Verified PartnerGanga Expressway (गंगा एक्सप्रेसवे) Route Map, Toll Rates & Exit Guide (2026)
The Ganga Expressway was officially inaugurated by Prime Minister Narendra Modi on 29 April 2026. Uttar Pradesh government announced a 15-day toll-free period immediately after opening to encourage public use. It is a 594 km long, 6-lane greenfield access-controlled expressway in Uttar Pradesh, India, connecting Meerut with Prayagraj, significantly reducing travel time between western and eastern UP.
The Ganga Expressway project has seen both significant strides and challenges in recent months. Construction of the expressway is progressing towards its target, with plans to transform Meerut into a major industrial hub along its route. However, ongoing waterlogging issues have caused disruptions, particularly in areas like Hardoi, Unnao, and Muzaffarnagar. The project has also faced criticism regarding its designation as both an expressway and a potential fishing spot. While the toll plaza in Unnao was submerged by waterlogging causing vehicle stranding, efforts are reportedly being made to address these issues through construction improvements and land acquisition plans. Despite some operational challenges, the overall direction of the Ganga Expressway project remains focused on its development as an industrial corridor from Meerut to Haridwar.
गंगा एक्सप्रेसवे (Ganga Expressway)
गंगा एक्सप्रेसवे उत्तर प्रदेश में 594 किमी लंबा 6-लेन (8 लेन तक विस्तार योग्य) ग्रीनफील्ड एक्सप्रेसवे है जो मेरठ को प्रयागराज से जोड़ता है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Ganga Expressway Route Map (गंगा एक्सप्रेसवे मैप)
Explore the interactive 594 km Ganga Expressway route alignment from Bijauli (Meerut) to Judapur Dandu (Prayagraj) across all 12 operational packages.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerGanga ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Lanes | 6 lanes (expandable to 8 lanes) |
| End Point | Judapur Dandu village, Prayagraj (on NH-19) |
| Contractors | IRB Infrastructure (Group 1: Packages 1–3) & Adani Enterprises (Groups 2–4: Packages 4–12) |
| Start Point | Bijauli village, Meerut (on NH-334) |
| Design Speed | 120 km/h (Operational limit: 100 km/h) |
| Project Name | Ganga Expressway |
| Total Length | 594.0 km |
| Current Status | Fully Operational |
| Estimated Cost | ₹36,230 Crores (Civil + Land Acquisition) |
| Total Packages | 12 Monitored Packages (100% Completed & Operational) |
| Corridor Length | 594 km (Phase-1 Operational) |
| Districts Covered | 12 districts across Western, Central & Eastern UP |
| Inauguration Date | 29 April 2026 (Inaugurated by PM Narendra Modi) |
| Target Completion | 29 April 2026 |
| Emergency Airstrip | 3.5 km Emergency Landing Facility (ELF) for IAF aircraft in Shahjahanpur |
| Main River Bridges | Ganga River Bridge (960m) & Ramganga River Bridge (720m) |
| Major Interchanges | Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Budaun, Shahjahanpur, Hardoi, Unnao (Lucknow-Kanpur Expwy), Raebareli, Pratapgarh, Prayagraj |
| Implementing Agency | UPEIDA |
| Implementing Authority | UPEIDA |
Ganga Expressway Official 23 Toll Plazas & UPEIDA O-D Fee Matrix
Complete north-to-south roster of all 23 toll plaza locations across the 594 km Ganga Expressway organized by Group I (Meerut Sector · IRB Infrastructure) and Groups II, III & IV (Budaun to Prayagraj · Adani Enterprises), followed by Group I Origin–Destination schedules (Plazas 1–8) and Groups II–IV cross-corridor schedules (Plazas 9–23) for Single Trip, 24-Hour Return Journey (1.6x single rate / 20% round-trip discount), and 20-Trip Commuter Pass (16x single rate / 20% bulk discount).
Under the official UPEIDA Origin–Destination (O-D) matrix system, toll fee tables are structured by concession groups. In a closed tolling expressway, individual interchange ramps do not each have independent standalone rate sheets; instead, every entry/exit point corresponds to a column/row within its respective Concession Group Matrix. Under UPEIDA's guidelines, a Return Journey completed within 24 hours receives a 20% discount on the total round-trip cost (charging 1.6x the Single Trip rate), and a 20-Trip Commuter Pass offers a 20% bulk discount (16x the Single Trip rate instead of 20x). Switch between Single Trip, Return Journey (24h), and 20 One-Way Trips Pass using the toggle below.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Meerut Main Toll Plaza (Bijauli / Kharkhari) | Ch. 13.400 | Group I (Meerut Sector · IRB Infrastructure) · Mainline terminal barrier at Ch. 13.400 |
| 2 | Group I Interchange Toll Plaza (Meerut–Hapur) | Ch. 19.941 | Group I (Meerut Sector · IRB Infrastructure) · Interchange toll plaza at Ch. 19.941 |
| 3 | Hapur–Garhmukteshwar (Simbhauli) Toll Plaza | Ch. 35.270 | Group I (Meerut Sector · IRB Infrastructure) · Interchange toll plaza at Ch. 35.270 |
| 4 | Bulandshahr–Garhmukteshwar (Syana) Toll Plaza | Ch. 54.640 | Group I (Meerut Sector · IRB Infrastructure) · Interchange toll plaza at Ch. 54.640 |
| 5 | Hasanpur–Anupshahar Toll Plaza | Ch. 74.181 | Group I (Meerut Sector · IRB Infrastructure) · Interchange toll plaza at Ch. 74.181 |
| 6 | Anupshahr–Moradabad (Sambhal) Toll Plaza | Ch. 102.427 | Group I (Meerut Sector · IRB Infrastructure) · Interchange toll plaza at Ch. 102.427 |
| 7 | Babrala–Chandausi (Bahjoi) Toll Plaza | Ch. 123.288 | Group I (Meerut Sector · IRB Infrastructure) · Interchange toll plaza at Ch. 123.288 |
| 8 | Group I Terminal Toll Plaza | Ch. 135.400 | Group I (Meerut Sector · IRB Infrastructure) · Mainline checkpoint at Ch. 135.400 |
| 9 | Group II Entry Toll Plaza | Ch. 146.700 | Group II (Budaun & Shahjahanpur Sector · Adani Enterprises) · Boundary checkpoint at Ch. 146.700 |
| 10 | Chandausi–Budaun Toll Plaza (Jakhauli) | Ch. 173.454 | Group II (Budaun & Shahjahanpur Sector · Adani Enterprises) · Interchange toll plaza at Ch. 173.454 |
| 11 | Budaun–Bareilly Toll Plaza (Nagla Barah) | Ch. 189.394 | Group II (Budaun & Shahjahanpur Sector · Adani Enterprises) · Interchange toll plaza at Ch. 189.394 |
| 12 | Group II Interchange Toll Plaza | Ch. 207.484 | Group II (Budaun & Shahjahanpur Sector · Adani Enterprises) · Interchange toll plaza at Ch. 207.484 |
| 13 | Farrukhabad–Shahjahanpur Toll Plaza | Ch. 255.167 | Group II (Budaun & Shahjahanpur Sector · Adani Enterprises) · Interchange toll plaza at Ch. 255.167 |
| 14 | Farrukhabad–Shahbad Toll Plaza | Ch. 282.845 | Group II (Budaun & Shahjahanpur Sector · Adani Enterprises) · Interchange toll plaza at Ch. 282.845 |
| 15 | Kannauj–Hardoi Toll Plaza | Ch. 329.945 | Group III (Hardoi & Unnao Sector · Adani Enterprises) · Interchange toll plaza at Ch. 329.945 |
| 16 | Group III Interchange Toll Plaza | Ch. 351.300 | Group III (Hardoi & Unnao Sector · Adani Enterprises) · Interchange toll plaza at Ch. 351.300 |
| 17 | Agra–Lucknow Expressway Interchange Toll Plaza | Ch. 378.155 | Group III (Hardoi & Unnao Sector · Adani Enterprises) · Mega connection hub at Ch. 378.155 |
| 18 | Kanpur–Lucknow Toll Plaza (Unnao) | Ch. 420.932 | Group III (Hardoi & Unnao Sector · Adani Enterprises) · Interchange toll plaza at Ch. 420.932 |
| 19 | Lalganj–Raebareli Toll Plaza | Ch. 487.285 | Group IV (Pratapgarh & Prayagraj Sector · Adani Enterprises) · Interchange toll plaza at Ch. 487.285 |
| 20 | Raebareli–Unchahar Toll Plaza | Ch. 517.708 | Group IV (Pratapgarh & Prayagraj Sector · Adani Enterprises) · Interchange toll plaza at Ch. 517.708 |
| 21 | Manikpur–Bela Pratapgarh Toll Plaza | Ch. 554.951 | Group IV (Pratapgarh & Prayagraj Sector · Adani Enterprises) · Interchange toll plaza at Ch. 554.951 |
| 22 | Group IV Interchange Toll Plaza | Ch. 576.587 | Group IV (Pratapgarh & Prayagraj Sector · Adani Enterprises) · Interchange toll plaza at Ch. 576.587 |
| 23 | Prayagraj Main Toll Plaza (Judapur Dandu) | Ch. 589.700 | Group IV (Pratapgarh & Prayagraj Sector · Adani Enterprises) · Mainline terminal barrier at Ch. 589.700 |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Includes Single Trip, 24-Hour Return Journey (1.6x single), and 20-Trip Commuter Pass (16x single) across 2/3 Wh & Tractor, Car / LMV, LCV / MiniBus, Bus / Truck, MAV (3–6 Axle), and 7+ Axle / Oversized classes.
