Advertisement // Sponsor
Verified PartnerPune Outer Ring Road Map 2026: Route, Villages & Latest Status
The Pune Ring Road is a marquee 128 km long, 8-lane access-controlled greenfield circular expressway encircling Pune and Pimpri-Chinchwad. Executed by MSRDC across Eastern and Western alignments, it links 8 major national and state highways to permanently decongest Pune city.
पुणे रिंग रोड (MSRDC 8-Lane Circular Expressway)
पुणे शहराभोवती १२८ किमी लांबीचा ८-पदरी ॲक्सेस-कंट्रोल्ड रिंग रोड एमएसआरडीसी मार्फत पूर्व आणि पश्चिम अशा दोन टप्प्यांत बांधला जात आहे. या प्रकल्पामुळे पुण्यात न येता महामार्गावरील वाहतूक बाहेरून वळवली जाईल.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Advertisement // Sponsor
Verified PartnerPune Outer Ring Road Map
Advertisement // Sponsor
Verified PartnerQuick Project Facts
| Parameter | Technical Details |
|---|---|
| Project Name | Pune Ring Road |
| Total Length | 128.0 km |
| Current Status | Under Construction / Execution |
| Estimated Cost | ₹25,000 Crores |
| Target Completion | June 2028 |
| Implementing Authority | NHAI / State Highway Authority |
Pune Outer Ring Road Route
The Pune Outer Ring Road is an engineering masterplan designed as an unbroken circular peripheral loop that encircles the entire Pune Metropolitan Region (PMR), keeping heavy freight, multi-axle trucks, and inter-district travelers entirely away from internal city roads like Chandni Chowk, Katraj Ghat, Hinjewadi, and Ahmednagar Road.
The alignment originates at Urse in Maval Taluka on the Mumbai-Pune Expressway, sweeping southward across Mulshi and Haveli talukas through the foothills of the Western Ghats before meeting the Pune-Bengaluru Highway (NH-48) near Kelawade in Bhor Taluka. From Kelawade, the eastern semicircle loops across Purandar, skirts the proposed New Pune International Airport zone, crosses the Pune-Solapur Highway (NH-65) at Theur, navigates past Wagholi and Alandi, connects the Chakan automobile belt in Khed Taluka on NH-60, and closes the circular loop back at Urse.
Urse (Maval)
Direct interchange with Mumbai-Pune Expressway & Old NH-48.
Kelawade (Bhor)
Connects NH-48 towards Satara, Kolhapur, and Bengaluru.
Theur / Purandar
Links Pune-Solapur Highway (NH-65) & planned Purandar Airport.
Khed / Chakan
Intersects Pune-Nashik Highway (NH-60) and Chakan MIDC hub.
Western Corridor
The Western Corridor of the Pune Outer Ring Road covers 65.45 km from Urse in Maval Taluka to Kelawade on NH-48 in Bhor Taluka. This section navigates the hilly, rugged terrain of the Sahyadri foothills across Mulshi and Haveli talukas, featuring major tunnels, deep cuts, and high viaducts to maintain access-controlled geometric speeds up to 120 km/h.
MSRDC packaged the Western Corridor into five distinct civil construction contracts (PRR-W1 to PRR-W5). Major infrastructure developers including Afcons Infrastructure Ltd., L&T Construction, and PNC Infratech Ltd. have been awarded packages to execute the civil carriageways, valley bridges, and tunnel portals.
Afcons Infrastructure Ltd.
Urse interchange to Shirgaon / Thakurgaon tunnel portal.
L&T Construction
Shirgaon to Paud / Mulshi valley viaduct section.
Afcons Infrastructure Ltd.
Mulshi section to Sinhagad / Haveli taluka hill pass.
PNC Infratech Ltd.
Haveli taluka corridor to Bhor boundary.
PNC Infratech Ltd.
Kelawade interchange node connecting NH-48 Pune-Bengaluru.
