹2.05/km for ₹700 over 340.8 km). 24-hour round-trip car fares shown from Chand Sarai equal 2× the single-journey fare (₹150 to ₹1,400).
Tariff Benchmark: Light motor vehicles (Car/Jeep/LMV) pay ~₹1.98–₹2.15 per km across the 13 closed-loop plazas (Chand Sarai Entry 1 through Haidaria Entry 13), with ₹700 one-way / ₹1,400 round-trip end-to-end.
Purvanchal Expressway Exit List
Major grade-separated interchanges and spur connections along the 340.8 km Lucknow–Ghazipur corridor.
- Lucknow Entry / Origin: Chand Sarai on NH-731 (Lucknow–Sultanpur Road)
- Barabanki Exit: Connecting Haidergarh and regional state highways
- Amethi Exit: Connecting Jagdishpur industrial area and Musafirkhana
- Sultanpur Exit: Connecting NH-56 (Lucknow - Varanasi Highway) and emergency airstrip (Kurebhar)
- Ayodhya Linkage: Regional spur connection via Ambedkar Nagar / Sultanpur border
- Ambedkar Nagar Exit: Serving Akbarpur and Tanda industrial zones
- Azamgarh Exit & Spur: Major junction with the Gorakhpur Link Expressway (at Salampur)
- Mau Exit: Connecting Mohammadabad Gohna and Varanasi-Gorakhpur corridor
- Ghazipur Terminal Point: Haidaria on NH-31 (connecting onward to Buxar, Bihar border, and Patna)
Districts & Major Locations Along Purvanchal Expressway
The 340.8 km expressway traverses 9 districts in eastern Uttar Pradesh across 8 completed construction packages.
Origin at Chand Sarai (NH-731), Mohanlalganj tehsil
Traverses Haidergarh tehsil corridors
Crosses Musafirkhana & Jagdishpur industrial tehsils
Passes Kurebhar, Jaisinghpur & 3.2 km emergency airstrip
Spur connection to NH-27 (Ayodhya - Gorakhpur section)
Connects industrial belt via Akbarpur
Major junction point with Gorakhpur Link Expressway
Traverses Mohammadabad Gohna & Mau industrial node
Terminal point at Haidaria (NH-31) near Bihar border
Purvanchal Expressway Route Alignment
The alignment of the Purvanchal Expressway starts from Chand Sarai village on the Lucknow-Sultanpur road (NH-731) and ends at Haidaria village on National Highway 31 in Ghazipur district. This alignment provides a direct, uninterrupted link across eastern Uttar Pradesh, cutting down bypass time and enabling seamless transit from state capital Lucknow towards Varanasi, Gorakhpur, and the Bihar border.
Travel Time on Purvanchal Expressway
The 340.8 km Purvanchal Expressway reduces travel time between Lucknow and Ghazipur from approximately 6–7 hours to about 3.5–4 hours. By avoiding congested city centres and single-lane highway corridors, the expressway enables high-speed passenger and commercial transit across eastern Uttar Pradesh.
Purvanchal Expressway Overview & Connectivity
The Purvanchal Expressway (पूर्वांचल एक्सप्रेसवे) is a 340.824 km, 6-lane (expandable to 8-lane) access-controlled greenfield expressway built by UPEIDA and inaugurated in November 2021. Together with the Agra–Lucknow Expressway and Yamuna Expressway, it forms an uninterrupted ~945 km expressway spine from Delhi NCR (Noida) to the Bihar border at Ghazipur.
- 100% operational across all 8 civil construction packages from Lucknow to Ghazipur
- Includes a 3.2 km Indian Air Force emergency landing strip at Kurebhar in Sultanpur district
- Direct interchange with the 91.35 km Gorakhpur Link Expressway in Azamgarh district
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Purvanchal Expressway is a 340.824 km, fully access-controlled, six-lane greenfield expressway in Uttar Pradesh. It connects Chand Sarai in Lucknow district with Haidaria in Ghazipur district and is designed for expansion to eight lanes.
The Purvanchal Expressway route starts at Chand Sarai on the Lucknow-Sultanpur Road in Lucknow district and ends near Haidaria on NH-19 in Ghazipur district, close to the Uttar Pradesh-Bihar border. The expressway provides an east-west connection across eastern Uttar Pradesh.
The Purvanchal Expressway route passes through nine districts: Lucknow, Barabanki, Amethi, Sultanpur, Ayodhya, Ambedkar Nagar, Azamgarh, Mau and Ghazipur.
The Purvanchal Expressway route map shows the 340.824 km access-controlled corridor from Chand Sarai in Lucknow to Haidaria in Ghazipur. The alignment crosses nine districts—Lucknow, Barabanki, Amethi, Sultanpur, Ayodhya, Ambedkar Nagar, Azamgarh, Mau and Ghazipur.
UPEIDA publishes an official Purvanchal Expressway project map showing the complete corridor and its major locations and districts. The official route begins at Chand Sarai in Lucknow and terminates at Haidaria in Ghazipur.
The official Purvanchal Expressway project map shows the expressway alignment across eastern Uttar Pradesh, including the major chainage points and the nine districts connected by the corridor. UPEIDA's project page provides the official project map as a downloadable document.
The Purvanchal Expressway is 340.824 km long. It is a six-lane access-controlled expressway, with the structures designed to allow future expansion of the carriageway to eight lanes.
The Purvanchal Expressway project cost is ₹22,494.66 crore, including the cost of land, according to UPEIDA's current project information.
The Purvanchal Expressway alignment runs from Chand Sarai in Lucknow district to Haidaria in Ghazipur district. The detailed project is divided into eight construction packages covering the corridor through Barabanki, Amethi, Sultanpur, Azamgarh, Mau and Ghazipur, along with the other districts on the route.
The Purvanchal Expressway is fully access-controlled, so vehicles enter and leave through designated interchanges and access points rather than unrestricted road crossings. UPEIDA's project documents identify interchanges and toll-plaza facilities along the corridor, but a single current official list of every exit by commonly used place name is not published on the main project page; therefore, individual exit names should not be inferred from district names alone.
For FY 2025-26, UPEIDA published link-wise toll rates for the Purvanchal Expressway. For a car, jeep, van or light motor vehicle, the published single-journey rate for the full A-to-M distance is ₹700 after the stated 25% discount on the base toll rate. The actual toll for a journey depends on the entry and exit points.
UPEIDA invited bids in December 2025 for selection of a contractor to collect user fees and operate the toll plazas on the Purvanchal Expressway, along with deployment of ambulances, patrolling vehicles and safety vehicles. This tender relates to toll and operational management of the existing expressway.
Yes. The Purvanchal Expressway is an operational access-controlled expressway. The main carriageway was opened to traffic in 2021, and UPEIDA currently publishes toll rates and operational tenders for the expressway.
The Purvanchal Expressway is operational and maintained as part of Uttar Pradesh's expressway network. UPEIDA continues to publish current toll rates, operation and maintenance-related tenders, and other operational information for the 340.824 km corridor.
Recent UPEIDA updates include the publication of FY 2025-26 Purvanchal Expressway toll rates and tenders for toll-plaza operation and user-fee collection, as well as operation and maintenance-related services. These updates concern the ongoing operation and management of the existing expressway rather than a new construction phase.
The Purvanchal Expressway route map used during the project's construction and opening period showed the corridor from Chand Sarai in Lucknow to Haidaria in Ghazipur across nine districts. UPEIDA's project documentation identifies the expressway length as 340.824 km; older maps and project documents may use historical terminology or earlier planning details, so the current UPEIDA project page should be used for present-day route and project specifications.
The Purvanchal Expressway road map follows an east-west alignment from Lucknow through Barabanki, Amethi, Sultanpur, Ayodhya, Ambedkar Nagar, Azamgarh and Mau before terminating in Ghazipur. The 340.824 km corridor connects with the wider Uttar Pradesh expressway network and provides access-controlled movement toward eastern Uttar Pradesh.
The Purvanchal Expressway does not directly terminate in Varanasi. UPEIDA's project information identifies a separate link road connection to Varanasi, while the main expressway itself terminates near Haidaria in Ghazipur district.
Purvanchal Expressway uses a closed-loop FASTag system charging approximately ₹1.98 to ₹2.15 per km for Cars, Jeeps, and LMVs. Entering at Chand Sarai (Lucknow Start), one-way car tolls range from ₹75 (Haidergarh) and ₹485 (Azamgarh Main) up to ₹700 for Haidaria (Ghazipur End), while 24-hour round-trip car fares range from ₹150 up to ₹1,400.
Purvanchal Expressway has 13 entry/exit plazas: Chand Sarai (Entry 1), Haidergarh, Inhauna/Rudauli, Jagdishpur/Kurebhar, Sultanpur North, Sultanpur East, Dostpur, Akbarpur/Katrighat, Ahiraula, Azamgarh Main, Mau, Ghazipur West, and Haidaria. Car one-way tolls range from ₹45–₹625 across Entries 2–5, ₹35–₹560 across Entries 6–9, and ₹40–₹700 across Entries 10–13.
Related Infrastructure Projects
Ganga Expressway
A major 594 km greenfield access-controlled expressway connecting Meerut and Prayagraj in Uttar Pradesh.
View Project →Gorakhpur Link Expressway
A ₹5,876 crore 91.35 km 4-lane access-controlled expressway connecting Gorakhpur directly to the Purvanchal Expressway.
View Project →Lucknow Ring Road
An outer ring road bypass encircling Lucknow to decongest the state capital, with parts already operational.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
