Advertisement // Sponsor

Verified Partner
Loading sponsor...
CORRIDOR DOSSIER INDEX // PUNE-RING-ROAD

Pune Outer Ring Road Map 2026: Route, Villages & Latest Status

The Pune Ring Road is a marquee 128 km long, 8-lane access-controlled greenfield circular expressway encircling Pune and Pimpri-Chinchwad. Executed by MSRDC across Eastern and Western alignments, it links 8 major national and state highways to permanently decongest Pune city.

पुणे रिंग रोड (MSRDC 8-Lane Circular Expressway)

पुणे शहराभोवती १२८ किमी लांबीचा ८-पदरी ॲक्सेस-कंट्रोल्ड रिंग रोड एमएसआरडीसी मार्फत पूर्व आणि पश्चिम अशा दोन टप्प्यांत बांधला जात आहे. या प्रकल्पामुळे पुण्यात न येता महामार्गावरील वाहतूक बाहेरून वळवली जाईल.

Project Parameters AlignmentThe combined total length of the final access-controlled outer loop is 136.8 km (Western Corridor: ~65.45 km; Eastern Corridor: ~71.35 km), with total footprint expanding up to 173 km. Total sanctioned project cost stands at ₹36,433 Crores (including ₹9,026 Crores dedicated for direct land acquisition payouts).
FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length136.8 km
Estimated Cost₹36,433 Crores
Implementing AgencyMSRDC
Current StatusUnder Construction / Execution
Completion TargetJune 2028

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Primary Interactive Map

Pune Outer Ring Road Map

Interactive GIS Route • Western & Eastern Corridors
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Core Statistics & Specs

Quick Project Facts

MSRDC Access-Controlled Expressway
ParameterTechnical Details
Project NamePune Ring Road
Total Length128.0 km
Current StatusUnder Construction / Execution
Estimated Cost₹25,000 Crores
Target CompletionJune 2028
Implementing AuthorityNHAI / State Highway Authority
Alignment Trajectory

Pune Outer Ring Road Route

136.8 km Circular Outer Loop

The Pune Outer Ring Road is an engineering masterplan designed as an unbroken circular peripheral loop that encircles the entire Pune Metropolitan Region (PMR), keeping heavy freight, multi-axle trucks, and inter-district travelers entirely away from internal city roads like Chandni Chowk, Katraj Ghat, Hinjewadi, and Ahmednagar Road.

The alignment originates at Urse in Maval Taluka on the Mumbai-Pune Expressway, sweeping southward across Mulshi and Haveli talukas through the foothills of the Western Ghats before meeting the Pune-Bengaluru Highway (NH-48) near Kelawade in Bhor Taluka. From Kelawade, the eastern semicircle loops across Purandar, skirts the proposed New Pune International Airport zone, crosses the Pune-Solapur Highway (NH-65) at Theur, navigates past Wagholi and Alandi, connects the Chakan automobile belt in Khed Taluka on NH-60, and closes the circular loop back at Urse.

North-West Starting Node

Urse (Maval)

Direct interchange with Mumbai-Pune Expressway & Old NH-48.

South Gateway Node

Kelawade (Bhor)

Connects NH-48 towards Satara, Kolhapur, and Bengaluru.

South-East Cargo Node

Theur / Purandar

Links Pune-Solapur Highway (NH-65) & planned Purandar Airport.

North-East Industrial Node

Khed / Chakan

Intersects Pune-Nashik Highway (NH-60) and Chakan MIDC hub.

West Loop • 65.45 km

Western Corridor

5 Construction Packages (PRR-W1 to PRR-W5)

The Western Corridor of the Pune Outer Ring Road covers 65.45 km from Urse in Maval Taluka to Kelawade on NH-48 in Bhor Taluka. This section navigates the hilly, rugged terrain of the Sahyadri foothills across Mulshi and Haveli talukas, featuring major tunnels, deep cuts, and high viaducts to maintain access-controlled geometric speeds up to 120 km/h.

MSRDC packaged the Western Corridor into five distinct civil construction contracts (PRR-W1 to PRR-W5). Major infrastructure developers including Afcons Infrastructure Ltd., L&T Construction, and PNC Infratech Ltd. have been awarded packages to execute the civil carriageways, valley bridges, and tunnel portals.

PRR-W1Awarded

Afcons Infrastructure Ltd.

Urse interchange to Shirgaon / Thakurgaon tunnel portal.

PRR-W2Awarded

L&T Construction

Shirgaon to Paud / Mulshi valley viaduct section.

PRR-W3Awarded

Afcons Infrastructure Ltd.

Mulshi section to Sinhagad / Haveli taluka hill pass.

PRR-W4Awarded

PNC Infratech Ltd.

Haveli taluka corridor to Bhor boundary.

PRR-W5Awarded

PNC Infratech Ltd.

Kelawade interchange node connecting NH-48 Pune-Bengaluru.

East Loop • 71.35 km

Eastern Corridor

7 Construction Packages (PRR-E1 to PRR-E7)

The Eastern Corridor of the Pune Outer Ring Road covers 71.35 km, running through Urse / Khed taluka, circling east past Alandi, Wagholi, and Theur, and connecting south to Purandar and Kelawade. This half of the ring road intersects Maharashtra's most critical manufacturing hubs, linking the Chakan auto manufacturing belt, Bhosari MIDC, and the proposed New Pune International Airport at Purandar.

The Eastern Corridor is partitioned into seven packages (PRR-E1 to PRR-E7). Top infrastructure conglomerates including Dilip Buildcon Ltd. and Tata Projects were selected across the bidding rounds to carry out road construction, rail overbridges (ROBs), and multi-level interchanges.

PRR-E1

Dilip Buildcon Ltd.

Urse to Khed taluka junction on NH-60.

PRR-E2

Tata Projects

Khed to Alandi / Markal industrial corridor.

PRR-E3

Tata Projects

Alandi to Wagholi bypass on SH-27.

PRR-E4

Tata Projects

Wagholi bypass to Theur NH-65 interchange.

PRR-E5

Tata Projects

Theur to Purandar northern junction.

PRR-E6

Tata Projects

Purandar Airport access zone to Bhor taluka.

PRR-E7

Tata Projects

Kelawade connection closing the eastern loop onto NH-48.

Regional Highway Integration

Interchanges & Connectivity

Links 6 Major National Arteries

The Pune Outer Ring Road features grade-separated multi-level interchanges that eliminate stop-and-go signals, enabling rapid transition between interstate expressways and Maharashtra's regional logistics network.

Mumbai-Pune Expressway

Interchange at Urse. Provides direct high-speed diversion for commercial freight arriving from JNPT and Mumbai heading towards Karnataka and Tamil Nadu without entering Pune city.

NH-48 (Pune-Bengaluru)

Interchange at Kelawade / Khed Shivapur. Eliminates the infamous Katraj Ghat traffic chokepoints for south-bound transit towards Satara, Kolhapur, and Bengaluru.

NH-60 (Pune-Nashik Highway)

Interchange near Chakan / Khed. Seamlessly serves heavy auto-component and industrial logistics moving to and from the industrial clusters of Bhosari and Chakan.

NH-65 (Pune-Solapur Highway)

Interchange at Theur / Loni Kalbhor. Connects agricultural and cargo flows towards Solapur, Vijayapura, and Hyderabad.

SH-27 (Pune-Ahmednagar Road)

Interchange near Wagholi. Intercepts north-east Maharashtra traffic arriving from Sambhajinagar (Aurangabad) and Ahmednagar.

Purandar Airport Link

Dedicated high-speed expressway spur providing direct passenger, air-cargo, and logistics connectivity to the proposed New Pune International Airport at Purandar.

2026 Ground Reality

Current Construction Status

Active Ground Execution
Land Acquisition
> 85% Acquired

Over 85% of land across Maval, Mulshi, Haveli, and Purandar talukas has been acquired via direct compensation payouts under the ₹9,026 Crore land budget.

Syndicated Financing
₹10,500+ Cr Sanctioned

MSRDC secured syndicated project funding via HUDCO and Maharashtra state infrastructure allocations, fully ensuring liquidity for ongoing civil contracts.

Targeted Commercial Opening
2027 / 2028 (Phased)

Western Corridor priority stretches are targeted for opening by mid-2027, with the complete 136.8 km outer loop projected for 2028.

As of 2026, work across multiple Pune Ring Road packages is advancing through active civil works, geotechnical investigations, hill cutting, and utility shifting. Heavy machinery mobilization and casting yards have been established by appointed EPC contractors including Afcons, L&T, PNC Infratech, and Dilip Buildcon.

The state government has designated the Pune Outer Ring Road as a “Project of Vital Public Importance”, granting expedited forest clearances, statutory approvals, and dedicated district-level land acquisition monitoring teams to guarantee timely completion.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Updates

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Q&A

Frequently Asked Questions (FAQ)

The Pune Ring Road is a large access-controlled ring-road project being developed by the Maharashtra State Road Development Corporation (MSRDC). The approved MSRDC corridor is about 173.72 km long and is divided into eastern and western projects designed to provide an outer bypass around Pune and Pimpri-Chinchwad.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement