Verified PartnerSix-Lane Elevated Kona Expressway (NH‑117) Route Map, Status & Latest Updates (2026)
The Six-Lane Elevated Kona Expressway (National Highway 117) is an upcoming 7.2 km elevated corridor project undertaken by NHAI in Howrah, West Bengal. Designed to replace the congested surface Kona Expressway connecting the Vidyasagar Setu (Second Hooghly Bridge) with NH-16 (old NH-6) at Nibra, the elevated viaduct will resolve one of eastern India's worst urban freight bottlenecks.
The Six-Lane Elevated Kona Expressway is a 7.192 km elevated highway project on NH-117 in Howrah, West Bengal, extending from km 0.145 near Football Gate to km 7.337 at Nibra, where the corridor connects with NH-16. The National Highways Authority of India (NHAI) is the implementing agency, and Rail Vikas Nigam Limited (RVNL) is executing the construction under the EPC model. The original project cost recorded in a Lok Sabha project-status document was ₹1,212.56 crore, while the EPC contract awarded to RVNL was valued at ₹720.67 crore. In October 2026, NHAI officials reported that the revised project cost had increased to approximately ₹1,300 crore following changes in project scope. The project includes a six-lane elevated viaduct, six directional ramp connections and associated widening and junction works. At Santragachhi Railway Station, a three-tier traffic arrangement is being developed, comprising the existing widened road and two flyover levels. As of 16 October 2026, approximately 40% of construction was reported complete, with foundations laid for 175 of 221 planned piers. The revised completion target is December 2027.
কোনা এক্সপ্রেসওয়ে / Kona Expressway (NH-117)
কোনা এক্সপ্রেসওয়ে হাওড়া ও কলকাতার সংযোগকারী বিদ্যাসাগর সেতুর সাথে জাতীয় সড়ক ১৬-কে যুক্ত করার জন্য নির্মিত একটি অত্যন্ত গুরুত্বপূর্ণ ৭.২ কিমি উন্নত এলিভেটেড এক্সপ্রেসওয়ে।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Six-Lane Elevated Kona Expressway (NH-117) Route Map & Alignment
View and download the latest Six-Lane Elevated Kona Expressway (NH-117) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerSix-Lane Elevated Kona Expressway (NH-117)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| lanes | 6 Lanes (Elevated Corridor) |
| model | Engineering, Procurement, and Construction (EPC) |
| ramps | [object Object],[object Object],[object Object],[object Object],[object Object],[object Object] |
| origin | Football Gate (near Nabanna, Shibpur) |
| status | Under construction. NHAI reported approximately 40% progress as of 16 October 2026, with foundations laid for 175 of the 221 planned piers. The revised completion target is December 2027. |
| chainage | km 0.145 to km 7.337 |
| length_km | 7.192 |
| contractor | Rail Vikas Nigam Limited (RVNL) |
| destination | Nibra (Junction with NH-16 / Kolkata–Delhi Highway) |
| Project Name | Six-Lane Elevated Kona Expressway (NH-117) |
| Total Length | 7.192 km |
| configuration | Six-lane elevated viaduct over existing four-lane surface corridor |
| piers_planned | 221 |
| progress_date | 16 October 2026 |
| Current Status | Under Construction / Execution |
| Estimated Cost | ₹1,300 Crore |
| Total Packages | 1 EPC Project Package (Under Construction) |
| estimated_cost | Approximately ₹1,300 crore (Revised project cost, reported October 2026) |
| progress_percent | 40 |
| Inauguration Date | December 2027 |
| Target Completion | December 2027 |
| completion_target | December 2027 |
| districts_covered | Howrah |
| highway_designation | National Highway 117 (NH-117) |
| implementing_agency | National Highways Authority of India (NHAI) |
| open_sections_label | Existing road: operational; elevated corridor: under construction |
| Implementing Authority | NHAI |
| three_tier_santragachhi | [object Object] |
| parliamentary_record_cost | ₹1,212.56 crore |
| pier_foundations_completed | 175 |
| original_epc_contract_award | ₹720.67 crore (Awarded to RVNL in March/April 2023) |
Six Directional Ramp Connections Along the Elevated Corridor
The elevated corridor features six directional ramp connections (three towards NH-16 and three towards Vidyasagar Setu) rather than individual highway interchanges:
| Direction | Ramp Location | Function |
|---|---|---|
| Towards NH-16 | Carry Road up-ramp | Allows traffic from the Carry Road side to enter the elevated corridor towards NH-16. |
| Towards NH-16 | Santragachhi down-ramp | Allows traffic to exit near Santragachhi Railway Station. |
| Towards NH-16 | Nibra down-ramp | Connects the elevated corridor to NH-16 at Nibra. |
| Towards Vidyasagar Setu | Nibra up-ramp | Allows traffic from NH-16 to enter the elevated corridor towards Kolkata. |
| Towards Vidyasagar Setu | Khejurtala truck-terminal up-ramp | Provides access from the truck-terminal side to the elevated corridor. |
| Towards Vidyasagar Setu | Belepole down-ramp | Allows traffic to exit towards Belepole and the adjoining Howrah urban area. |
Important: These are six ramp connections, not six interchanges.
Districts & Major Locations Along the Corridor
The entire 7.192 km elevated Kona Expressway project is located in Howrah district, West Bengal.
Football Gate (near Nabanna), Carry Road, Santragachhi Railway Station, Khejurtala, Belepole, and Nibra (NH-16 junction)
Route Alignment & Highway Scope
The Six-Lane Elevated Kona Expressway runs for 7.192 km along NH-117 in Howrah district, from Football Gate near Nabanna (km 0.145) to Nibra (km 7.337), where Kona Expressway connects with NH-16. The project involves constructing a new six-lane elevated corridor above the existing Kona Expressway, alongside surface-road widening and junction improvements. A key component is the three-tier traffic arrangement at Santragachhi Railway Station. This comprises the existing widened road, a lower flyover of approximately 150 metres intended for local traffic and buses, and an upper flyover designed for heavy vehicles and longer-distance traffic. Six directional ramps are planned to connect the elevated corridor with the Carry Road, Santragachhi, Nibra, Khejurtala and Belepole areas.
Travel Advisory & Corridor Movement
The elevated Kona Expressway is being developed to provide a faster, grade-separated route between the Football Gate area and Nibra, where Kona Expressway meets NH-16. It is intended to reduce congestion along the existing surface road, particularly around Santragachhi Railway Station. Until the elevated corridor is commissioned, motorists must continue to use the existing road network and follow temporary traffic diversions and construction-related restrictions. Actual journey-time savings will depend on the completed ramps, junction connections and traffic conditions after opening.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Six-Lane Elevated Kona Expressway is a 7.192 km elevated highway project on NH-117 in Howrah, West Bengal. It is being developed to improve connectivity between Football Gate near Nabanna and Nibra, where Kona Expressway connects with NH-16.
The Kona Elevated Expressway project is 7.192 km long, extending from chainage km 0.145 near Football Gate to km 7.337 at Nibra on NH-117.
The new elevated corridor will have six lanes. The project also includes associated surface-road widening, directional ramps and junction improvements along the existing Kona Expressway.
The elevated corridor starts near Football Gate, close to Nabanna in Howrah, at km 0.145. It extends to Nibra at km 7.337, where the Kona Expressway connects with NH-16.
The revised project cost was reported at approximately ₹1,300 crore in October 2026. The original project cost recorded in parliamentary documents was ₹1,212.56 crore, while the separate EPC construction contract awarded to RVNL was valued at ₹720.67 crore.
The National Highways Authority of India (NHAI) is the implementing agency, while Rail Vikas Nigam Limited (RVNL) is executing the construction under the Engineering, Procurement and Construction (EPC) model.
No. The new six-lane elevated corridor is under construction. The existing surface Kona Expressway remains operational, and motorists must continue using the existing road network until the elevated facility is completed and opened.
As of 16 October 2026, NHAI officials reported approximately 40% construction progress. Foundations had been completed for 175 of the planned 221 piers, and road widening along the approximately 1 km Football Gate–Betor stretch had been completed.
The revised completion target for the Six-Lane Elevated Kona Expressway is December 2027, according to the progress update reported in October 2026. The date is a target and may change depending on construction progress.
Yes. The elevated corridor reaches Nibra, where the Kona Expressway connects with NH-16. This connection is intended to improve access between Howrah, Kolkata-bound traffic and the wider national highway network.
The six planned directional ramp connections are the Carry Road up-ramp, Santragachhi down-ramp, Nibra down-ramp, Nibra up-ramp, Khejurtala truck-terminal up-ramp and Belepole down-ramp. They provide access towards NH-16, Vidyasagar Setu and adjoining Howrah areas.
The Santragachhi Railway Station section is designed with three traffic levels: the existing widened road, a lower flyover of approximately 150 metres intended for local traffic and buses, and an upper flyover designed for heavy vehicles and longer-distance highway traffic. The arrangement aims to reduce congestion and separate different traffic movements.
No separate operational toll tariff for the new Kona Elevated Expressway has been identified in the project information supplied. The elevated corridor is still under construction. Toll charges at nearby facilities such as Vidyasagar Setu are separate and should not be presented as Kona Expressway toll rates.
The project runs through Howrah district and serves Football Gate near Nabanna, Carry Road, Santragachhi Railway Station, Khejurtala, Belepole and Nibra. Its six directional ramps are intended to connect the elevated corridor with these surrounding areas.
The six-lane elevated corridor is intended to reduce congestion on the existing Kona Expressway, particularly around Santragachhi Railway Station. Its effectiveness will depend on the completed ramps, junction connections, traffic management and operating conditions after commissioning.
Related Infrastructure Projects
Durgapur Expressway (NH-19)
An approximately 131.58 km arterial highway upgrade corridor on NH-19 across Paschim Bardhaman, Purba Bardhaman, and Hooghly comprising Panagarh–Palsit six-laning (67.75 km) and Palsit–Dankuni four-to-six-laning (63.83 km).
View Project →Delhi–Panipat Expressway (NH-44)
An approximately 70.7 km eight-lane highway upgrade on NH-44 connecting Mukarba Chowk to Panipat, connecting with the separate 10 km six-lane Panipat Elevated Highway.
View Project →Delhi–Meerut Expressway (NE-3)
An approximately 82 km access-controlled expressway corridor (NE-3) connecting Sarai Kale Khan / Nizamuddin in Delhi to Partapur in Meerut via Dasna, featuring 14 lanes on the first 28 km alongside NH-24 and 6 lanes to Meerut.