Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // AHMEDABAD-METRO-VIOLET-LINE

Ahmedabad Metro Violet Line (GIFT City) Route, Stations & Map

Fully Operational📏 5.42 km🚉 2 stations (+ GNLU main line interchange) Stations🗓 16 September 2024🏢 Gujarat Metro Rail Corporation (GMRC) Limited

The GNLU–GIFT City Spur (Ahmedabad Metro Phase 2 Branch) is an operational 5.42 km elevated rapid transit spur line connecting the main Yellow Line at Gujarat National Law University (GNLU) station directly into Gujarat International Finance Tec-City (GIFT City). Serving 2 stations on the spur corridor (PDEU and GIFT City), with GNLU as the main line interchange station, the branch provides metro connectivity to GIFT City and GIFT IFSC. Prime Minister Narendra Modi inaugurated the operational 5.42 km GNLU–GIFT City corridor on 16 September 2024. Operated by Gujarat Metro Rail Corporation (GMRC) Limited, the line features a dedicated Sabarmati River bridge crossing to integrate GIFT City into the broader metropolitan transit grid.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Ahmedabad Metro Violet Line (GIFT City) Economics

Ahmedabad Metro Violet Line (GIFT City) Economics

Project Cost₹5,384.17 Crores (Ahmedabad Metro Phase-II total sanctioned cost)
Primary Backers50:50 Joint Venture between Govt of India & Govt of Gujarat
Operator / ModelState SPV Public Transit (GMRC Ltd)
Station list

Ahmedabad Metro Violet Line (GIFT City) Stations

#StationTypeInterchange / ConnectionOpened
01
GNLU
Interchange / Connecting StationYellow Line Main Corridor Interchange (Main Line Station)16 Sept 2024
02
PDEU
RegularPandit Deendayal Energy University Campus16 Sept 2024
03
GIFT City
TerminalGIFT City IFSC Financial Hub16 Sept 2024
Geospatial Alignment

Ahmedabad Metro Violet Line (GIFT City) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Ahmedabad Metro Violet Line (GIFT City) Technical Specifications

ParameterValue
Estimated Cost₹5,384 Crores
Corridor Type100% Elevated
Primary DepotIndroda Depot (Gandhinagar)
Track GaugeStandard Gauge (1435 mm)
Total Length5.42 km
Opened / Est. Opening16 September 2024
Corridor StatusFully Operational
Maximum Design Speed80 km/h
OperatorGujarat Metro Rail Corporation (GMRC) Limited
Stations Count2 stations (+ GNLU main line interchange)
Line NumberGNLU–GIFT City Spur (Phase 2 Branch)
Electrification System750V DC Third Rail
Chronological Milestones

Ahmedabad Metro Violet Line (GIFT City) Timeline

2017

Gujarat State Cabinet includes 5.416 km GIFT City corridor in Phase 2 DPR.

2019

Union Cabinet approves Phase-II project including the 5.416 km elevated Sabarmati River bridge corridor to GIFT City.

2021

Afcons Infrastructure constructed the GNLU–GIFT City elevated viaduct, Sabarmati River bridge, and station packages.

2024

Prime Minister Narendra Modi inaugurated the operational 5.42 km GNLU–GIFT City corridor on 16 September 2024.

Proprietary analytics

Ahmedabad Metro Violet Line (GIFT City) Economic & Connectivity Impact

Economic Significance

Provides metro connectivity to GIFT City and GIFT IFSC.

Traffic Impact

Provides dedicated rapid transit access across the Sabarmati River corridor into GIFT City.

Employment Centres Served

Serves financial sector employees, technology workers, and university students travelling to PDEU and GIFT City.

Intermodal Connectivity

Provides direct 2-station connection from GNLU interchange to GIFT City.

Geospatial Explorer

Ahmedabad Metro Violet Line (GIFT City) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 5.42 km | Underground: 0.00 km
Viaduct Length5.42 km
Tunnel Length0.00 km
River CrossingsDedicated Sabarmati River Metro Bridge
Major Bridges / CrossingsSabarmati River Metro Bridge Crossing to GIFT City
Primary DepotIndroda Depot (Gandhinagar)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Ahmedabad Metro Violet Line refers to the GNLU–GIFT City corridor of Ahmedabad Metro Phase 2. It connects GNLU with GIFT City in Gandhinagar over a 5.4 km route and is fully operational.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Gujarat Dashboard →GJ
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement