Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // AHMEDABAD-METRO-BLUE-LINE

Ahmedabad Metro Blue Line (Line 1) Route Map, Stations & Status

Fully Operational📏 21.16 km🚉 17 Stations🗓 04 March 2019🏢 Gujarat Metro Rail Corporation (GMRC) Limited

The Ahmedabad Metro Blue Line (Line 1: Thaltej Gam – Vastral Gam) is an operational 21.16 km East-West rapid transit corridor connecting Thaltej Gam in western Ahmedabad to Vastral Gam in the eastern residential belt. Operable across 17 stations (13 elevated and 4 underground), the line features a 6.5 km twin-tunnel underground section beneath historic Walled Ahmedabad. Prime Minister Narendra Modi inaugurated the 6.5 km priority section from Vastral Gam to Apparel Park on 4 March 2019, followed by the remaining section on 30 September 2022 and the Thaltej Gam extension on 8 December 2024. Operated by Gujarat Metro Rail Corporation (GMRC) Limited, Line 1 intersects with Line 2 (Red Line) at Old High Court and connects directly to Indian Railways at Kalupur (Ahmedabad Junction). Explore the ahmedabad metro blue line route, ahmedabad metro blue line map, and ahmedabad metro blue line stations for complete route details, stations & timings.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Ahmedabad Metro Blue Line (Line 1) Economics

Ahmedabad Metro Blue Line (Line 1) Economics

Project Cost₹10,773 Crores (Phase 1 Sanctioned Cost)
Primary Backers50:50 Joint Venture between Govt of India & Govt of Gujarat
Operator / ModelState SPV Public Transit (GMRC Ltd)
Station list

Ahmedabad Metro Blue Line (Line 1) Stations

#StationTypeInterchange / ConnectionOpened
01
Thaltej Gam
Terminal—8 Dec 2024
02
Thaltej
Regular—30 Sept 2022
03
Doordarshan Kendra
Regular—30 Sept 2022
04
Gurukul Road
InterchangeAhmedabad BRTS30 Sept 2022
05
Gujarat University
Regular—30 Sept 2022
06
Commerce Six Road
Regular—30 Sept 2022
07
SP Stadium
Regular—30 Sept 2022
08
Old High Court
InterchangeRed Line (Line 2)30 Sept 2022
09
Shahpur
Regular—30 Sept 2022
10
Gheekanta
Regular—30 Sept 2022
11
Kalupur
InterchangeAhmedabad Junction (Indian Railways)30 Sept 2022
12
Kankaria East
RegularKankaria Lake Tourist Hub5 Mar 2024
13
Apparel Park
DepotApparel Park Depot4 Mar 2019
14
Amraiwadi
Regular—18 May 2019
15
Rabari Colony
InterchangeAhmedabad BRTS4 Mar 2019
16
Nirant Cross Road
Regular—4 Mar 2019
17
Vastral Gam
Terminal—4 Mar 2019
Geospatial Alignment

Ahmedabad Metro Blue Line (Line 1) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Ahmedabad Metro Blue Line (Line 1) Technical Specifications

ParameterValue
Estimated Cost₹10,773 Crores
Corridor TypeElevated (13 stations) & Underground (4 stations)
Primary DepotApparel Park Depot
Track GaugeStandard Gauge (1435 mm)
Total Length21.16 km
Opened / Est. Opening04 March 2019 (Priority) / 30 September 2022 (Full Line)
Corridor StatusFully Operational
Maximum Design Speed80 km/h
OperatorGujarat Metro Rail Corporation (GMRC) Limited
Stations Count17
Line NumberLine 1 (Blue Line)
Electrification System750V DC Third Rail
Chronological Milestones

Ahmedabad Metro Blue Line (Line 1) Timeline

2010

Gujarat Metro Rail Corporation (GMRC) incorporated to implement rapid transit.

2014

Union Cabinet sanctions Phase 1 (40.03 km) including 21.16 km Blue Line at ₹10,773 crore.

2019

PM Narendra Modi inaugurates 6.5 km Priority Section from Vastral Gam to Apparel Park on 4 March 2019.

2022

Phase-I was inaugurated on 30 September 2022; the East–West corridor became operational through the subsequent opening of its remaining section.

2024

Kankaria East station opened on 5 March 2024; Thaltej Gam extension opened on 8 December 2024.

Proprietary analytics

Ahmedabad Metro Blue Line (Line 1) Economic & Connectivity Impact

Economic Significance

Cuts east-west transit time between Thaltej and Vastral with frequent rapid transit service.

Employment Centres Served

Provides direct rapid transit to Gujarat University, commercial hubs along Drive-In Road, and industrial estates at Apparel Park.

Intermodal Connectivity

Provides direct transit integration with Indian Railways at Kalupur (Ahmedabad Junction).

Geospatial Explorer

Ahmedabad Metro Blue Line (Line 1) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 14.66 km | Underground: 6.50 km
Viaduct Length14.66 km
Tunnel Length6.5 km
River CrossingsNone
Major Bridges / CrossingsElevated Viaduct Crossings & Underground TBM Tunnels
Primary DepotApparel Park Depot (East Ahmedabad)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Ahmedabad Metro Blue Line is the East-West Corridor of Phase 1, running from Vastral Gam to Thaltej Gam. The corridor is 21.16 km long and has 17 stations.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Gujarat Dashboard →GJ
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement