Verified PartnerDurgapur Expressway (NH‑19) Route Map, Toll Rates, Status & Latest Updates (2026)
The Durgapur Expressway is a 65 km access-controlled 4-to-6 lane arterial toll expressway on NH-19 (Golden Quadrilateral) connecting Dankuni near Kolkata with Palsit near Burdwan in West Bengal. Serving as the primary industrial corridor linking the Kolkata metropolitan area with the Asansol–Durgapur industrial belt and northern India, it bypasses congested suburban towns along the old Grand Trunk Road.
The Panagarh–Palsit six-laning project has received its Completion Certificate. The Palsit–Dankuni four-to-six-laning project received COD for 61.3 km of its 63.83 km length on 14 July 2025. The entire corridor is traffic-operational, but the available records do not establish that all 131.58 km of the planned upgrading works have received completion certification.
দুর্গাপুর এক্সপ্রেসওয়ে / Durgapur Expressway (NH-19)
দুর্গাপুর এক্সপ্রেসওয়ে ডানকুনি থেকে পালসিট পর্যন্ত বিস্তৃত ৬৫ কিমি দীর্ঘ দ্রুতগতির মহাসড়ক, যা কলকাতা ও দুর্গাপুর শিল্পাঞ্চলের প্রধান জীবনরেখা।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Durgapur Expressway (NH-19) Route Map & Alignment
View and download the latest Durgapur Expressway (NH-19) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerDurgapur Expressway (NH-19)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Toll Plazas | Palsit Toll Plaza (km 585.692) & Dankuni Toll Plaza (km 646.005) |
| Travel Time | Travel time between Panagarh and Dankuni varies with traffic, roadworks, weather and local congestion. Drivers should check live navigation before travelling. |
| Project Name | Durgapur Expressway (NH-19) |
| Total Length | 131.58 km (Panagarh–Palsit 67.75 km + Palsit–Dankuni 63.83 km = 131.58 km) |
| Current Status | Fully Operational |
| Estimated Cost | Combined Government-reported capital cost (July 2024): ₹4,266 crore |
| States Covered | West Bengal |
| Total Packages | 2 major project packages |
| Concessionaires | Panagarh Palsit Road Limited (Adani Road Transport) & Palsit Dankuni Tollway Pvt Ltd (IRB Infrastructure Trust) |
| Major Districts | Paschim Bardhaman, Purba Bardhaman, Hooghly |
| Inauguration Date | 14 July 2025 |
| Target Completion | 14 July 2025 |
| Lane Configuration | Panagarh–Palsit: six-laning (67.75 km); Palsit–Dankuni: four-to-six-laning (63.83 km) |
| Concession Packages | 2 BOT Concession Packages (Panagarh–Palsit: 67.75 km | Palsit–Dankuni: 63.83 km) |
| Implementing Agency | National Highways Authority of India (NHAI) |
| Package configuration | Panagarh–Palsit is six-laning (67.75 km); Palsit–Dankuni is four-to-six-laning (63.83 km) |
| Implementing Authority | NHAI |
| Commercial Operation Milestones | Panagarh–Palsit received Completion Certificate (April 2025 register); Palsit–Dankuni received COD for 61.3 km on 14 July 2025 |
Published FASTag Toll Rates – Dankuni & Palsit Toll Plazas (FY 2026–27)
The Durgapur Expressway corridor has two separately tolled fee plazas: Palsit Toll Plaza on the Panagarh–Palsit section and Dankuni Toll Plaza on the Palsit–Dankuni section. The published FY 2026–27 tariff listings are effective from 1 April 2026 to 31 March 2027. Each plaza has its own vehicle-wise toll schedule and monthly pass rates. Eligible local non-commercial vehicle owners may qualify for a separate local pass, subject to the applicable NHAI conditions. These are plaza-specific toll charges, not a single corridor-wide toll.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Palsit Toll Plaza | km 585.692 | Active toll collection facility for the Panagarh–Palsit section. |
| 2 | Dankuni Toll Plaza | km 646.005 | Active toll collection plaza for the Palsit–Dankuni section. |
| 3 | Dankuni Terminal Interchange | km 652.700 | Eastern terminal connecting into Kolkata metropolitan gateway, Belghoria Expressway, and NH-16. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Major Locations & Alignment Points
Key locations and infrastructure points along the 131.58 km Durgapur Expressway (NH-19):
- Panagarh Package Start (km 521.120): Western start of the six-laning package, connecting towards the Durgapur–Asansol industrial region.
- Budbud: Commercial junction and industrial connection in Purba Bardhaman.
- Galsi: Interchange connection serving local agricultural and industrial transit.
- Bardhaman (Burdwan): Major urban district headquarters with bypass grade separators.
- Palsit Toll Plaza (km 585.692): Active toll collection facility for the Panagarh–Palsit section.
- Palsit Package Boundary (km 588.870): Project boundary between the Panagarh–Palsit and Palsit–Dankuni six-laning packages. This is separate from the Palsit Toll Plaza location at km 585.692.
- Memari: Key sub-divisional commercial town junction along NH-19.
- Gurap: Connecting junction to State Highway 13 and regional distributor roads.
- Singur: Prominent agricultural and industrial junction in Hooghly district.
- Dankuni Toll Plaza (km 646.005): Active toll collection plaza for the Palsit–Dankuni section.
- Dankuni Terminal Interchange (km 652.700): Eastern terminal connecting into Kolkata metropolitan gateway, Belghoria Expressway, and NH-16.
Districts & Major Locations Along NH-19
Connecting western industrial zones with the Kolkata metropolitan area across three key districts:
Corridor start at Panagarh (km 521.120) linking to Durgapur and Asansol industrial corridor.
Traverses Budbud, Galsi, Bardhaman, Palsit Toll Plaza (km 585.692), and Memari.
Covers Gurap, Singur, Dankuni Toll Plaza (km 646.005), and terminates at Dankuni gateway.
Route Alignment & Scope
The Durgapur Expressway (NH-19) is a 131.58 km brownfield six-laning improvement spanning two packages: Panagarh to Palsit (67.75 km, design chainage km 521.120 to km 588.870) and Palsit to Dankuni (63.83 km, design chainage km 588.870 to km 652.700). The corridor provides the primary freight and commuter expressway arterial between Kolkata and the western industrial centres of Durgapur and Asansol.
Travel Time
Travel time between Panagarh and Dankuni varies with traffic, roadworks, weather and local congestion. Although the six-laning works are intended to improve traffic flow along NH-19, actual journey times depend on prevailing road conditions. Drivers should check live navigation information before travelling.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Durgapur Expressway is the commonly used name for the upgraded National Highway 19 (NH-19) corridor between Panagarh and Dankuni in West Bengal. It is a brownfield highway-upgradation project comprising two major packages: Panagarh–Palsit and Palsit–Dankuni.
The Durgapur Expressway corridor is approximately 131.58 km long, connecting Panagarh in Paschim Bardhaman district with Dankuni in Hooghly district. It consists of the 67.75 km Panagarh–Palsit package and the 63.83 km Palsit–Dankuni package.
No. The Durgapur Expressway is a brownfield highway-upgradation project along the existing NH-19 alignment, formerly known as NH-2. The project involves widening and upgrading the existing highway rather than constructing an entirely new greenfield expressway.
The Panagarh–Palsit six-laning project has received its Completion Certificate. The Palsit–Dankuni four-to-six-laning project received COD for 61.3 km of its 63.83 km length on 14 July 2025. The entire corridor is traffic-operational, but the available records do not establish that all 131.58 km of the planned upgrading works have received completion certification.
The 67.75 km Panagarh–Palsit six-laning package achieved Provisional Commercial Operation Date (PCOD) on 27 September 2024, marking a major operational milestone for this section of NH-19.
The July 2024 Lok Sabha reply reports capital costs of ₹2,112 crore for Panagarh–Palsit and ₹2,154 crore for Palsit–Dankuni, giving a combined Government-reported capital cost of ₹4,266 crore. A February 2025 parliamentary status statement separately reports TPC figures of ₹2,020.93 crore and ₹2,193.23 crore, while IRB reports ₹2,403 crore for Palsit–Dankuni. These are different financial reporting measures and not final audited project expenditure.
The Durgapur Expressway passes through three districts in West Bengal: Paschim Bardhaman, Purba Bardhaman and Hooghly. It connects locations including Panagarh, Durgapur's surrounding industrial region, Bardhaman, Palsit, Memari, Gurap, Singur and Dankuni.
The published FY 2026–27 car toll rates are ₹110 for a single journey at Dankuni Toll Plaza and ₹110 at Palsit Toll Plaza. The listed return charges within 24 hours are ₹165 at Dankuni and ₹170 at Palsit. Toll rates vary by vehicle category, and each plaza has a separate tariff.
Palsit Toll Plaza is located at approximately km 585.692 in Purba Bardhaman district, near Palsit. Dankuni Toll Plaza is located at approximately km 646.005 in Hooghly district, near Dankuni. Both are operational toll facilities along the NH-19 corridor.
The published FY 2026–27 tariff listings show a ₹360 local monthly pass for eligible cars, jeeps and vans at both Palsit and Dankuni toll plazas. Eligibility is subject to applicable local-resident conditions, distance requirements and valid FASTag rules. Residents should confirm eligibility and issuance details with the relevant toll plaza.
The Panagarh–Palsit section is a 67.75 km six-laning package extending from Panagarh to Palsit. The Palsit–Dankuni section is a separate 63.83 km package extending eastward from Palsit to Dankuni. Both form part of the wider 131.58 km Durgapur Expressway corridor but have separate concession arrangements and completion milestones.
Yes. National Highway 19 (NH-19) is the renumbered highway designation for the route historically known as National Highway 2 (NH-2). Older project documents and maps may therefore refer to the Durgapur Expressway corridor as part of NH-2.
The Durgapur Expressway forms part of the NH-19 road corridor connecting the Panagarh and Dankuni areas in West Bengal. From Dankuni, motorists can continue towards the Kolkata metropolitan region through the connecting highway network. The project itself does not extend all the way into central Kolkata.
The corridor has two main toll facilities identified for its two concession packages: Palsit Toll Plaza at approximately km 585.692 on the Panagarh–Palsit section and Dankuni Toll Plaza at approximately km 646.005 on the Palsit–Dankuni section. Each plaza collects toll according to its own vehicle-wise tariff.
Travel time between Panagarh and Dankuni depends on traffic, road conditions, weather, local congestion and ongoing maintenance. The upgraded NH-19 corridor is designed to improve traffic flow through six-laning and highway improvements, but motorists should check live navigation services for an up-to-date journey estimate.
Related Infrastructure Projects
Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Delhi–Gurgaon Expressway
A 27.7 km 8/6-lane access-controlled expressway corridor along NH-48 linking New Delhi to Gurugram and IGI Airport with major grade separators and the Kherki Daula toll plaza.
View Project →Trans-Haryana Expressway (NH-152D)
A 227.020 km six-lane access-controlled greenfield highway (NH-152D) linking Gangheri near Ismailabad with the Narnaul Bypass across 8 districts and 16 fee plazas under Bharatmala Pariyojana.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.