METRO CORRIDOR DOSSIER // MUMBAI-METRO-LINE-1

Mumbai Metro Line 1 (Versova - Ghatkopar) Route Map, Stations & Status

Fully Operational📏 11.4 km🚉 12 Stations🗓 08 June 2014🏢 Mumbai Metro One Private Limited (MMOPL)

The Mumbai Metro Blue Line (Line 1) is an 11.4 km fully elevated rapid transit corridor connecting Versova in the Western Suburbs to Ghatkopar in the Eastern Suburbs via Andheri. Known as the Versova Ghatkopar Metro, it opened on 8 June 2014 as Mumbai's first rapid transit line. Operated by Mumbai Metro One Private Limited (MMOPL), a joint venture led by Reliance Infrastructure (69%) and MMRDA (26%), Line 1 serves 12 Mumbai Metro Line 1 Stations with a daily ridership averaging 3 to 4.5 lakh passengers (exceeding 4.5+ lakh on peak weekdays). The Versova to Ghatkopar Metro time is just 21 minutes compared to over 90 minutes by road.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Mumbai Metro Line 1 (Versova - Ghatkopar) Economics

Mumbai Metro Line 1 (Versova - Ghatkopar) Economics

Total Investment₹2,356 Crores (Original) / ₹4,321 Crores (Escalated)
Primary BackersPPP DBFOT Concession (Reliance Infra 69% & MMRDA 26%)
Operator / ModelPPP Concession (35-year concession period)
Station list

Mumbai Metro Line 1 (Versova - Ghatkopar) Stations

#StationTypeInterchange / ConnectionOpened
01
Versova
Terminal—2014
02
D.N. Nagar
InterchangeLine 2A (Yellow Line)2014
03
Azad Nagar
Regular—2014
04
Andheri
InterchangeWestern Railway (Andheri)2014
05
Western Express Highway (WEH)
InterchangeLine 7 (Gundavali via Skywalk)2014
06
Chakala (J.B. Nagar)
Regular—2014
07
Airport Road
Regular—2014
08
Marol Naka
InterchangeLine 3 (Aqua Line Underground)2014
09
Sakinaka
Regular—2014
10
Asalpha Road
Regular—2014
11
Jagruti Nagar
Regular—2014
12
Ghatkopar
TerminalCentral Railway (Ghatkopar)2014
Geospatial Alignment

Mumbai Metro Line 1 (Versova - Ghatkopar) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Mumbai Metro Line 1 (Versova - Ghatkopar) Technical Specifications

ParameterValue
Estimated Cost₹4,300 Crore
Corridor TypeFully Elevated
Primary DepotD.N. Nagar Depot
Track GaugeStandard Gauge (1435 mm)
Total Length11.4 km
Opened / Est. Opening08 June 2014
Corridor StatusFully Operational
Maximum Design Speed80 km/h
OperatorMumbai Metro One Private Limited (MMOPL)
Stations Count12
Line Number1 (Blue Line)
Electrification System25kV AC overhead catenary (OHE)
Chronological Milestones

Mumbai Metro Line 1 (Versova - Ghatkopar) Timeline

2006

MMRDA awards 35-year PPP concession contract to Mumbai Metro One (MMOPL)

2007

Foundation stone laid by Prime Minister Dr. Manmohan Singh

2008

Civil construction and piling work commences across Versova-Ghatkopar corridor

2013

First successful trial run conducted between Versova and Azad Nagar

2014

Line 1 fully inaugurated and opened for commercial operations on 8 June 2014

2019

Records historic peak single-day ridership of over 4.5 lakh passengers

Active

Completed 10 years of operational excellence with over 1 billion cumulative passengers served

Proprietary analytics

Mumbai Metro Line 1 (Versova - Ghatkopar) Economic & Connectivity Impact

Economic Significance

Reduces Versova to Ghatkopar Metro time from 90 minutes by road to just 21 minutes by metro, offering an affordable Versova to Ghatkopar Metro fare structure.

Traffic Impact

Handles 3 to 4.5 lakh daily passengers (exceeding 4.5+ lakh on peak weekdays), significantly easing traffic along Andheri-Kurla Road, JVLR, and SCLR.

Employment Centres Served

Serves major commercial hubs including MIDC Andheri East, SEEPZ, Sakinaka, and BKC feeder routes.

Intermodal Connectivity

Seamless interchange with Western Railway at Andheri and Central Railway at Ghatkopar, plus Line 2A at D.N. Nagar, Line 7 via WEH skywalk, and Line 3 underground at Marol Naka.

Impact on Real Estate

Spurred accelerated commercial and residential development along the Andheri-Kurla Road and Sakinaka transit corridor.

Geospatial Explorer

Mumbai Metro Line 1 (Versova - Ghatkopar) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 11.4 km | Underground: 0 km
Viaduct Length11.4 km
Tunnel Length0 km
River CrossingsMithi River Viaduct Crossing
Major Bridges / CrossingsAndheri Suburban Railway Overbridge (ROB) Cable-Stayed Bridge
Primary DepotD.N. Nagar Depot (Lat: 19.131, Lon: 72.822)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

Mumbai Metro Line 1 is the Versova–Andheri–Ghatkopar corridor, connecting Mumbai's western and eastern suburbs. It is a fully elevated metro corridor with a total length of 11.40 km and 12 stations.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement