The Chennai Metro Green Line Route (Corridor 2: Puratchi Thalaivar Dr. M.G. Ramachandran Central – St. Thomas Mount) is an operational 22.0 km rapid transit corridor in Chennai, Tamil Nadu. Spanning 17 Chennai Metro Green Line Stations across a 12.3 km elevated section (8 elevated stations) and a 9.7 km underground twin-tunnel section (9 underground stations), the line connects Chennai Central Railway Station to St. Thomas Mount via Egmore, Kilpauk, Anna Nagar, Koyambedu CMBT, Vadapalani, Ashok Nagar, and Alandur. Commuters viewing the Chennai Metro Green Line Map can navigate key transit interchanges across the ring-radial corridor. The Chennai Metro Green Line Latest Update confirms stable full-line passenger services following the official Chennai Metro Green Line Completion Date when the final underground stretch opened on 25 May 2018. Studies have also been evaluated for potential future Chennai Metro Green Line Extension routes. Chief Minister J. Jayalalithaa inaugurated the initial 10.1 km elevated section from Koyambedu to Alandur on 29 June 2015, making it the first operational metro line in Chennai. Implemented and operated by Chennai Metro Rail Limited (CMRL), Corridor 2 features Standard Gauge (1435 mm) track, 25 kV AC overhead catenary (OHE), Alstom 4-car trainsets, and ATO/ATP automatic signaling system.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Chennai Metro Green Line Economics
Chennai Metro Green Line Stations & Interchanges
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Puratchi Thalaivar Dr. M.G. Ramachandran Central | Terminal | Blue Line (Line 1) & Chennai Central Railway Station | 25 May 2018 |
| 02 | Egmore | Interchange | Egmore Railway Station & Suburban Rail | 25 May 2018 |
| 03 | Nehru Park | Regular | Nehru Park Precinct & Poonamallee High Road | 14 May 2017 |
| 04 | Kilpauk | Regular | Kilpauk Medical College & Hospital | 14 May 2017 |
| 05 | Pachaiyappa's College | Regular | Pachaiyappa's College Campus | 14 May 2017 |
| 06 | Shenoy Nagar | Regular | Thiru Vi Ka Park & Shenoy Nagar Precinct | 14 May 2017 |
| 07 | Anna Nagar East | Regular | Anna Nagar Commercial Hub | 14 May 2017 |
| 08 | Anna Nagar Tower | Regular | Tower Park & Commercial Precinct | 14 May 2017 |
| 09 | Thirumangalam | Regular | VR Chennai Mall & Inner Ring Road | 14 May 2017 |
| 10 | Koyambedu | Regular | Koyambedu Wholesale Market & Maintenance Depot | 29 Jun 2015 |
| 11 | Puratchi Thalaivi Dr. J. Jayalalithaa CMBT | Regular | Koyambedu Intercity Bus Terminus (CMBT) | 29 Jun 2015 |
| 12 | Arumbakkam | Regular | Arumbakkam Commercial Area | 29 Jun 2015 |
| 13 | Vadapalani | Regular | Vadapalani Murugan Temple & Forum Vijaya Mall | 29 Jun 2015 |
| 14 | Ashok Nagar | Regular | Ashok Pillar & 100 Feet Road | 29 Jun 2015 |
| 15 | Ekkattuthangal | Regular | Ekkattuthangal Industrial Estate | 29 Jun 2015 |
| 16 | Alandur | Interchange | Blue Line (Line 1 Junction) & Kathipara Flyover | 29 Jun 2015 |
| 17 | St. Thomas Mount | Terminal | Southern Railway Suburban Rail & Chennai MRTS Line | 14 Oct 2016 |
Chennai Metro Green Line Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerChennai Metro Green Line Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹14,600 Crores |
| Corridor Type | Elevated (12.3 km) & Underground (9.7 km Twin-Tunnel) |
| Primary Depot | Koyambedu Maintenance Depot |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 22.0 km |
| Opened / Est. Opening | 29 June 2015 (First Section) / 25 May 2018 (Full Line) |
| Corridor Status | Fully Operational |
| Maximum Design Speed | 80 km/h |
| Operator | Chennai Metro Rail Limited (CMRL) |
| Stations Count | 17 Operational (8 Elevated + 9 Underground) |
| Line Number | Corridor 2 (Green Line) |
| Electrification System | 25 kV AC Overhead Catenary (OHE) |
Chennai Metro Green Line Timeline
Government of Tamil Nadu approves Phase 1 including 22.0 km Green Line from Central to St. Thomas Mount.
Construction commences following JICA concessionary loan funding agreement.
Chief Minister J. Jayalalithaa inaugurates commercial operations on the initial 10.1 km elevated section (Koyambedu to Alandur) on 29 June 2015.
Elevated extension from Alandur to St. Thomas Mount opened on 14 October 2016.
First underground section from Koyambedu to Nehru Park opened on 14 May 2017.
7.3 km underground section from Nehru Park to Chennai Central opened on 25 May 2018, completing the 22.0 km line.
Chennai Metro Green Line Economic & Connectivity Impact
Economic Significance
Connects major regional transit terminals (Chennai Central, Egmore Railway Station, Koyambedu Intercity CMBT) directly with key commercial and residential hubs.
Traffic Impact
Relieves heavy congestion along Inner Ring Road (100 Feet Road), Poonamallee High Road, Vadapalani Junction, and Anna Nagar arterial roads.
Employment Centres Served
Provides daily rapid transit to thousands of workers across Vadapalani media/commercial district, Koyambedu wholesale market, and Guindy/Ekkattuthangal industrial estates.
Intermodal Connectivity
Features multi-modal integration with Indian Railways (Central & Egmore), Suburban Rail, Intercity Bus Terminus (CMBT), and Chennai MRTS at St. Thomas Mount.
Chennai Metro Green Line Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.