Advertisement // Sponsor
Verified PartnerLucknow–Kanpur Expressway Route Map, Status & Latest Updates (2026)
The Lucknow–Kanpur Expressway (NE-6) is an upcoming 62.7 km long, 6-lane access-controlled highway connecting the capital city of Lucknow with the industrial hub of Kanpur in Uttar Pradesh. Starting near Amausi Airport in Lucknow and terminating at Chakeri in Kanpur, the corridor will slash travel times from over 2 hours to about 45 minutes, significantly boosting economic activity and easing traffic on the existing NH-27.
The Lucknow-Kanpur Expressway project has made significant progress with the PNC Corporation receiving shareholder approval to begin work, despite initial damage caused by rain. The expressway is currently open for use but with diversions due to damaged sections which are being repaired swiftly by the NHAI (National Highways Authority of India). Contract status shows a 18% share price increase, indicating investor confidence in the project's progress and potential. Additionally, construction has begun on land acquisition activities, paving the way for further development along the expressway corridor.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Lucknow–Kanpur Expressway (NE-6) Route Map & Package Status
Explore the interactive route alignment of the 62.7 km Lucknow–Kanpur Expressway (National Expressway 6 / Awadh Expressway) across Package 1 (Lucknow–Bani elevated section) and Package 2 (Bani–Kanpur greenfield section).
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerLucknow–Kanpur ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Lanes | 6 lanes (3-lane dual carriageway, expandable to 8 lanes) |
| End Point | Azad Marg Chauraha (near Ganga Bridge / Shuklaganj), Kanpur |
| Contractor | PNC Infratech Ltd (Packages 1 & 2 under HAM) |
| Start Point | Shaheed Path (near Amausi Airport), Lucknow |
| Design Speed | 120 km/h (operational limit 100 km/h) |
| Project Name | Lucknow–Kanpur Expressway (NE-6 / Awadh Expressway) |
| Total Length | 62.7 km |
| Current Status | Under Construction / Execution |
| Estimated Cost | ₹4,730 Crores |
| Corridor Length | 62.7 km (18 km Elevated + 44.7 km Greenfield) |
| Districts Covered | 3 districts (Lucknow, Unnao, Kanpur Nagar) |
| Target Completion | Mid 2026 |
| Major Interchanges | Amausi (Lucknow), Bani, Unnao (Ganga Expressway Junction), Kanpur (Azad Marg) |
| Expected Completion | Mid 2026 (99% physical progress achieved) |
| Implementing Agency | National Highways Authority of India (NHAI) |
| Implementing Authority | NHAI |
Districts & Packages Covered by Lucknow–Kanpur Expressway
The expressway links Uttar Pradesh's administrative capital Lucknow with its largest industrial hub Kanpur via Unnao.
Elevated 6-lane urban bypass past Chaudhary Charan Singh International Airport (Amausi), Banthra, and Bani.
Access-controlled greenfield corridor through 31 villages in Unnao with a cloverleaf interchange with the Meerut–Prayagraj Ganga Expressway and UP Defence Industrial Corridor.
Connects at Azad Marg near Shuklaganj/Ganga Bridge with proposed link to Kanpur Ring Road.
Both packages are executed by PNC Infratech under the Hybrid Annuity Model (HAM).
Lucknow–Kanpur Expressway (Awadh Expressway) Route Alignment
The 62.7 km Lucknow–Kanpur Expressway (NE-6) starts near Shaheed Path / Amausi Airport in South Lucknow and runs parallel to NH-27 before branching onto a 44.7 km greenfield alignment through Unnao district to terminate near Azad Marg Chauraha / Ganga Bridge at Kanpur. Package 1 (18 km) features a continuous 3+3 lane elevated flyover bypassing Amausi, Banthra, and Bani, while Package 2 (44.7 km) is a greenfield corridor through Unnao with a direct interchange with the Ganga Expressway.
Lucknow to Kanpur Travel Time Reduction
The 6-lane access-controlled Awadh Expressway (NE-6) cuts road travel time between Lucknow and Kanpur from 2–3 hours on congested NH-27 down to 35–45 minutes.
Lucknow–Kanpur Expressway Latest Update & Opening Timeline
The 45 km greenfield Unnao section (Package 2) is complete, and concrete girder launching and deck slabbing on the 18 km elevated Lucknow package (Package 1) have reached 99% overall progress, with final finishing works on ramps and toll plazas underway for a Mid-2026 public inauguration. NHAI has also prepared the toll structure for commercial operations.
- November 2018: DPR finalised and submitted to Government of Uttar Pradesh.
- 7 March 2019: Foundation stone laid by Union Ministers Rajnath Singh and Nitin Gadkari.
- 15 December 2020: Officially notified as National Expressway 6 (NE-6).
- February 2022: PNC Infratech awarded both Package 1 and Package 2 under HAM.
- October 2025: 45 km Unnao greenfield section completed.
- May 2026: Overall physical progress reached 99% with ramp and toll plaza finishing underway for Mid-2026 opening.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Lucknow Kanpur Expressway is a 63 km six-lane greenfield, access-controlled expressway in Uttar Pradesh, developed by NHAI under the Bharatmala programme. It provides a high-speed alternative to the existing Lucknow–Kanpur road corridor and connects the two cities through a new alignment.
The expressway runs from the Lucknow side to Kanpur through a greenfield alignment, with the project divided into two main packages. Package 1 covers approximately km 10.980 to km 28.500, while Package 2 covers km 28.500 to km 73.744, including the associated spur. The corridor connects with the existing highway network at both ends.
The Lucknow Kanpur Expressway map follows the 63 km greenfield corridor between Lucknow and Kanpur. The project alignment is represented through the two NHAI construction packages, from km 10.980 through km 73.744. Official NHAI project documents are preferable for the detailed alignment over older unofficial route maps.
The Lucknow Kanpur Expressway has a total project length of approximately 63 km. NHAI records identify the overall greenfield project as 63 km, with Package 1 covering about 17.52 km and Package 2 covering about 45.24 km.
The project is commonly reported at around ₹4,200 crore. The two PNC Infratech concession packages had bid project costs of ₹779.75 crore for Package 1 and ₹776.85 crore for Package 2 in the original financial-closure documents, while later project reporting uses the broader project cost of about ₹4,200 crore.
PNC Infratech was the concessionaire for the two main Kanpur–Lucknow Expressway packages under the Hybrid Annuity Model. Package 1 was awarded to Kanpur Lucknow Expressway Private Limited and Package 2 to Awadh Expressway Private Limited, both associated with PNC Infratech.
The NHAI project was divided into two HAM packages. Package 1 covered km 10.980–28.500 and Package 2 covered km 28.500–73.744. PNC Infratech's associated concession companies were awarded the two packages, with construction periods specified in the concession arrangements.
The six-lane greenfield Lucknow–Kanpur Expressway was inaugurated in July 2026. The project had reached completion before its opening, with NHAI records showing Package 2 had received its completion certificates and the corridor subsequently opened to traffic.
The expressway is operational, but its current operation has been affected by structural distress on parts of the corridor. In July 2026, a roughly 300-metre stretch near km 64 developed slippage. NHAI ordered restoration and a technical investigation, diverted traffic around the affected location and took action against the concessionaire and other responsible stakeholders.
The latest update is that NHAI has imposed a three-year debarment on PNC Infratech, the concessionaire associated with the expressway, following defects and premature failures identified after opening. NHAI has also pursued recovery of lost toll revenue and required restoration of affected stretches. The debarment letter was issued on 11 September 2026.
After opening in July 2026, several defects and surface failures were reported, including approximately 300 metres of slippage near km 64 following heavy rainfall. NHAI initiated restoration work and a technical assessment, while an expert investigation examined the causes of the premature failures.
Toll collection was suspended after the reported structural failures while corrective and investigative work was undertaken. NHAI subsequently pursued compensation from the concessionaire for toll revenue lost during the suspension period.
Related Infrastructure Projects
Ganga Expressway
A major 594 km greenfield access-controlled expressway connecting Meerut and Prayagraj in Uttar Pradesh.
View Project →Delhi–Varanasi High-Speed Rail
An 865 km high-speed rail corridor at 320 km/h forming the northern spine of India's Diamond Quadrilateral HSR network.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.