Eastern Corridor
The Eastern Corridor of the Pune Outer Ring Road covers 71.35 km, running through Urse / Khed taluka, circling east past Alandi, Wagholi, and Theur, and connecting south to Purandar and Kelawade. This half of the ring road intersects Maharashtra's most critical manufacturing hubs, linking the Chakan auto manufacturing belt, Bhosari MIDC, and the proposed New Pune International Airport at Purandar.
The Eastern Corridor is partitioned into seven packages (PRR-E1 to PRR-E7). Top infrastructure conglomerates including Dilip Buildcon Ltd. and Tata Projects were selected across the bidding rounds to carry out road construction, rail overbridges (ROBs), and multi-level interchanges.
Dilip Buildcon Ltd.
Urse to Khed taluka junction on NH-60.
Tata Projects
Khed to Alandi / Markal industrial corridor.
Tata Projects
Alandi to Wagholi bypass on SH-27.
Tata Projects
Wagholi bypass to Theur NH-65 interchange.
Tata Projects
Theur to Purandar northern junction.
Tata Projects
Purandar Airport access zone to Bhor taluka.
Tata Projects
Kelawade connection closing the eastern loop onto NH-48.
Interchanges & Connectivity
The Pune Outer Ring Road features grade-separated multi-level interchanges that eliminate stop-and-go signals, enabling rapid transition between interstate expressways and Maharashtra's regional logistics network.
Mumbai-Pune Expressway
Interchange at Urse. Provides direct high-speed diversion for commercial freight arriving from JNPT and Mumbai heading towards Karnataka and Tamil Nadu without entering Pune city.
NH-48 (Pune-Bengaluru)
Interchange at Kelawade / Khed Shivapur. Eliminates the infamous Katraj Ghat traffic chokepoints for south-bound transit towards Satara, Kolhapur, and Bengaluru.
NH-60 (Pune-Nashik Highway)
Interchange near Chakan / Khed. Seamlessly serves heavy auto-component and industrial logistics moving to and from the industrial clusters of Bhosari and Chakan.
NH-65 (Pune-Solapur Highway)
Interchange at Theur / Loni Kalbhor. Connects agricultural and cargo flows towards Solapur, Vijayapura, and Hyderabad.
SH-27 (Pune-Ahmednagar Road)
Interchange near Wagholi. Intercepts north-east Maharashtra traffic arriving from Sambhajinagar (Aurangabad) and Ahmednagar.
Purandar Airport Link
Dedicated high-speed expressway spur providing direct passenger, air-cargo, and logistics connectivity to the proposed New Pune International Airport at Purandar.
Current Construction Status
Over 85% of land across Maval, Mulshi, Haveli, and Purandar talukas has been acquired via direct compensation payouts under the ₹9,026 Crore land budget.
MSRDC secured syndicated project funding via HUDCO and Maharashtra state infrastructure allocations, fully ensuring liquidity for ongoing civil contracts.
Western Corridor priority stretches are targeted for opening by mid-2027, with the complete 136.8 km outer loop projected for 2028.
As of 2026, work across multiple Pune Ring Road packages is advancing through active civil works, geotechnical investigations, hill cutting, and utility shifting. Heavy machinery mobilization and casting yards have been established by appointed EPC contractors including Afcons, L&T, PNC Infratech, and Dilip Buildcon.
The state government has designated the Pune Outer Ring Road as a “Project of Vital Public Importance”, granting expedited forest clearances, statutory approvals, and dedicated district-level land acquisition monitoring teams to guarantee timely completion.
Advertisement // Sponsor
Verified PartnerLatest Updates
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions (FAQ)
Related Infrastructure Projects
Pune Bengaluru Expressway
A proposed ~700 km greenfield corridor linking Pune and Bengaluru to slash travel times.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Neral-Shirur Highway
A planned 65 km high-speed state highway alignment bypassing central Pune traffic routes.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
