Verified PartnerAhmedabad Metro Airport Line Phase 2A: Route, Stations, Approval & Latest Update
The Ahmedabad Metro Airport Line (Phase 2A: Koteshwar Road – SVPI Airport) is an approved 6.032 km rapid transit corridor connecting the main Yellow Line network at Koteshwar Road directly to Sardar Vallabhbhai Patel International Airport (SVPIA). Spanning 5 new stations (4 elevated + 1 underground) across a 5.11 km elevated viaduct and a 0.92 km underground tunnel section beneath airport terminals, the ₹2,169.04 crore Phase 2A project provides direct airport rail transit. Approved by the Union Cabinet on 10 June 2026, GMRC has awarded geotechnical and detailed design consultancy packages as the project progresses toward construction.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Ahmedabad Metro Airport Line (Phase 2A) Economics
Expected Completion Date
Ahmedabad Metro Airport Line (Phase 2A) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Ashram Road | Regular | Ashram Road Commercial Corridor | Approved Phase 2A |
| 02 | Koteshwar Prachin Mandir | Regular | Koteshwar Ancient Temple Precinct | Approved Phase 2A |
| 03 | Sabarmati River | Regular | Sabarmati Riverfront Crossing | Approved Phase 2A |
| 04 | Sardar Nagar | Regular | Sardar Nagar Transit Hub | Approved Phase 2A |
| 05 | Ahmedabad Airport | Terminal | SVPI Airport Terminal Complex | Approved Phase 2A |
Ahmedabad Metro Airport Line (Phase 2A) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerAhmedabad Metro Airport Line (Phase 2A) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹1,800 Crores |
| Corridor Type | Elevated (5.11 km) & Underground (0.92 km) |
| Primary Depot | Indroda Depot / Gyaspur Depot |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 6.032 km |
| Opened / Est. Opening | Approved (Target ~4 Years from Cabinet Approval) |
| Corridor Status | Under Construction / Execution |
| Maximum Design Speed | 80 km/h |
| Operator | Gujarat Metro Rail Corporation (GMRC) Limited |
| Stations Count | 5 New Stations (4 Elevated + 1 Underground) |
| Line Number | Phase 2A (Airport Line) |
| Electrification System | 750V DC Third Rail |
Ahmedabad Metro Airport Line (Phase 2A) Timeline
GMRC submitted Phase 2A DPR for 6.032 km direct airport link from Koteshwar Road.
Union Cabinet approved the 6.032 km Phase-2A Airport Line at ₹2,169.04 crore on 10 June 2026.
GMRC awarded geotechnical investigation and detailed design consultancy (DDC) packages.
Ahmedabad Metro Airport Line (Phase 2A) Economic & Connectivity Impact
Economic Significance
Provides direct high-speed transit from Ahmedabad downtown and Gandhinagar Sachivalaya directly into SVPI Airport terminals.
Traffic Impact
Eliminates heavy vehicular drop-off congestion along Airport Road, Hansol Circle, and International Terminal gates.
Employment Centres Served
Serves airline personnel, airport hospitality workforce, and flight passengers.
Intermodal Connectivity
Seamless 1-transfer connection at Koteshwar Road to Motera Cricket Stadium, Sabarmati Bullet Train Terminal, and GIFT City.
Ahmedabad Metro Airport Line (Phase 2A) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.