Advertisement // Sponsor

Verified Partner
Loading sponsor...
CORRIDOR DOSSIER INDEX // PURVANCHAL-EXPRESSWAY

Purvanchal Expressway Route Map, Toll Rates, Status & Latest Updates (2026)

Last Updated: 10 November 2026
StatusFully Operational
Length340.8 km
Corridor StatusAll 1 Packages Open (100%)
CompletionCompleted (Inaugurated Nov 2021)
Last Updated10 November 2026
The Purvanchal Expressway is a 340.8 km six-lane access-controlled expressway developed by UPEIDA in Uttar Pradesh. Fully opened and operational since November 2021, the expressway connects Chand Sarai in Lucknow to Haidaria in Ghazipur across 9 districts, reducing travel times from 7 hours to approximately 3.5–4 hours.
Length340.8 km
RouteLucknow – Ghazipur
StateUttar Pradesh
Operational SinceNovember 2021
AuthorityUPEIDA
Packages8 Packages
StatusFully Operational
Car Toll (Full Stretch)₹700

The Purvanchal Expressway (also searched as the Lucknow Ghazipur Expressway) is a 340.824 km, six-lane access-controlled greenfield expressway developed and operated by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA).

Officially inaugurated and opened to public traffic in November 2021, the expressway originates at Chand Sarai village on the Lucknow-Sultanpur Road (NH-731) and terminates at Haidaria village on NH-31 in Ghazipur district near the Bihar border. Traversal time across eastern Uttar Pradesh has dropped from 7–8 hours to under 4 hours.

Project Summary

The Purvanchal Expressway is set for substantial network expansion, with the UP Cabinet recently approving a 117 km Vindhya-Purvanchal Link and an Agra-Lucknow-Purvanchal connection as part of a broader Rs 47,000 crore investment in new expressways. These strategic additions significantly enhance the operational corridor's regional connectivity, solidifying its role as a critical infrastructure backbone in Uttar Pradesh.

पूर्वांचल एक्सप्रेसवे (Purvanchal Expressway)

पूर्वांचल एक्सप्रेसवे उत्तर प्रदेश में 340.8 किमी लंबा 6-लेन ग्रीनफील्ड एक्सप्रेसवे है जो लखनऊ को गाजीपुर से जोड़ता है।

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length340.8 km
Estimated Cost~₹22,496 Crore
Implementing AgencyUPEIDA
Current StatusFully Operational
Completion16 November 2021
Route Map

Purvanchal Expressway Interactive Route Map & Alignment

Explore the official 340.8 km Purvanchal Expressway corridor from Chand Sarai (Lucknow) to Haidaria (Ghazipur), featuring interchange exits, major river bridges, and 9 traversed districts.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Purvanchal Expressway Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NamePurvanchal Expressway
Total Length340.8 km
Estimated Cost~₹22,496 Crore
Current StatusFully Operational
Fully operational 340.824 km 6-lane access-controlled expressway developed by UPEIDA connecting Lucknow to Ghazipur across 9 districts.
Project Parameters & Technical Details

Purvanchal ExpresswayCost • Route • Timeline

ParameterTechnical Details
Lanes6 Lanes (Expandable to 8 Lanes)
Design Speed120 km/h
Project NamePurvanchal Expressway (Lucknow–Ghazipur Expressway)
Total Length340.824 km
East TerminalHaidaria, Ghazipur (NH-31, near Bihar Border)
West TerminalChand Sarai, Lucknow (NH-731)
Current StatusFully Operational
Estimated Cost~₹22,496 Crore
Total Packages8 Civil Construction Packages (All Completed)
Inauguration Date16 November 2021
Target CompletionCompleted (Inaugurated Nov 2021)
Emergency Airstrip3.2 km IAF Emergency Landing Strip at Kurebhar (Sultanpur)
Implementing AgencyUPEIDA
Implementing AuthorityUPEIDA
Closed-Loop Distance-Based FASTag System · ₹1.98–₹2.15 / km (Car / Jeep / LMV)

Purvanchal Expressway Toll Rates & 13-Plaza Matrix

UPEIDA Closed-Loop FASTag Tariff

Because the 340.8 km Purvanchal Expressway operates a closed-loop tolling system across 13 entry/exit plazas from Chand Sarai (Lucknow) to Haidaria (Ghazipur), drivers are billed strictly for the distance travelled between entry and exit stations (~₹1.98 to ₹2.15 per km for Cars, Jeeps, and LMVs).

ℹ️ Closed-Loop Entry & Exit Tolling Architecture (13 Plazas)

Purvanchal Expressway tracks your exact entry and exit stations across 13 toll plazas. Entry 1 (Chand Sarai, Lucknow) spans ₹75 (Haidergarh) to ₹700 (Haidaria) one-way (₹150–₹1,400 round-trip in 24h), while Entries 2–5 scale ₹45–₹625, Entries 6–9 scale ₹35–₹560, and Entries 10–13 scale ₹40–₹700.

Purvanchal Expressway 13 Entry / Exit Toll Plazas
13 Plazas · Closed-Loop
No.Toll Plaza NamePlaza Code / ChainageInterchange Details & Connectivity
1Chand Sarai Toll PlazaEntry 1 · Lucknow StartWestern terminus entry/exit plaza in Lucknow (full route to Haidaria: ₹700 one-way / ₹1,400 24h round-trip)
2Haidergarh Toll PlazaEntry 2 · BarabankiBarabanki sector interchange plaza (₹75 from Chand Sarai; Entries 2–5 span ₹45–₹625)
3Inhauna / Rudauli Toll PlazaEntry 3 · Amethi / AyodhyaInterchange serving Inhauna & Rudauli belt (₹120 from Chand Sarai)
4Jagdishpur / Kurebhar Toll PlazaEntry 4 · AmethiJagdishpur & Kurebhar interchange plaza (₹170 from Chand Sarai)
5Sultanpur (North) Toll PlazaEntry 5 · SultanpurNorthern Sultanpur interchange plaza (₹250 from Chand Sarai)
6Sultanpur (East) Toll PlazaEntry 6 · SultanpurEastern Sultanpur interchange plaza (₹285 from Chand Sarai; Entries 6–9 span ₹35–₹560)
7Dostpur Toll PlazaEntry 7 · SultanpurDostpur interchange plaza (₹330 from Chand Sarai)
8Akbarpur / Katrighat Toll PlazaEntry 8 · Ambedkar NagarAkbarpur / Katrighat interchange plaza (₹375 from Chand Sarai)
9Ahiraula Toll PlazaEntry 9 · Azamgarh WestAhiraula interchange plaza serving western Azamgarh (₹420 from Chand Sarai)
10Azamgarh (Main) Toll PlazaEntry 10 · AzamgarhMain Azamgarh interchange near Gorakhpur Link junction (₹485 from Chand Sarai; Entries 10–13 span ₹40–₹700)
11Mau Toll PlazaEntry 11 · MauMau district interchange plaza (₹525 from Chand Sarai)
12Ghazipur (West) Toll PlazaEntry 12 · GhazipurWestern Ghazipur interchange plaza (₹605 from Chand Sarai)
13Haidaria Toll PlazaEntry 13 · Ghazipur EndEastern terminus plaza near UP–Bihar border (₹700 one-way / ₹1,400 round-trip back to Chand Sarai)
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→

Closed-Loop Matrix Note: Per-km car tariffs fall between ₹1.98 and ₹2.15 per km (averaging ~₹2.05/km for ₹700 over 340.8 km). 24-hour round-trip car fares shown from Chand Sarai equal 2× the single-journey fare (₹150 to ₹1,400).

ℹ️ Tariff Reference

Tariff Benchmark: Light motor vehicles (Car/Jeep/LMV) pay ~₹1.98–₹2.15 per km across the 13 closed-loop plazas (Chand Sarai Entry 1 through Haidaria Entry 13), with ₹700 one-way / ₹1,400 round-trip end-to-end.

Interchanges & Entry/Exit Points

Purvanchal Expressway Exit List

Major grade-separated interchanges and spur connections along the 340.8 km Lucknow–Ghazipur corridor.

  • Lucknow Entry / Origin: Chand Sarai on NH-731 (Lucknow–Sultanpur Road)
  • Barabanki Exit: Connecting Haidergarh and regional state highways
  • Amethi Exit: Connecting Jagdishpur industrial area and Musafirkhana
  • Sultanpur Exit: Connecting NH-56 (Lucknow - Varanasi Highway) and emergency airstrip (Kurebhar)
  • Ayodhya Linkage: Regional spur connection via Ambedkar Nagar / Sultanpur border
  • Ambedkar Nagar Exit: Serving Akbarpur and Tanda industrial zones
  • Azamgarh Exit & Spur: Major junction with the Gorakhpur Link Expressway (at Salampur)
  • Mau Exit: Connecting Mohammadabad Gohna and Varanasi-Gorakhpur corridor
  • Ghazipur Terminal Point: Haidaria on NH-31 (connecting onward to Buxar, Bihar border, and Patna)
Corridor Geography & Route Nodes

Districts & Major Locations Along Purvanchal Expressway

The 340.8 km expressway traverses 9 districts in eastern Uttar Pradesh across 8 completed construction packages.

Lucknow
Package 1

Origin at Chand Sarai (NH-731), Mohanlalganj tehsil

Barabanki
Package 1 & 2

Traverses Haidergarh tehsil corridors

Amethi
Package 2 & 3

Crosses Musafirkhana & Jagdishpur industrial tehsils

Sultanpur
Package 3 & 4

Passes Kurebhar, Jaisinghpur & 3.2 km emergency airstrip

Ayodhya
Regional Spur

Spur connection to NH-27 (Ayodhya - Gorakhpur section)

Ambedkar Nagar
Package 5

Connects industrial belt via Akbarpur

Azamgarh
Package 6 & 7

Major junction point with Gorakhpur Link Expressway

Mau
Package 7

Traverses Mohammadabad Gohna & Mau industrial node

Ghazipur
Package 8

Terminal point at Haidaria (NH-31) near Bihar border

Corridor Trajectory

Purvanchal Expressway Route Alignment

The alignment of the Purvanchal Expressway starts from Chand Sarai village on the Lucknow-Sultanpur road (NH-731) and ends at Haidaria village on National Highway 31 in Ghazipur district. This alignment provides a direct, uninterrupted link across eastern Uttar Pradesh, cutting down bypass time and enabling seamless transit from state capital Lucknow towards Varanasi, Gorakhpur, and the Bihar border.

Travel Advisory

Travel Time on Purvanchal Expressway

The 340.8 km Purvanchal Expressway reduces travel time between Lucknow and Ghazipur from approximately 6–7 hours to about 3.5–4 hours. By avoiding congested city centres and single-lane highway corridors, the expressway enables high-speed passenger and commercial transit across eastern Uttar Pradesh.

Eastern UP Flagship Expressway

Purvanchal Expressway Overview & Connectivity

The Purvanchal Expressway (पूर्वांचल एक्सप्रेसवे) is a 340.824 km, 6-lane (expandable to 8-lane) access-controlled greenfield expressway built by UPEIDA and inaugurated in November 2021. Together with the Agra–Lucknow Expressway and Yamuna Expressway, it forms an uninterrupted ~945 km expressway spine from Delhi NCR (Noida) to the Bihar border at Ghazipur.

  • 100% operational across all 8 civil construction packages from Lucknow to Ghazipur
  • Includes a 3.2 km Indian Air Force emergency landing strip at Kurebhar in Sultanpur district
  • Direct interchange with the 91.35 km Gorakhpur Link Expressway in Azamgarh district

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Purvanchal Expressway is a 340.824 km, fully access-controlled, six-lane greenfield expressway in Uttar Pradesh. It connects Chand Sarai in Lucknow district with Haidaria in Ghazipur district and is designed for expansion to eight lanes.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement