METRO CORRIDOR DOSSIER // MUMBAI-METRO-LINE-11

Mumbai Metro Line 11 (Wadala - CSMT) Route Map, Stations & Status

Approved / Pre-Construction📏 17.50 km🚉 14 Stations🗓 Approved Corridor – Pre-construction🏢 Agency: MMRCL (Mumbai Metro Rail Corporation Ltd.) | Operator: To be finalized (expected: MMRCL)

Mumbai Metro Line 11 (Green Line Extension / Metro Line 11 Mumbai / Wadala CSMT Metro / Wadala Gateway Metro / South Mumbai Metro) is an approved 17.5 km 100% underground rapid transit corridor connecting Wadala Depot to Gateway of India via CSMT, Mumbai Port Authority (MbPA) redevelopment lands, Sewri, Darukhana, and South Mumbai heritage precincts. Implemented by Mumbai Metro Rail Corporation Limited (MMRCL) in coordination with MMRDA and Government of Maharashtra at an approved project estimate of ₹23,487 Crores (supported by Government of Maharashtra, Government of India, and JICA loan assistance), Line 11 features 14 proposed underground stations. A future extension toward Bandra Terminus via Dharavi has been proposed. Track Metro Line 11 Route, Metro Line 11 Stations, Wadala CSMT Metro progress, Gateway of India Metro status, Metro Line 11 Latest Update, and Metro Line 11 Completion Date.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Mumbai Metro Line 11 (Wadala - CSMT) Economics

Mumbai Metro Line 11 (Wadala - CSMT) Economics

Total Investment₹23,487 Crores (Approved Project Estimate)
Primary BackersGovernment of Maharashtra, Government of India & JICA Loan Assistance
Operator / ModelPublic Transit Board (MMRCL)
Target Opening

Expected Completion Date

StatusApproved / Pre-Construction
Target Opening DateApproved Corridor – Pre-construction
Station list

Mumbai Metro Line 11 (Wadala - CSMT) Stations

#StationTypeInterchange / ConnectionOpened
01
Wadala Depot
Underground TerminalLine 4 (Green Line) & Wadala MonorailProposed
02
CGS Colony / Anik Nagar
UndergroundCGS Colony Transit NodeProposed
03
Gowari Transit Camp
UndergroundGowari Transit Camp FeederProposed
04
Sewri
UndergroundSewri Railway Station (Harbour Line) & MbPA LandsProposed
05
Hay Bunder
UndergroundHay Bunder Waterfront PrecinctProposed
06
Coal Bunder
UndergroundCoal Bunder Maritime PrecinctProposed
07
Darukhana
UndergroundDarukhana Commercial NodeProposed
08
Wadi Bunder
UndergroundWadi Bunder Rail Yard NodeProposed
09
Clock Tower
UndergroundClock Tower PrecinctProposed
10
Carnac Bunder
UndergroundCarnac Bunder Logistics PrecinctProposed
11
CSMT
Underground InterchangeLine 3 (Aqua Line), Central Railway & Suburban RailwayProposed
12
Horniman Circle
UndergroundFort Business DistrictProposed
13
SP Mukherjee Chowk
UndergroundRegal / Colaba Commercial NodeProposed
14
Gateway of India
Underground TerminalGateway of India Ferry & South Mumbai Tourism PrecinctProposed
Geospatial Alignment

Mumbai Metro Line 11 (Wadala - CSMT) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Mumbai Metro Line 11 (Wadala - CSMT) Technical Specifications

ParameterValue
Estimated Cost₹8,739 Crore
Corridor Type100% Underground
Primary DepotProposed Depot (subject to final DPR)
Track GaugeStandard Gauge (1435 mm)
Implementing AgencyMMRCL (Mumbai Metro Rail Corporation Ltd.)
Total Length17.50 km
Opened / Est. OpeningApproved Corridor – Pre-construction
Corridor StatusApproved / Pre-Construction
Maximum Design Speed80 km/h
OperatorTo be finalized (expected: MMRCL)
Stations Count14
Line Number11 (Green Line Southern Extension)
Electrification System25kV AC overhead catenary (OHE)
Chronological Milestones

Mumbai Metro Line 11 (Wadala - CSMT) Timeline

2025

Maharashtra Government approved revised Metro Line 11 alignment to Gateway of India.

2025

Interim consultant and DPR activities initiated for the 17.5 km underground alignment.

2026

JICA loan approved; consultancy and civil tenders being prepared by MMRCL.

Proprietary analytics

Mumbai Metro Line 11 (Wadala - CSMT) Economic & Connectivity Impact

Economic Significance

Unlocks mass rapid transit connectivity for South Mumbai and the 300-hectare MbPA Eastern Waterfront project, with an approved estimate of ₹23,487 Crores supported by Government of Maharashtra, Government of India and JICA loan assistance.

Traffic Impact

Expected to relieve congestion on Eastern Freeway, P D'Mello Road, and Shahid Bhagat Singh Road by providing a high-capacity direct underground link between Wadala and Gateway of India.

Employment Centres Served

Directly connects South Mumbai's financial district (Fort/CSMT/Colaba) with growing commercial clusters in Wadala, Sewri, and Central Mumbai.

Intermodal Connectivity

Establishes a continuous Green Line rapid transit trunk from Kasarvadavali/Thane (via Line 4/4A) straight to Gateway of India in South Mumbai.

Impact on Real Estate

Catalyzing massive commercial, residential, and hospitality redevelopment along the MbPA Eastern Waterfront precinct and South Mumbai heritage zone.

Geospatial Explorer

Mumbai Metro Line 11 (Wadala - CSMT) Alignment Map & GIS Explorer

Elevated / UndergroundUnderground: 17.50 km | Elevated: 0 km
Viaduct Length0 km
Tunnel Length17.50 km
River CrossingsNone (Sub-surface tunneling beneath coastal port zones)
Major Bridges / CrossingsUnderground tunnel spans beneath Eastern Freeway and Railway tracks
Primary DepotProposed Depot (subject to final DPR)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

Mumbai Metro Line 11 is a planned metro corridor connecting Anik Depot/Wadala with the Gateway of India in South Mumbai. The currently approved corridor is about 17.5 km long and is being implemented by Mumbai Metro Rail Corporation Limited (MMRCL).

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement