Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // CHENNAI-METRO-BLUE-LINE

Chennai Metro Blue Line Route Map, Stations, Timings & Latest Update

Fully Operational📏 32.1 km🚉 26 Operational (13 Elevated/At-Grade + 13 Underground) Stations🗓 21 September 2016🏢 Chennai Metro Rail Limited (CMRL)

The Chennai Metro Blue Line Route (Corridor 1: Wimco Nagar Depot – Chennai International Airport) is an operational 32.1 km North-South arterial mass rapid transit line in Chennai, Tamil Nadu. Spanning 26 Chennai Metro Blue Line Stations across a 17.8 km elevated/at-grade section (13 stations) and a 14.3 km underground twin-tunnel section (13 stations) beneath Anna Salai (Mount Road) and GT Road, the line connects Chennai International Airport to Wimco Nagar Depot via key transit hubs including Chennai Central, LIC, Thousand Lights, Guindy, Alandur, and Meenambakkam. Commuters looking for the Chennai Metro Blue Line Map can explore the complete geospatial alignment connecting North Chennai to the airport. The Chennai Metro Blue Line Latest Update highlights ongoing operational efficiency, while planning progresses for the proposed Chennai Metro Blue Line Extension towards Kilambakkam Bus Terminus (KCBT). Originally opened on 21 September 2016 from Airport to Little Mount, the line was extended to AG-DMS (May 2018), Washermanpet (February 2019), Wimco Nagar (February 2021), and Wimco Nagar Depot (March 2022). Implemented and operated by Chennai Metro Rail Limited (CMRL), the Blue Line features Standard Gauge (1435 mm) track, 25 kV AC overhead catenary (OHE), Alstom 4-car rolling stock, and ATO/ATP automatic train control.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Chennai Metro Blue Line Economics

Chennai Metro Blue Line Economics

Total InvestmentPhase 1: ₹14,600 Crore (45.1 km) + Phase 1 Extension: ₹3,770 Crore (9.05 km)
Primary BackersJoint Venture between Govt of India & Govt of Tamil Nadu with JICA loan
Operator / ModelState SPV Mass Rapid Transit System (CMRL)
Station list

Chennai Metro Blue Line Stations & Interchanges

#StationTypeInterchange / ConnectionOpened
01
Wimco Nagar Depot
TerminalWimco Nagar Depot13 Mar 2022
02
Wimco Nagar
RegularWimco Nagar Suburban Railway Station14 Feb 2021
03
Tiruvottriyur
RegularTiruvottriyur Bus Stand14 Feb 2021
04
Tiruvottriyur Theradi
RegularTheradi Ther Temple Precinct13 Mar 2022
05
Kaladipet
RegularKaladipet Commercial Precinct14 Feb 2021
06
Tollgate
RegularTollgate Bus Interchange14 Feb 2021
07
New Washermanpet
RegularNew Washermanpet Residential Belt14 Feb 2021
08
Tondiarpet
RegularTondiarpet Commercial Hub14 Feb 2021
09
Sir Theagaraya College
RegularSir Theagaraya College Campus14 Feb 2021
10
Washermanpet
InterchangeWashermanpet Railway Station10 Feb 2019
11
Mannadi
RegularGeorge Town Commercial Market10 Feb 2019
12
High Court
RegularMadras High Court & Broadway Bus Terminus10 Feb 2019
13
Puratchi Thalaivar Dr. M.G. Ramachandran Central
InterchangeGreen Line, Chennai Central Railway Station, Chennai Park (Suburban South Line), Moore Market (Suburban West Line), Park Town (MRTS)10 Feb 2019
14
Government Estate
RegularOmandurar Government Hospital & Secretariat10 Feb 2019
15
LIC
RegularLIC Building & Anna Salai Financial District10 Feb 2019
16
Thousand Lights
RegularThousand Lights Commercial Spine & Greams Road10 Feb 2019
17
AG – DMS
RegularDirectorate of Medical Services (DMS)25 May 2018
18
Teynampet
RegularTeynampet Commercial District25 May 2018
19
Nandanam
RegularNandanam Arts College & Venkatanarayana Road25 May 2018
20
Saidapet
RegularSaidapet Railway Station & Court Complex25 May 2018
21
Little Mount
RegularLittle Mount Church Precinct & Maraimalai Adigal Bridge21 Sep 2016
22
Guindy
InterchangeGuindy Suburban Railway Station & Industrial Estate21 Sep 2016
23
Alandur
InterchangeGreen Line (Line 2 Junction) & Kathipara Flyover21 Sep 2016
24
Nanganallur Road
RegularNanganallur Residential Area21 Sep 2016
25
Meenambakkam
RegularMeenambakkam Cargo Terminal21 Sep 2016
26
Chennai Airport
TerminalChennai International Airport T1 & T2 Terminals21 Sep 2016
Geospatial Alignment

Chennai Metro Blue Line Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Chennai Metro Blue Line Technical Specifications

ParameterValue
Estimated Cost₹18,370 Crores
Corridor TypeElevated/At-Grade (17.8 km) & Underground (14.3 km Twin-Tunnel)
Primary DepotWimco Nagar Depot & Koyambedu Depot
Track GaugeStandard Gauge (1435 mm)
Total Length32.1 km
Opened / Est. Opening21 September 2016 (First Section) / 13 March 2022 (Full Line)
Corridor StatusFully Operational
Maximum Design Speed80 km/h
OperatorChennai Metro Rail Limited (CMRL)
Stations Count26 Operational (13 Elevated/At-Grade + 13 Underground)
Line NumberCorridor 1 (Blue Line)
Electrification System25 kV AC Overhead Catenary (OHE)
Chronological Milestones

Chennai Metro Blue Line Timeline

2007

Government of Tamil Nadu approves Phase 1 including 23.08 km Blue Line from Airport to Washermanpet.

2009

Construction commences following JICA funding agreement approval.

2016

Chief Minister J. Jayalalithaa inaugurates initial elevated section from Airport to Little Mount on 21 September 2016.

2018

Section from Little Mount to AG-DMS opened on 25 May 2018.

2019

Underground section from AG-DMS to Washermanpet inaugurated by PM Narendra Modi on 10 February 2019.

2021

9.05 km Phase 1 Extension from Washermanpet to Wimco Nagar commissioned and opened for public operation on 14 February 2021.

2022

Wimco Nagar Depot station and Tiruvottriyur Theradi opened on 13 March 2022, completing the 32.1 km line.

Proprietary analytics

Chennai Metro Blue Line Economic & Connectivity Impact

Economic Significance

Acts as the main commercial spine of Chennai, connecting Central Business District (CBD), Anna Salai corporate towers, and North Chennai trade hubs directly to Chennai International Airport.

Traffic Impact

Eliminates heavy traffic bottlenecks along Anna Salai (Mount Road), Kathipara Junction, GST Road, and Broadway/High Court Market precincts.

Employment Centres Served

Serves daily commuters across North Chennai industrial belts, Anna Salai corporate headquarters, Guindy Industrial Estate, and airport logistics facilities.

Intermodal Connectivity

Provides direct seamless interchange with Green Line at Alandur & Central, and suburban rail networks at Guindy, Wimco Nagar, Washermanpet, and Chennai Central.

Geospatial Explorer

Chennai Metro Blue Line Alignment Map & GIS Explorer

Elevated / UndergroundElevated/At-Grade: 17.8 km (13 Stations) | Underground: 14.3 km (13 Stations)
Viaduct Length17.8 km
Tunnel Length14.3 km
River CrossingsElevated viaduct crossing over Adyar River near Little Mount
Major Bridges / CrossingsKathipara Grade Separator / Multi-level Metro Viaduct Junction
Primary DepotWimco Nagar Depot & Koyambedu Maintenance Depot

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Chennai Metro Blue Line is Corridor 1 of the Phase I network and runs between Chennai International Airport and Wimco Nagar in north Chennai. The route passes through Alandur, Guindy, Saidapet, Teynampet, Chennai Central, Washermenpet and Thiruvottriyur before reaching Wimco Nagar.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Tamil Nadu Dashboard →TN
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement