Chennai Metro Green Line Route Map, Stations & Latest Update

Fully Operational📏 22.0 km🚉 17 Operational (8 Elevated + 9 Underground) Stations🗓 29 June 2015🏢 Chennai Metro Rail Limited (CMRL)

The Chennai Metro Green Line Route (Corridor 2: Puratchi Thalaivar Dr. M.G. Ramachandran Central – St. Thomas Mount) is an operational 22.0 km rapid transit corridor in Chennai, Tamil Nadu. Spanning 17 Chennai Metro Green Line Stations across a 12.3 km elevated section (8 elevated stations) and a 9.7 km underground twin-tunnel section (9 underground stations), the line connects Chennai Central Railway Station to St. Thomas Mount via Egmore, Kilpauk, Anna Nagar, Koyambedu CMBT, Vadapalani, Ashok Nagar, and Alandur. Commuters viewing the Chennai Metro Green Line Map can navigate key transit interchanges across the ring-radial corridor. The Chennai Metro Green Line Latest Update confirms stable full-line passenger services following the official Chennai Metro Green Line Completion Date when the final underground stretch opened on 25 May 2018. Studies have also been evaluated for potential future Chennai Metro Green Line Extension routes. Chief Minister J. Jayalalithaa inaugurated the initial 10.1 km elevated section from Koyambedu to Alandur on 29 June 2015, making it the first operational metro line in Chennai. Implemented and operated by Chennai Metro Rail Limited (CMRL), Corridor 2 features Standard Gauge (1435 mm) track, 25 kV AC overhead catenary (OHE), Alstom 4-car trainsets, and ATO/ATP automatic signaling system.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Chennai Metro Green Line Economics

Chennai Metro Green Line Economics

Project Cost₹14,600 Crore (Chennai Metro Phase 1 Total Sanctioned Cost)
Primary BackersJoint Venture between Govt of India & Govt of Tamil Nadu with JICA loan
Operator / ModelState SPV Mass Rapid Transit System (CMRL)
Station list

Chennai Metro Green Line Stations & Interchanges

#StationTypeInterchange / ConnectionOpened
01
Puratchi Thalaivar Dr. M.G. Ramachandran Central
TerminalBlue Line (Line 1) & Chennai Central Railway Station25 May 2018
02
Egmore
InterchangeEgmore Railway Station & Suburban Rail25 May 2018
03
Nehru Park
RegularNehru Park Precinct & Poonamallee High Road14 May 2017
04
Kilpauk
RegularKilpauk Medical College & Hospital14 May 2017
05
Pachaiyappa's College
RegularPachaiyappa's College Campus14 May 2017
06
Shenoy Nagar
RegularThiru Vi Ka Park & Shenoy Nagar Precinct14 May 2017
07
Anna Nagar East
RegularAnna Nagar Commercial Hub14 May 2017
08
Anna Nagar Tower
RegularTower Park & Commercial Precinct14 May 2017
09
Thirumangalam
RegularVR Chennai Mall & Inner Ring Road14 May 2017
10
Koyambedu
RegularKoyambedu Wholesale Market & Maintenance Depot29 Jun 2015
11
Puratchi Thalaivi Dr. J. Jayalalithaa CMBT
RegularKoyambedu Intercity Bus Terminus (CMBT)29 Jun 2015
12
Arumbakkam
RegularArumbakkam Commercial Area29 Jun 2015
13
Vadapalani
RegularVadapalani Murugan Temple & Forum Vijaya Mall29 Jun 2015
14
Ashok Nagar
RegularAshok Pillar & 100 Feet Road29 Jun 2015
15
Ekkattuthangal
RegularEkkattuthangal Industrial Estate29 Jun 2015
16
Alandur
InterchangeBlue Line (Line 1 Junction) & Kathipara Flyover29 Jun 2015
17
St. Thomas Mount
TerminalSouthern Railway Suburban Rail & Chennai MRTS Line14 Oct 2016
Geospatial Alignment

Chennai Metro Green Line Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Chennai Metro Green Line Technical Specifications

ParameterValue
Estimated Cost₹14,600 Crores
Corridor TypeElevated (12.3 km) & Underground (9.7 km Twin-Tunnel)
Primary DepotKoyambedu Maintenance Depot
Track GaugeStandard Gauge (1435 mm)
Total Length22.0 km
Opened / Est. Opening29 June 2015 (First Section) / 25 May 2018 (Full Line)
Corridor StatusFully Operational
Maximum Design Speed80 km/h
OperatorChennai Metro Rail Limited (CMRL)
Stations Count17 Operational (8 Elevated + 9 Underground)
Line NumberCorridor 2 (Green Line)
Electrification System25 kV AC Overhead Catenary (OHE)
Chronological Milestones

Chennai Metro Green Line Timeline

2007

Government of Tamil Nadu approves Phase 1 including 22.0 km Green Line from Central to St. Thomas Mount.

2009

Construction commences following JICA concessionary loan funding agreement.

2015

Chief Minister J. Jayalalithaa inaugurates commercial operations on the initial 10.1 km elevated section (Koyambedu to Alandur) on 29 June 2015.

2016

Elevated extension from Alandur to St. Thomas Mount opened on 14 October 2016.

2017

First underground section from Koyambedu to Nehru Park opened on 14 May 2017.

2018

7.3 km underground section from Nehru Park to Chennai Central opened on 25 May 2018, completing the 22.0 km line.

Proprietary analytics

Chennai Metro Green Line Economic & Connectivity Impact

Economic Significance

Connects major regional transit terminals (Chennai Central, Egmore Railway Station, Koyambedu Intercity CMBT) directly with key commercial and residential hubs.

Traffic Impact

Relieves heavy congestion along Inner Ring Road (100 Feet Road), Poonamallee High Road, Vadapalani Junction, and Anna Nagar arterial roads.

Employment Centres Served

Provides daily rapid transit to thousands of workers across Vadapalani media/commercial district, Koyambedu wholesale market, and Guindy/Ekkattuthangal industrial estates.

Intermodal Connectivity

Features multi-modal integration with Indian Railways (Central & Egmore), Suburban Rail, Intercity Bus Terminus (CMBT), and Chennai MRTS at St. Thomas Mount.

Geospatial Explorer

Chennai Metro Green Line Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 12.3 km (8 Stations) | Underground: 9.7 km (9 Stations)
Viaduct Length12.3 km
Tunnel Length9.7 km
River CrossingsNone / Not Applicable
Major Bridges / CrossingsElevated viaducts along 100 Feet Road and Inner Ring Road
Primary DepotKoyambedu Maintenance Depot

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Chennai Metro Green Line, officially Corridor 2, runs between Puratchi Thalaivar Dr. M.G. Ramachandran Central Metro and St. Thomas Mount. The route passes through Egmore, Shenoy Nagar, Anna Nagar, Thirumangalam, Koyambedu, CMBT, Vadapalani, Ashok Nagar, Ekkattuthangal and Alandur.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Tamil Nadu Dashboard →TN
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement