METRO CORRIDOR DOSSIER // AHMEDABAD-METRO-YELLOW-LINE

Ahmedabad Metro Yellow Line Route Map, Stations & Status (2026)

Fully Operational📏 22.84 km🚉 20 Phase-II Stations (+ 1 existing Motera interchange) Stations🗓 11 January 2026🏢 Gujarat Metro Rail Corporation (GMRC) Limited

The Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) is an operational 22.84 km North-South rapid transit corridor extending the metro network from Motera Stadium in northern Ahmedabad into Gandhinagar, terminating at Mahatma Mandir. Operable across 20 new Phase-II stations (+ 1 existing Motera Stadium interchange from Phase 1), the Yellow Line corridor connects key educational, administrative, and technological hubs including Gujarat National Law University (GNLU), Infocity, Sachivalaya (Gujarat State Secretariat), and Swaminarayan Akshardham. Note that GMRC officially defines Corridor 1 (Motera–Mahatma Mandir) as 20 new stations over 22.838 km, while the overall Phase-II project comprises 22 stations (including 2 on the separate 5.416 km GNLU–GIFT City Corridor 2). Prime Minister Narendra Modi inaugurated the initial operational section (Motera Stadium to Sector-1 & GNLU–GIFT City corridor) on 16 September 2024, followed by phased commissioning of intermediate stations in 2025, and final inauguration of the full Motera Stadium–Mahatma Mandir corridor on 11 January 2026. Operated by Gujarat Metro Rail Corporation (GMRC) Limited, the Yellow Line links with Line 2 (Red Line) at Motera Stadium, connects to GIFT City via the separate GNLU–GIFT City corridor at GNLU station, and provides feeder access to Gandhinagar Capital railway station.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Economics

Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Economics

Project Cost₹5,384.17 Crores (Ahmedabad Metro Phase-II total sanctioned cost)
Primary Backers50:50 Joint Venture between Govt of India & Govt of Gujarat
Operator / ModelState SPV Public Transit (GMRC Ltd)
Station list

Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Stations

#StationTypeInterchange / ConnectionOpened
01
Motera Stadium
TerminalRed Line (Line 2 Interchange)30 Sept 2022
02
Koteshwar Road
Regular—27 Apr 2025
03
Vishwakarma College
Regular—27 Apr 2025
04
Tapovan Circle
Regular—27 Apr 2025
05
Narmada Canal
Regular—27 Apr 2025
06
Koba Circle
Regular—27 Apr 2025
07
Juna Koba
Regular—28 Sept 2025
08
Koba Gaam
Regular—28 Sept 2025
09
GNLU
InterchangeJunction with separate GNLU–GIFT City Phase-II corridor (Corridor 2)16 Sept 2024
10
Raysan
Regular—16 Sept 2024
11
Randesan
Regular—16 Sept 2024
12
Dholakuva Circle
Regular—16 Sept 2024
13
Infocity
InterchangeCity Bus Stop / Infocity IT Hub16 Sept 2024
14
Sector-1
RegularCity Bus Stop16 Sept 2024
15
Sector-10A
RegularCity Bus Stop27 Apr 2025
16
Sachivalaya
InterchangeGujarat Secretariat / City Bus Stop27 Apr 2025
17
Akshardham
RegularAkshardham Temple Precinct11 Jan 2026
18
Juna Sachivalaya
InterchangeOld Secretariat / City Bus Stop11 Jan 2026
19
Sector-16
RegularCity Bus Stop11 Jan 2026
20
Sector-24
RegularCity Bus Stop11 Jan 2026
21
Mahatma Mandir
TerminalGandhinagar Capital Railway Station access (WR)11 Jan 2026
Geospatial Alignment

Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Technical Specifications

ParameterValue
Estimated Cost₹5,384 Crores
Corridor Type100% Elevated
Primary DepotIndroda Depot (Gandhinagar)
Track GaugeStandard Gauge (1435 mm)
Total Length22.84 km
Opened / Est. Opening11 January 2026 (Inauguration of full corridor); initial section opened 16 September 2024
Corridor StatusFully Operational
Maximum Design Speed80 km/h
OperatorGujarat Metro Rail Corporation (GMRC) Limited
Stations Count20 Phase-II Stations (+ 1 existing Motera interchange)
Line NumberYellow Line (Motera Stadium – Mahatma Mandir)
Electrification System750V DC Third Rail
Chronological Milestones

Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Timeline

2017

Gujarat State Cabinet approved Ahmedabad Metro Phase 2 DPR.

2019

Union Cabinet approved Ahmedabad Metro Phase-II total sanctioned cost of ₹5,384.17 crore for 28.254 km (22.838 km Motera–Mahatma Mandir corridor + 5.416 km GNLU–GIFT City corridor).

2020

Civil construction awarded for Motera Stadium to GNLU and Gandhinagar Sachivalaya elevated viaduct packages.

2024

Prime Minister Narendra Modi inaugurated the initial Phase-II operational section (Motera Stadium to Sector-1 and GNLU–GIFT City corridor) on 16 September 2024.

2025

Phased commissioning of intermediate elevated stations along the Motera Stadium to Gandhinagar alignment.

2026

Final stretch to Mahatma Mandir officially inaugurated by PM Narendra Modi on 11 January 2026, followed by commercial passenger operations.

Proprietary analytics

Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Economic & Connectivity Impact

Economic Significance

Provides rapid mass transit connection between northern Ahmedabad and Gandhinagar.

Traffic Impact

Provides an elevated transit alternative along the Ashram Road – Koba Circle – Gandhinagar corridor.

Employment Centres Served

Provides rapid transit access to Gujarat Secretariat (Sachivalaya), Infocity IT Hub, GNLU campus, and Mahatma Mandir Convention Centre.

Intermodal Connectivity

Direct interchange with separate GNLU–GIFT City corridor at GNLU junction and proximity to Gandhinagar Capital railway station.

Impact on Real Estate

Serves key administrative, educational, and institutional clusters across Gandhinagar.

Geospatial Explorer

Ahmedabad Metro Yellow Line (Motera Stadium – Mahatma Mandir) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 22.84 km | Underground: 0.00 km
Viaduct Length22.84 km
Tunnel Length0.00 km
River CrossingsSabarmati River approach crossing & Narmada Main Canal crossing
Major Bridges / CrossingsNarmada Main Canal Metro Bridge structure & elevated arterial road viaduct spans
Primary DepotIndroda Depot (Gandhinagar)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Ahmedabad Metro Yellow Line is the GNLU–GIFT City corridor of Phase 2. It runs for about 5.4 km from GNLU to GIFT City and provides metro connectivity between Gandhinagar and GIFT City.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Gujarat Dashboard →GJ
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement