Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // MUMBAI-METRO-LINE-3

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Route Map, Stations & Status

Partially Operational📏 33.5 km🚉 27 Stations🗓 Phase 1 Operational🏢 Mumbai Metro Rail Corporation Limited (MMRC)

Mumbai Metro Line 3 (Aqua Line / Colaba Bandra SEEPZ Metro / Colaba SEEPZ Metro) is Mumbai's premier 33.5 km Mumbai Underground Metro corridor connecting Cuffe Parade in South Mumbai to Aarey JVLR in the Northern Suburbs via Nariman Point, CSMT, Worli, Dadar, Bandra-Kurla Complex (BKC), MIDC SEEPZ, and Chhatrapati Shivaji Maharaj International Airport (CSMIA T1 & T2). Implemented and operated by Mumbai Metro Rail Corporation Limited (MMRC), Phase 1 (Aarey JVLR to BKC, 12.69 km) opened on 5 October 2024. Explore the Metro Line 3 Route, Metro Line 3 Stations, Mumbai Metro Line 3 Opening Date updates, fare, and timings.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Economics

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Economics

Project Cost₹37,276 Crores (Revised Sanctioned Cost)
Primary BackersGoI & GoM (50:50 JV) + JICA Loan (~57%)
Operator / ModelState/Central Joint Venture (MMRC Board)
Target Opening

Expected Completion Date

StatusPartially Operational
Target Opening DatePhase 1 Operational (Opened 5 October 2024); remaining section under testing / commissioning
Station list

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Stations

#StationTypeInterchange / ConnectionOpened
01
Cuffe Parade
Terminal—Under Advanced Testing
02
Vidhan Bhavan
Regular—Under Advanced Testing
03
Churchgate
InterchangeWestern Railway (Churchgate)Under Advanced Testing
04
Hutatma Chowk
Regular—Under Advanced Testing
05
CSMT
InterchangeCentral Railway & Outstation Trains (CSMT)Under Advanced Testing
06
Kalbadevi
Regular—Under Advanced Testing
07
Girgaon
Regular—Under Advanced Testing
08
Grant Road
InterchangeWestern Railway (Grant Road)Under Advanced Testing
09
Mumbai Central
InterchangeWestern Railway (Mumbai Central)Under Advanced Testing
10
Mahalaxmi
InterchangeWestern Railway (Mumbai Central/Mahalaxmi area)Under Advanced Testing
11
Science Museum
Regular—Under Advanced Testing
12
Acharya Atre Chowk
Regular—Under Advanced Testing
13
Worli
Regular—Under Advanced Testing
14
Siddhivinayak
Regular—Under Advanced Testing
15
Dadar
InterchangeWestern Railway & Central Railway (Dadar)Under Advanced Testing
16
Shitladevi
Regular—Under Advanced Testing
17
Dharavi
Regular—Under Advanced Testing
18
BKC (Bandra Kurla Complex)
Terminal / InterchangeLine 2B (BKC)2024
19
Vidyanagari
RegularMumbai University Kalina2024
20
Santacruz
InterchangeWestern Railway (Santacruz)2024
21
CSMIA T1
InterchangeDomestic Airport Terminal 12024
22
Sahar Road
Regular—2024
23
CSMIA T2
InterchangeInternational Airport Terminal 2 & Line 7A2024
24
Marol Naka
InterchangeLine 1 (Blue Line)2024
25
MIDC
Regular—2024
26
SEEPZ
Regular—2024
27
Aarey JVLR
TerminalLine 6 (Pink Line) & Aarey Depot2024
Geospatial Alignment

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Technical Specifications

ParameterValue
Estimated Cost37276.0
Corridor TypeUnderground (33.0 km Twin Tunnels + 0.5 km At-Grade)
Primary DepotAarey Depot (Aarey Colony, 25 Hectares)
Track GaugeStandard Gauge (1435 mm)
Total Length33.5 km
Opened / Est. OpeningPhase 1 Operational (Opened 5 October 2024); remaining section under testing / commissioning
Corridor StatusPartially Operational
Maximum Design Speed95 km/h (Design) / 80 km/h (Operating)
OperatorMumbai Metro Rail Corporation Limited (MMRC)
Stations Count27
Line Number3 (Aqua Line)
Electrification System25kV AC Rigid Overhead Conductor System (ROCS)
Chronological Milestones

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Timeline

2013

Approved by Cabinet of India; JICA loan agreement signed for ~57% project funding

2016

17 Tunnel Boring Machines (TBMs) deployed across 7 tunneling packages

2022

100% Tunneling completed across 54.5 km of twin underground tunnels

05 Oct 2024

Phase 1 (Aarey JVLR to BKC, 12.69 km, 10 stations) inaugurated by Prime Minister Narendra Modi

2025

Phase 2A (BKC–Acharya Atre Chowk) opened; final phase testing / commissioning in progress

Active

Phase 1 Operational (Opened 5 October 2024); remaining section under testing / commissioning

Proprietary analytics

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Economic & Connectivity Impact

Economic Significance

Cuts travel time between South Mumbai (Cuffe Parade/CSMT) and International Airport (T2) / BKC from 90+ minutes to 35 minutes on the Mumbai Metro Aqua Line.

Traffic Impact

Projected daily ridership exceeds 12 lakh after full corridor commissioning across South Mumbai, BKC, and Western Suburbs.

Employment Centres Served

Provides direct seamless Mumbai Underground Metro transit to Nariman Point, CSMT, Worli, BKC, SEEPZ, and CSIA Airport.

Intermodal Connectivity

First fully underground mega-transit backbone of Mumbai connecting 6 suburban railway hubs and both airport terminals.

Impact on Real Estate

Catalyzing massive transit-oriented commercial redevelopments across Worli, Dadar, Kalina, and BKC.

Geospatial Explorer

Mumbai Metro Line 3 (Cuffe Parade - SEEPZ) Alignment Map & GIS Explorer

Elevated / UndergroundUnderground: 33.0 km | At-Grade: 0.5 km | Elevated: 0 km
Viaduct Length0 km
Tunnel Length33.0 km
River CrossingsMithi River Twin Underground Tunnels
Major Bridges / CrossingsMithi River Tunnel Crossing under riverbed in BKC
Primary DepotAarey Depot (Lat: 19.136, Lon: 72.878)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

Mumbai Metro Line 3, also known as the Aqua Line or Colaba–Bandra–SEEPZ Metro, is Mumbai's first fully underground metro corridor. It runs for 33.5 km between Cuffe Parade and Aarey JVLR and has 27 stations, including 26 underground stations and one at-grade station.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement