Advertisement // Sponsor
Verified PartnerMumbai Metro Line 7 (Dahisar East - Andheri East) Route Map, Stations & Status
Mumbai Metro Line 7 (Red Line / Metro Line 7 Mumbai / WEH Metro) is a 16.50 km fully operational elevated rapid transit corridor running along the Western Express Highway (WEH) connecting Dahisar East to Andheri East (Gundavali). Implemented by MMRDA and operated by MMMOCL, Line 7 features 14 elevated stations and major interchanges with Line 1, Line 2A, Line 6, Line 9, and Western Railway. Track Metro 7 Mumbai Route, Metro 7 Stations, Metro Line 7 Route Map, and Dahisar to Andheri Metro timings.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Mumbai Metro Line 7 (Dahisar East - Andheri East) Economics
Mumbai Metro Line 7 (Dahisar East - Andheri East) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Dahisar (East) | Terminal / Interchange | Line 2A (Yellow Line) & Line 9 | 02 April 2022 |
| 02 | Ovaripada | Regular | Dahisar East Feeder | 02 April 2022 |
| 03 | National Park (Borivali) | Regular | Sanjay Gandhi National Park Gate | 02 April 2022 |
| 04 | Devipada | Regular | Borivali East Feeder | 02 April 2022 |
| 05 | Magathane | Regular | Magathane Bus Terminal | 02 April 2022 |
| 06 | Poisar | Regular | Kandivali East Feeder | 02 April 2022 |
| 07 | Akurli | Regular | Akurli Road Commercial Node | 02 April 2022 |
| 08 | Kurar | Regular | Malad East Commercial Node | 02 April 2022 |
| 09 | Dindoshi | Regular | Goregaon East Commercial | 02 April 2022 |
| 10 | Aarey | Regular / Terminal Phase 1 | Aarey Colony Feeder | 02 April 2022 |
| 11 | Goregaon (East) | Interchange | Western Railway (Goregaon Station) | 19 January 2023 |
| 12 | Jogeshwari (East) | Interchange | Line 6 (Pink Line) | 19 January 2023 |
| 13 | Mogra | Regular | Andheri East Commercial Node | 19 January 2023 |
| 14 | Gundavali | Terminal / Interchange | Line 1 (Blue Line via Skywalk to WEH) & Western Railway | 19 January 2023 |
Mumbai Metro Line 7 (Dahisar East - Andheri East) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerMumbai Metro Line 7 (Dahisar East - Andheri East) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹6,208 Crore |
| Corridor Type | Fully Elevated |
| Primary Depot | Charkop Depot (16 Hectares, shared with Line 2A) |
| Track Gauge | Standard Gauge (1435 mm) |
| Implementing Agency | MMRDA |
| Total Length | 16.50 km |
| Opened / Est. Opening | 19 January 2023 (Phase 1 opened 2 April 2022) |
| Corridor Status | Fully Operational |
| Maximum Design Speed | 80 km/h |
| Operator | MMMOCL |
| Stations Count | 14 |
| Line Number | 7 (Red Line) |
| Electrification System | 25kV AC overhead catenary (OHE) |
Mumbai Metro Line 7 (Dahisar East - Andheri East) Timeline
Foundation stone laid by Prime Minister Narendra Modi.
Civil construction commences along Western Express Highway (WEH).
Phase 1 (Dahisar East to Aarey - 9.75 km) opened for commercial operations.
Phase 2 (Aarey to Gundavali - 6.75 km) inaugurated by PM Narendra Modi; full 16.50 km corridor operational.
Mumbai Metro Line 7 (Dahisar East - Andheri East) Economic & Connectivity Impact
Economic Significance
Diverts massive commuter volumes from overloaded Western Express Highway and Western Railway local trains.
Traffic Impact
Reduces road travel time between Dahisar and Andheri East along WEH by over 50% during peak commute hours.
Employment Centres Served
Connects dense residential suburbs in North Mumbai directly with MIDC Andheri, SEEPZ, and Goregaon commercial district.
Intermodal Connectivity
Direct skywalk integration at Gundavali with Line 1 (WEH Station), Line 6 at Jogeshwari (East), and seamless transfer to Line 2A at Dahisar East.
Impact on Real Estate
Spurred transit-oriented redevelopment and premium commercial office demand along the WEH corridor.
Mumbai Metro Line 7 (Dahisar East - Andheri East) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
