Advertisement // Sponsor

Verified Partner
Loading sponsor...
CORRIDOR DOSSIER INDEX // LUCKNOW-RING-ROAD

Lucknow Ring Road (Kisan Path) Route Map, Toll Rates, Status & Latest Updates (2026)

Last Updated: 21 June 2026
StatusPartially Operational
Length104 km
Corridor StatusAll 1 Packages Open (100%)
Completion Target2026
Last Updated21 June 2026
The Lucknow Ring Road (Lucknow Outer Ring Road, designated as NH-230) is a 104 km circular highway bypass. The latest November 2026 update confirms that the entire ring road, including the Kisan Path section, is now 80% operational/under-construction, saving over 35 minutes of transit time across Lucknow and Barabanki districts.
Length104 km
RouteEncircling Lucknow (Circular Bypass)
Districts CoveredLucknow, Barabanki
AuthorityNHAI
Packages8 monitored sections
Travel Time Saved35 minutes
StatusPartially Operational
Last Updated21 June 2026

The Lucknow Ring Road (Kisan Path / NH-230) is an operational 104 km long 8-lane ring expressway encircling Uttar Pradesh's capital Lucknow. Connecting Ayodhya Highway, Kanpur Highway, Sultanpur Road, Raebareli Road, and Sitapur Road, it enables non-stop regional freight bypass around Lucknow.

Project Summary

The Lucknow Outer Ring Road, anticipated to complete by December 2023, is now a focal point for regional expansion, with a survey initiated in April 2025 for its integration into the State Capital Region project. This strategic development, backed by a Rs 6124

लखनऊ आउटर रिंग रोड (किसान पथ - NH-230)

लखनऊ आउटर रिंग रोड (किसान पथ) लखनऊ के चारों ओर १०४ किमी लंबा ८-लेन एक्सप्रेसवे कॉरिडोर है। यह अयोध्या रोड, कानपुर रोड, सीतापुर रोड और सुल्तानपुर रोड को सीधे जोड़ते हुए भारी वाहनों को शहर से बाहर बाईपास करता है।

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length104 km
Estimated Cost~₹5,500 Crore
Implementing AgencyNHAI / State Highway Authority
Current StatusPartially Operational
Completion Target2026
Route Map

Lucknow Ring Road (Lucknow Outer Ring Road) Route Map & Alignment

View and download the latest Lucknow Ring Road route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Lucknow Ring Road Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameLucknow Ring Road
Total Length104 km
Estimated Cost~₹5,500 Crore
Current StatusPartially Operational
Kisan Path Deep Dive

What is Kisan Path?

Kisan Path (officially a primary alignment segment of the Lucknow Outer Ring Road NH-230) is a vital 11-kilometer express bypass corridor designed to streamline logistics and heavy transit on the eastern side of Lucknow, Uttar Pradesh. It connects two of the region's most heavily traveled highways: the Lucknow–Ayodhya Road (NH-27) and the Lucknow–Sultanpur Road (NH-56).

Key Objective:To prevent heavy commercial trucks and long-haul transport carriers from entering the inner city lanes of Lucknow, thereby cutting down peak-hour urban traffic congestion and reducing vehicular emissions across residential colonies.

History & Why It Was Built

Historically, the eastern periphery of Lucknow suffered from severe logistical bottlenecks. Industrial freight moving between eastern Uttar Pradesh (Gorakhpur, Basti, Ayodhya) and southern/western links (Sultanpur, Prayagraj, Varanasi, Raebareli) had to traverse through Lucknow's central arterial roads like Shaheed Path, causing massive gridlocks.

To resolve this, the National Highways Authority of India (NHAI) alongside the State Government formulated the Lucknow Outer Ring Road master plan. The Kisan Path section was prioritized as the initial greenfield bypass project to bridge the critical gap between NH-27 and NH-56. Construction was executed on a fast-track mode, employing state-of-the-art flyovers, cloverleaves, and service channels.

Route Alignment & Districts Covered

The Kisan Path route begins near the Indira Canal on the Ayodhya Road (NH-27) and terminates near the Sultanpur Road (NH-56) intersection. The alignment runs predominantly through the rural-urban fringe of the Lucknow and Barabanki districts. It is built as a 4-lane access-controlled highway featuring paved shoulders, modern drainage structures, and underpasses for local agrarian vehicles.

National Highway (NH) Connections & Relation to Outer Ring Road

As part of the larger 104 km Lucknow Outer Ring Road (NH-230) project, Kisan Path behaves as a foundational hub. While the Outer Ring Road encompasses an entire circular loop connecting Kanpur Road (NH-25), Sitapur Road (NH-24), and Raebareli Road (NH-30), Kisan Path manages the heavy-density cargo flow between the eastern and northeastern gateways. Commuters transitioning to the Purvanchal Expressway or Lucknow–Kanpur Expressway rely directly on the Kisan Path loop to bypass the metropolitan core seamlessly, saving approximately 35 minutes of travel time.

Project Parameters & Technical Details

Lucknow Ring RoadCost • Route • Timeline

ParameterTechnical Details
Project NameLucknow Ring Road
Total Length104.0 km
Current StatusPartially Operational
Estimated Cost~₹5,500 Crore
Target Completion2026
Implementing AuthorityNHAI / State Highway Authority

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Lucknow Ring Road, also referred to as the Lucknow Outer Ring Road or Kisan Path in many sources, is a major bypass corridor around Lucknow developed to divert through traffic away from the city and connect major national highways. The NHAI-developed Ring Road consists of multiple packages connecting the Sultanpur, Behta, Sitapur, Kursi and Ayodhya-side highway corridors.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement