Gorakhpur Link Expressway: Route Map, Toll Rates & Status (2026)

Last Updated: 10 November 2026
StatusFully Operational
Length91.35 km
Corridor StatusEntire Corridor Operational
CompletionOpened on 20 June 2025
Last Updated10 November 2026
The UPEIDA Gorakhpur Link Expressway is a 91.35 km 4-lane access-controlled highway. View the Gorakhpur Link Expressway Route Map, current Gorakhpur Link Expressway Status, official Gorakhpur Link Expressway Opening Date details (Opened 20 June 2025), toll plaza locations, and latest progress updates.

The Gorakhpur Link Expressway (constructed and operated by UPEIDA) is a 91.35 km four-lane access-controlled greenfield expressway in Uttar Pradesh. Officially Opened on 20 June 2025 by Chief Minister Yogi Adityanath, this vital high-speed link connects Jaitpur in Gorakhpur district directly with Salampur on the Purvanchal Expressway in Azamgarh district. Commuters tracking the Gorakhpur Link Expressway Route Map can view full alignment details, major river bridges, interchanges, and Toll Plaza locations along the route.

Traversing four key districts—Gorakhpur, Sant Kabir Nagar, Ambedkar Nagar, and Azamgarh—the ₹5,876 crore corridor built by UPEIDA significantly reduces travel time between Gorakhpur and Lucknow while connecting seamlessly into the Ganga Expressway network.

Project Summary

The Gorakhpur Link Expressway officially commenced operations following its inauguration by CM Yogi Adityanath on June 20, 2025. With the 91.35 km route now fully open, recent tenders for tolling, plaza operations, and safety patrol services confirm its transition into long-term operational management.

गोरखपुर लिंक एक्सप्रेसवे (Gorakhpur Link Expressway)

गोरखपुर लिंक एक्सप्रेसवे उत्तर प्रदेश में 91.35 किमी लंबा 4-लेन एक्सप्रेसवे है जो गोरखपुर को पूर्वांचल एक्सप्रेसवे से जोड़ता है।

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length91.35 km
Estimated Cost₹5,876 Crore
Implementing AgencyUPEIDA
Current StatusFully Operational
CompletionOpened on 20 June 2025
Route Map

Gorakhpur Link Expressway Route Map & Alignment

Track the Gorakhpur Link Expressway route map, latest status, opening date (20 June 2025), cost, toll plaza, package progress, and UPEIDA updates.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Gorakhpur Link Expressway Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameGorakhpur Link Expressway
Total Length91.35 km
Estimated Cost₹5,876.68 Crore
Current StatusFully Operational
Project Status Update: The 91.35 km Gorakhpur Link Expressway was inaugurated on 20 June 2025, connecting Jaitpur (Gorakhpur Bypass NH-27) directly to the Purvanchal Expressway at Salampur (Azamgarh).
Project Parameters & Technical Details

Gorakhpur Link ExpresswayCost • Route • Timeline

ParameterTechnical Details
Toll Plazas2 Mainline (Jaitpur, Salarpur) + 3 Ramp Plazas (Atrauliya/Tanda, Belghat, Sikariganj/Gola)
Project NameGorakhpur Link Expressway
Total Length91.35 km
Current StatusOperational with Active Expansion / Extensions
Estimated Cost₹5,876.68 Crore
Tolling SystemClosed Distance-Based (~₹2.15/km across 5 Plazas + 3 Gorakhpur Ramp Gates)
Districts CoveredGorakhpur, Sant Kabir Nagar, Ambedkar Nagar, Azamgarh (4 Districts)
Target CompletionOpened on 20 June 2025
Corridor End PointSalampur (Purvanchal Expressway Interchange, Azamgarh District)
Lane Configuration4 Lanes (Expandable to 6 Lanes)
Corridor Start PointJaitpur (NH-27 Gorakhpur Bypass, Gorakhpur District)
Construction Packages2 Packages (Package 1: APCO Infratech | Package 2: Dilip Buildcon)
Total Corridor Length91.35 km (4-Lane Access-Controlled, Expandable to 6-Lane)
Current Project StatusOperational / Final Stage
Implementing AuthorityUttar Pradesh Expressways Industrial Development Authority (UPEIDA)
Inauguration / Opening Date20 June 2025
Full-Length Toll (Jaitpur ↔ Salarpur)Single: ₹285 Car · ₹440 LCV · ₹840 Bus/Truck · ₹1,335 MAV | 24h Return: ₹455 Car · ₹705 LCV · ₹1,345 Bus/Truck · ₹2,135 MAV
Closed Distance-Based (~₹2.15/km) · 5 Operating Plazas · Single & 24h Return Rates

