Advertisement // Sponsor
Verified PartnerAhmedabad Metro Red Line (Line 2) Route Map, Stations & Status
The Ahmedabad Metro Red Line (Line 2: APMC – Motera Stadium) is an operational 18.87 km North-South rapid transit corridor connecting APMC (Vasna) in South Ahmedabad to Motera Stadium (Narendra Modi Cricket Stadium) in the North. Comprising 15 total stations (14 currently operational, with Sabarmati Railway Station under construction) along the central Ashram Road artery, Line 2 is constructed as a 100% elevated corridor. Prime Minister Narendra Modi inaugurated the complete North-South corridor on 30 September 2022, and commercial operations opened to the public on 6 October 2022. Operated by Gujarat Metro Rail Corporation (GMRC) Limited, the Red Line intersects with Line 1 (Blue Line) at the Old High Court interchange, connects directly to Indian Railways at Gandhigram, provides planned integrated connectivity in the AEC/Sabarmati area to the Sabarmati HSR Terminal, and seamlessly connects at Motera Stadium to the Phase 2 corridor toward Gandhinagar and GIFT City.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Ahmedabad Metro Red Line (Line 2) Economics
Ahmedabad Metro Red Line (Line 2) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | APMC | Terminal | — | 6 Oct 2022 |
| 02 | Jivraj Park | Regular | — | 6 Oct 2022 |
| 03 | Rajiv Nagar | Regular | — | 6 Oct 2022 |
| 04 | Shreyas | Regular | — | 6 Oct 2022 |
| 05 | Paldi | Regular | — | 6 Oct 2022 |
| 06 | Gandhigram | Interchange | Gandhigram Railway Station (WR) | 6 Oct 2022 |
| 07 | Old High Court | Interchange | Blue Line (Line 1 Interchange) | 6 Oct 2022 |
| 08 | Usmanpura | Regular | — | 6 Oct 2022 |
| 09 | Vijay Nagar | Regular | — | 6 Oct 2022 |
| 10 | Vadaj | Interchange | Ahmedabad BRTS | 6 Oct 2022 |
| 11 | Ranip | Interchange | Ahmedabad BRTS / GSRTC Ranip Bus Terminus | 6 Oct 2022 |
| 12 | Sabarmati Railway Station | Under construction / not operational | — | Under Construction |
| 13 | AEC | Regular | — | 6 Oct 2022 |
| 14 | Sabarmati | Regular | — | 6 Oct 2022 |
| 15 | Motera Stadium | Terminal | Yellow Line (Phase 2 corridor toward Gandhinagar/Mahatma Mandir) | 6 Oct 2022 |
Ahmedabad Metro Red Line (Line 2) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerAhmedabad Metro Red Line (Line 2) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹10,773 Crores |
| Corridor Type | 100% Elevated |
| Primary Depot | Gyaspur Depot (Vasna) |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 18.87 km |
| Opened / Est. Opening | inaugurated on 30 September 2022; opened to the public on 6 October 2022 |
| Corridor Status | Fully Operational |
| Maximum Design Speed | 80 km/h |
| Operator | Gujarat Metro Rail Corporation (GMRC) Limited |
| Stations Count | 15 (14 Operational, 1 Under Construction) |
| Line Number | Line 2 (Red Line) |
| Electrification System | 750V DC Third Rail |
Ahmedabad Metro Red Line (Line 2) Timeline
Gujarat Metro Rail Corporation (GMRC) incorporated to plan rapid transit for Ahmedabad-Gandhinagar.
Union Cabinet approved Phase 1 DPR (40.03 km combining Blue and Red Lines) at ₹10,773 Crores.
Civil construction awarded for North-South Corridor (APMC to Motera Stadium).
Viaduct erection completed across Ashram Road and alignment sections.
Prime Minister Narendra Modi inaugurated the 18.87 km Red Line on 30 September 2022; commercial operations opened to the public on 6 October 2022.
Phase 2 Yellow Line corridor inaugurated from Motera Stadium toward Gandhinagar and GIFT City.
Ahmedabad Metro Red Line (Line 2) Economic & Connectivity Impact
Economic Significance
Improves North-South transit time between APMC Vasna and Motera Stadium along the central Ashram Road arterial corridor.
Traffic Impact
Provides major relief to Ashram Road, Paldi, Usmanpura, and Vadaj commercial corridors by shifting commuters to high-capacity rail.
Employment Centres Served
Serves direct access to major commercial centers along Ashram Road, educational institutions, and government offices near Old High Court.
Intermodal Connectivity
Provides direct rapid transit to Narendra Modi Cricket Stadium (132k capacity). AEC/Sabarmati area provides planned integrated connectivity to Sabarmati HSR station, though Sabarmati Railway Metro station itself is non-operational.
Impact on Real Estate
Supports transit-oriented development along Ashram Road and connecting northern areas of Motera and Sabarmati.
Ahmedabad Metro Red Line (Line 2) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