Ganga Expressway Cities & 12 Districts Covered (गंगा एक्सप्रेसवे जिले और शहर)
The Ganga Expressway connects 12 districts and over 518 villages across Meerut Division, Rohilkhand, Central UP, and Prayagraj Division.
Western terminus at Bijauli on NH-334 connecting to Delhi–Meerut Expressway & RRTS.
Crosses NH-9 and the Ganga River via a major bridge near Garhmukteshwar.
Connects agricultural and dairy belt of eastern Bulandshahr.
Links Rohilkhand industrial and mango belt.
Provides first direct expressway access to Sambhal handicrafts/agro hub.
Longest district traverse in Rohilkhand with industrial corridor nodes.
Features the 3.5 km Emergency Landing Facility (ELF) airstrip for Indian Air Force fighter jets.
Connects central UP agro-processing zone and crosses Ramganga River.
Crucial double-expressway hub intersecting both Agra–Lucknow Expressway and Lucknow–Kanpur Expressway (NE-6).
Connects central Awadh industrial and rail coach manufacturing region.
Links eastern Awadh and Sangam pilgrimage belt.
Eastern terminus at Judapur Dandu on NH-19 (Prayagraj Bypass).
All 12 packages across 594 km are completed and operational as of 29 April 2026.
Ganga Expressway Route Alignment & Interchanges
The 594 km 6-lane (expandable to 8-lane) access-controlled Ganga Expressway originates at Bijauli village on NH-334 in Meerut and terminates at Judapur Dandu village on NH-19 in Prayagraj. It traverses 12 districts (Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Budaun, Shahjahanpur, Hardoi, Unnao, Raebareli, Pratapgarh, and Prayagraj) and features 17 major interchanges, a 960m bridge over the Ganga River, a 720m bridge over the Ramganga River, and a 3.5 km Indian Air Force emergency landing airstrip at Jalalabad in Shahjahanpur.
Meerut to Prayagraj Travel Time Reduction
The operational Ganga Expressway cuts road travel time between Meerut (NCR) and Prayagraj from 11–12 hours down to approximately 6 hours.
Ganga Expressway Operational Overview & Milestones
The Ganga Expressway is a 594 km, 6-lane (expandable to 8-lane) greenfield access-controlled expressway developed by UPEIDA across Uttar Pradesh. Approved in September 2021 with its foundation stone laid by PM Narendra Modi in Shahjahanpur in December 2021, the expressway was constructed under the DBFOT (PPP) model across 12 packages by IRB Infrastructure (Packages 1–3, Meerut to Budaun, 129.7 km) and Adani Enterprises (Packages 4–12, Budaun to Prayagraj, 464.3 km). It was officially inaugurated on 29 April 2026.
- September 2021: UP Cabinet approved the 594 km greenfield expressway DPR.
- December 2021: Letters of Award issued to IRB Infrastructure and Adani Enterprises; foundation stone laid by PM Narendra Modi in Shahjahanpur.
- April 2024: Over 99.5% land acquisition completed across all 12 districts.
- June 2025: Construction crossed 84% overall physical progress.
- 29 April 2026: Full 594 km Meerut–Prayagraj corridor inaugurated for commercial operations with an initial 15-day toll-free period.
गंगा एक्सप्रेसवे (Ganga Expressway in Hindi)
गंगा एक्सप्रेसवे उत्तर प्रदेश का 594 किलोमीटर लंबा 6-लेन (8-लेन तक विस्तार योग्य) ग्रीनफील्ड एक्सप्रेसवे है, जो मेरठ के बिजौली गाँव (NH-334) से प्रयागराज के जूदापुर दांदू गाँव (NH-19) तक जाता है। यह मेरठ, हापुड़, बुलंदशहर, अमरोहा, संभल, बदायूं, शाहजहांपुर, हरदोई, उन्नाव, रायबरेली, प्रतापगढ़ और प्रयागराज सहित 12 जिलों को जोड़ता है। 29 अप्रैल 2026 को इसका उद्घाटन किया गया और इससे मेरठ से प्रयागराज की यात्रा का समय 12 घंटे से घटकर लगभग 6 घंटे रह गया है।
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Ganga Expressway is a 593.947 km, six-lane access-controlled greenfield expressway in Uttar Pradesh, expandable to eight lanes. It connects Bijauli in Meerut district with Judapur Dandu near the Prayagraj bypass and passes through 12 districts: Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Rae Bareli, Pratapgarh and Prayagraj. UPEIDA is the state nodal agency. The main corridor was inaugurated on 29 April 2026.
The Ganga Expressway route runs east–west across Uttar Pradesh from Meerut to Prayagraj. It starts near Bijauli on NH-334 in Meerut and terminates at the Prayagraj bypass on NH-19. The corridor passes through 12 districts and connects western, central and eastern Uttar Pradesh through an access-controlled greenfield alignment.
The official Ganga Expressway map shows the 593.947 km Meerut–Prayagraj alignment divided into four development groups. UPEIDA publishes separate Group-I, Group-II, Group-III and Group-IV alignment maps. These official alignment documents are preferable for village, interchange and package-level mapping over third-party Google Maps routes.
UPEIDA publishes the Ganga Expressway alignment maps for all four groups and project documentation containing detailed alignment information. The corridor passes through more than 500 villages across the 12 districts, while the official project alignment documents provide the detailed village and chainage information. A third-party village list should therefore be cross-checked against the UPEIDA alignment documents before being treated as definitive.
The official project length is 593.947 km, generally rounded to 594 km. UPEIDA describes it as approximately 594 km, while the original four-group PPP documentation specifies 593.947 km. The corridor is six lanes and designed to be expandable to eight lanes.
The current widely reported project cost for the 594 km Ganga Expressway is approximately ₹36,230 crore. This is the project-level figure used by the Uttar Pradesh government and the Union government for the completed corridor. Older planning documents sometimes quote different figures, so ₹36,230 crore should be used for the completed Phase-I corridor rather than mixing it with earlier estimates or later expansion proposals.
The main 594 km Ganga Expressway is operational. Prime Minister Narendra Modi inaugurated the completed corridor on 29 April 2026 at Hardoi. UPEIDA's current project page also records the inauguration and identifies the corridor as the 594 km Meerut–Prayagraj expressway.
The Ganga Expressway was inaugurated on 29 April 2026. The foundation stone was laid on 18 December 2021, and the 594 km corridor was subsequently completed and opened to traffic in April 2026. Therefore, older completion dates such as December 2024 or 2025 are historical targets and should not be presented as the current completion date.
Construction of the main Ganga Expressway has been completed and the corridor is operational. The latest major milestone was its 29 April 2026 inauguration. The current focus is shifting toward associated connectivity and expansion projects, including the proposed Meerut–Haridwar extension and the Farrukhabad Link Expressway, rather than construction of the original 594 km corridor itself.
The Ganga Expressway's actual opening date is 29 April 2026, when the 594 km Meerut–Prayagraj corridor was inaugurated. This date supersedes earlier announced or targeted completion dates that appeared during construction.
The four main PPP development groups were awarded by UPEIDA to IRB Infrastructure Developers for Group-I and Adani Enterprises for Groups II, III and IV. UPEIDA's official bidder record shows IRB for Group-I and Adani for Groups II–IV. Construction was subsequently carried out through EPC contractors and subcontractors.
The 593.947 km project was divided into four groups containing 12 packages. IRB Infrastructure was the selected concessionaire for Group-I, covering Packages 1–3, while Adani Enterprises was selected for Groups II–IV, covering Packages 4–12. Major construction companies involved under these concessions included HG Infra Engineering on Group-II, Patel Infrastructure on Group-III and ITD Cementation on Group-IV; these companies should be described as EPC/subcontracting contractors rather than the primary UPEIDA concessionaires.
Yes. Adani Enterprises Ltd was selected by UPEIDA for Groups II, III and IV of the Ganga Expressway, representing the majority of the 594 km corridor. Adani Road Transport Ltd subsequently handled the development/construction ecosystem for these groups. Adani's own 2026 disclosures state that the Ganga Expressway was operationalised in April 2026 and that toll collection commenced in May 2026.
IRB Infrastructure Developers was the selected bidder for Group-I of the Ganga Expressway. Its concession covers the approximately 129.7 km Meerut–Budaun stretch, including districts such as Meerut, Hapur, Bulandshahr, Amroha, Sambhal and Budaun. IRB's project documentation lists the Group-I project cost at approximately ₹6,538 crore and the overall Ganga Expressway length at 594 km.
HG Infra Engineering was engaged by Adani Road Transport for the Ganga Expressway Group-II construction package. The Group-II design length is approximately 151.7 km, and HG Infra's project disclosures identify the Ganga Expressway as an Adani project. HG Infra later reported a provisional completion certificate for its Ganga Expressway work in June 2026.
Patel Infrastructure executed EPC work for Ganga Expressway Group-III under Adani Road Transport. Its project page identifies the Group-III section as running from km 289+300 near Ubariya Khurd in Hardoi to km 445+000 near Sarso in Unnao, with a design length of 155.700 km and a work value of approximately ₹4,732.57 crore. Patel Infrastructure also reported a 24-hour bituminous-concrete laying record on this section in May 2025.
Yes. CDS Infra Projects' own project portfolio lists 'Ganga Expressway Package 3' and identifies the mode as EPC with IRB. This is a contractor-level involvement and should not be confused with UPEIDA's four primary concessionaire groups, where IRB is the Group-I concessionaire.
Adani's involvement in the Ganga Expressway is established through its Groups II–IV concession and associated road-development operations. However, a project-specific 'Adani vacancy for Ganga Expressway' should not be treated as a permanent recruitment category unless an official Adani careers listing specifically identifies the Ganga Expressway project. The expressway itself is now operational, so current vacancies should be checked through Adani's official recruitment channels rather than assuming a Ganga Expressway-specific opening.
The principal 2026 development is that the 594 km Meerut–Prayagraj Ganga Expressway was inaugurated on 29 April 2026 and subsequently opened for operations. Adani Enterprises reported that toll collection began on 15 May 2026. Current developments increasingly concern the wider Ganga Expressway network, including the proposed Meerut–Haridwar extension and new link expressways.
The term 'Ganga Expressway Phase 2' is used for proposed extensions rather than the already operational 594 km Meerut–Prayagraj corridor. The clearest officially documented current extension is the proposed Meerut–Haridwar Expressway, which UPEIDA lists separately under its Proposed Plans. Other proposed links, including the Farrukhabad Link Expressway, are being developed to connect the Ganga Expressway with other expressway corridors. These should not be shown as part of the operational 594 km alignment.
The main Ganga Expressway passes through 12 districts: Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Rae Bareli, Pratapgarh and Prayagraj. Major urban centres associated with the corridor include Meerut, Bulandshahr, Badaun, Shahjahanpur, Hardoi, Unnao, Rae Bareli and Prayagraj.
Google Maps can be used for navigating the operational Ganga Expressway and locating its interchanges, but third-party map routes can change as access points and connected roads are updated. For the official Ganga Expressway alignment, package boundaries and village-level route information, UPEIDA's published Group-I to Group-IV alignment maps are the appropriate reference.
The Ganga Expressway road map follows a west-to-east alignment from Meerut to Prayagraj across Uttar Pradesh. It begins near NH-334 in Meerut and ends near the Prayagraj bypass on NH-19. The access-controlled six-lane road is expandable to eight lanes and forms part of Uttar Pradesh's wider expressway network through connections with other expressways and planned links.
Related Infrastructure Projects
Delhi–Varanasi High-Speed Rail
An 865 km high-speed rail corridor at 320 km/h forming the northern spine of India's Diamond Quadrilateral HSR network.
View Project →Lucknow–Kanpur Expressway
An advanced 63 km corridor (NE-6 / Awadh Expressway) slashing travel times between Lucknow and Kanpur to 45 minutes.
View Project →Varanasi–Howrah High-Speed Rail Corridor
A ~711 km high-speed rail corridor at 320 km/h forming the eastern leg of India's Diamond Quadrilateral HSR network.