Gorakhpur Link Expressway Toll Plazas & Tariff Schedule

2026 Operational Tariff · UPEIDA
ℹ️ Verified Tolling System & Facility Audit

Because the Gorakhpur Link Expressway uses a closed distance-based toll system, there is no flat fee per plaza — drivers pay a variable rate of approximately ₹2.15 per kilometre for the exact distance travelled between their entry and exit points, and return journeys completed within 24 hours qualify for UPEIDA's standard ~25% return-trip discount (~1.6× single fare). Across the alignment, there are 2 mainline plazas (Jaitpur & Salarpur) and 3 main intermediate ramp plazas (Atrauliya / Tanda Cut, Belghat Cut, and Sikariganj / Gola Cut). Depending on travel direction near the Gorakhpur end, side-route traffic also passes dedicated automated ramp toll gates at Saraya Tiwari, Haranhi, and Dhebra.

5 Operating Toll Plazas (2 Mainline + 3 Intermediate Ramp Plazas)
5 Plazas · ~₹2.15/km Closed System
No.Toll Plaza NamePlaza Code / ChainageInterchange Details & Connectivity
1Jaitpur Mainline Toll Plaza (Gorakhpur Start)Mainline NorthNorthern entry/exit mainline plaza connecting to NH-27 Gorakhpur Bypass. Drivers near the Gorakhpur end via side routes also pass dedicated automated ramp toll gates at Saraya Tiwari (4 km), Haranhi (7 km), and Dhebra (12 km).
2Sikariganj / Gola Cut Ramp PlazaRamp Plaza #1Intermediate side-ramp plaza (17 km from Jaitpur / 74.35 km from Salarpur) for regional entry and exit.
3Belghat Cut Ramp PlazaRamp Plaza #2Intermediate ramp plaza serving the central alignment section (~40 km from Jaitpur / ~51 km from Salarpur).
4Atrauliya / Tanda Cut Ramp PlazaRamp Plaza #3Intermediate connector ramp linking the expressway to the Tanda / Atrauliya regional corridor (~64 km from Jaitpur / ~27 km from Salarpur).
5Salarpur Mainline Toll Plaza (Azamgarh End)Mainline SouthSouthern terminus mainline plaza where Gorakhpur Link Expressway merges directly into the Purvanchal Expressway (91.35 km).
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→
💳 Toll Payment Methods

Automated FASTag closed distance-based tolling (~₹2.15/km; ~25% discount on return trips within 24 hours) across Jaitpur & Salarpur mainline plazas, the 3 intermediate ramp plazas (Atrauliya / Tanda, Belghat, Sikariganj / Gola), and Gorakhpur-end automated ramp gates (Saraya Tiwari, Haranhi, Dhebra).

Districts & Packages Covered

Districts Covered by Gorakhpur Link Expressway

The 91.35 km corridor spans four districts in eastern Uttar Pradesh across 2 EPC packages.

Gorakhpur District (Jaitpur to Harnahi / Belghat)
Package 1 (0.00 to 48.317 km — APCO Infratech)

Starts at Jaitpur on NH-27 Gorakhpur Bypass; serves the GIDA industrial corridor.

Sant Kabir Nagar & Ambedkar Nagar
Package 1 & 2 Boundary (Kamhariya Ghat Bridge)

Features the major Ghaghara River bridge and interchange connectivity at Fulwariya.

Azamgarh District (Salampur Interchange)
Package 2 (48.317 to 91.352 km — Dilip Buildcon)

Terminates at a trumpet interchange on the Purvanchal Expressway at Salampur.

Corridor Alignment

Gorakhpur Link Expressway Route & Districts Covered

The Gorakhpur Link Expressway is a 91.35 km four-lane (expandable to six-lane) access-controlled greenfield expressway built by UPEIDA across eastern Uttar Pradesh. Originating at Jaitpur on the Gorakhpur Bypass (NH-27) in Gorakhpur district, it runs south through Sant Kabir Nagar and Ambedkar Nagar (crossing the Ghaghara/Saryu River at Kamhariya Ghat) before merging into the Purvanchal Expressway at Salampur in Azamgarh district.

Travel Time Impact

Gorakhpur to Lucknow Travel Time Reduction

Via the Gorakhpur Link Expressway and Purvanchal Expressway, commuters can travel between Gorakhpur and Lucknow in approximately 3.5 hours via a 100% access-controlled expressway route.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Gorakhpur Link Expressway is a fully access-controlled, four-lane greenfield expressway in Uttar Pradesh connecting Jaitpur on NH-27 in Gorakhpur district with the Purvanchal Expressway at Salarpur in Azamgarh district. The project is developed by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA).

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement