METRO CORRIDOR DOSSIER // CHENNAI-METRO-BLUE-LINE-EXTENSION

Chennai Metro Airport–Kilambakkam Extension: Route, Stations, Cost & Status

Proposed & Review Stages📏 15.46 km🚉 13 Planned (All Elevated) Stations🗓 Proposed / Awaiting Central Government Approval🏢 Chennai Metro Rail Limited (CMRL)

The chennai metro blue line extension (Corridor 1 Extension: Chennai International Airport – Kilambakkam Bus Terminus) is a 15.46 km proposed elevated rapid transit corridor extending Chennai's operational Blue Line southwards along Grand Southern Trunk Road (GST Road / NH45). Commuters checking for the airport to kilambakkam metro route, kilambakkam metro update, and gst road metro extension details can view the complete list of 13 proposed elevated stations. Designed to directly link Chennai Airport to the Kalaignar Centenary Bus Terminus (KCBT) at Kilambakkam and relieve chronic congestion on GST Road, the revised detailed project report (DPR) at an estimated cost of ₹9,335 crore (including an integrated elevated highway) was officially submitted by CMRL in February 2025. As of August 2026, the project status remains proposed while awaiting Central Government approval.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Chennai Metro Blue Line Extension Economics

Chennai Metro Blue Line Extension Economics

Total Investment₹9,335 Crores (including integrated elevated road)
Primary BackersState SPV Joint Venture & Central Government Equity (Proposed)
Operator / ModelState SPV Mass Rapid Transit System (CMRL)
Target Opening

Expected Completion Date

StatusProposed & Review Stages
Target Opening DateProposed / Awaiting Central Government Approval
Station list

Chennai Metro Airport–Kilambakkam Extension Stations & Interchanges

#StationTypeInterchange / ConnectionOpened
01
Chennai International Airport
TerminalBlue Line (Corridor 1 Terminal) & T1/T2 Airport TerminalsProposed / Awaiting Approval
02
Pallavaram
RegularGST Road Commercial BeltProposed / Awaiting Approval
03
Chromepet
InterchangeChromepet Suburban Railway Station & MIT CampusProposed / Awaiting Approval
04
Chromepet Bus Stand
RegularChromepet Bus Stop PrecinctProposed / Awaiting Approval
05
Tambaram Sanatorium
InterchangeMadras Export Processing Zone (MEPZ) & Tambaram Sanatorium StationProposed / Awaiting Approval
06
Tambaram
InterchangeTambaram Railway Junction & Intercity Bus StandProposed / Awaiting Approval
07
Irumbuliyur
RegularIrumbuliyur Junction & Bye-passProposed / Awaiting Approval
08
Peerkankaranai
RegularPeerkankaranai PrecinctProposed / Awaiting Approval
09
Perungalathur
InterchangePerungalathur Suburban Station & Bus Boarding PointProposed / Awaiting Approval
10
Vandalur
InterchangeVandalur Suburban Railway Station & Crescent Engineering CollegeProposed / Awaiting Approval
11
Arignar Anna Zoopark
RegularVandalur Zoo Gateway PrecinctProposed / Awaiting Approval
12
Kilambakkam
InterchangeKalaignar Centenary Bus Terminus (KCBT / Kilambakkam)Proposed / Awaiting Approval
13
Kilambakkam Bus Terminus
TerminalKalaignar Centenary Bus Terminus (KCBT Terminal)Proposed / Awaiting Approval
Geospatial Alignment

Chennai Metro Blue Line Extension Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Chennai Metro Blue Line Extension Technical Specifications

ParameterValue
Estimated Cost₹4,080 Crores
Corridor TypeElevated Viaduct Corridor
Primary DepotWimco Nagar Depot (Existing Line 1 Depot)
Track GaugeStandard Gauge (1435 mm)
Total Length15.46 km
Opened / Est. OpeningProposed / Awaiting Central Government Approval
Corridor StatusProposed & Review Stages
Maximum Design Speed80 km/h
OperatorChennai Metro Rail Limited (CMRL)
Stations Count13 Planned (All Elevated)
Line NumberCorridor 1 Extension (Blue Line Extension)
Electrification System25 kV AC Overhead Catenary (OHE)
Chronological Milestones

Chennai Metro Blue Line Extension Timeline

2020

CMRL initiates alignment planning for Corridor 1 Extension from Airport to Kilambakkam.

2025

CMRL officially submits revised DPR for the 15.46 km extension at ₹9,335 crore (including integrated elevated road) in February 2025.

2026

CMRL actively seeks Central Government approval and Cabinet sanction as of August 2026.

Proprietary analytics

Chennai Metro Blue Line Extension Economic & Connectivity Impact

Economic Significance

Provides a high-speed direct transit corridor connecting Chennai International Airport to the newly established Kilambakkam Intercity Bus Terminus (KCBT), serving thousands of intercity bus travelers daily.

Traffic Impact

Eliminates heavy bumper-to-bumper traffic jams along GST Road (NH45), Tambaram Sanatorium flyover, Chromepet junction, and Perungalathur toll plazas.

Employment Centres Served

Serves major industrial export hubs (MEPZ Tambaram), educational campuses (Vandalur Zoo, SRM University precinct), and commercial centers along GST Road.

Intermodal Connectivity

Features seamless multi-modal transfers with Southern Railway Suburban line at Chromepet, Tambaram, Perungalathur, and Vandalur.

Geospatial Explorer

Chennai Metro Blue Line Extension Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 15.46 km (13 stations)
Viaduct Length15.46 km
Tunnel Length0 km
River CrossingsNone / Not Applicable
Major Bridges / CrossingsElevated viaduct over GST Road flyovers and Tambaram Railway flyover crossing
Primary DepotWimco Nagar Depot (Existing Line 1 Depot)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The proposed Corridor 1 Extension spans 15.46 km along GST Road (NH45) featuring 13 elevated stations from Chennai International Airport to Kilambakkam Bus Terminus (KCBT) at an estimated project cost of ₹9,335 crore (including an integrated elevated highway).

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Tamil Nadu Dashboard →TN
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement