Verified PartnerHyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Route Map, Stations & Status
The Hyderabad Metro Red Line Extension (Phase 2 Corridors VII & VIII) comprises two proposed elevated extensions totaling 20.5 km and 16 proposed stations along National Highway 65 (NH-65). Submitted under the Telangana State Government's ₹38,595 crore 122.9 km Phase II DPR for Government of India approval, the project encompasses two strategic suburban extensions: (1) Miyapur to Patancheru (13.4 km, 10 stations) serving the BHEL industrial township and Patancheru bus terminal, and (2) LB Nagar to Hayathnagar (7.1 km, 6 stations) connecting Vanasthalipuram, Autonagar, and Vijayawada Highway transit hubs.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Hyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Economics
Expected Completion Date
Hyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Miyapur | Operational Terminal | Red Line Corridor I Phase 1 | Operational |
| 02 | Miyapur X Roads (Proposed) | Proposed / Tentative Alignment | NH-65 Junction | Phase 2 |
| 03 | Silpa Park (Proposed) | Proposed / Tentative Alignment | Residential Node | Phase 2 |
| 04 | Aminpur X Roads (Proposed) | Proposed / Tentative Alignment | Suburban Node | Phase 2 |
| 05 | Miyapur Depot Area (Proposed) | Proposed / Tentative Alignment | Depot Access Node | Phase 2 |
| 06 | Beeramguda (Proposed) | Proposed / Tentative Alignment | Commercial Node | Phase 2 |
| 07 | RC Puram (Proposed) | Proposed / Tentative Alignment | Ramachandrapuram Market | Phase 2 |
| 08 | BHEL Junction (Proposed) | Proposed / Tentative Alignment | BHEL Township Gateway | Phase 2 |
| 09 | Patancheru Industrial Area (Proposed) | Proposed / Tentative Alignment | Industrial SEZ Node | Phase 2 |
| 10 | Patancheru Bus Terminal (Proposed) | Proposed / Tentative Terminal | Patancheru Bus Terminal | Phase 2 |
| 11 | LB Nagar | Operational Terminal | Red Line Corridor I Phase 1 | Operational |
| 12 | Chintalkunta (Proposed) | Proposed / Tentative Alignment | NH-65 Junction | Phase 2 |
| 13 | Vanasthalipuram (Proposed) | Proposed / Tentative Alignment | Residential Suburb Node | Phase 2 |
| 14 | Autonagar (Proposed) | Proposed / Tentative Alignment | Industrial & Goods Hub Link | Phase 2 |
| 15 | Lecturers' Colony (Proposed) | Proposed / Tentative Alignment | Residential Node | Phase 2 |
| 16 | RTC Colony (Proposed) | Proposed / Tentative Alignment | Suburban Node | Phase 2 |
| 17 | Hayathnagar (Proposed) | Proposed / Tentative Terminal | Vijayawada Highway Hub | Phase 2 |
Hyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerHyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | 6200.0 |
| Corridor Type | 100% Elevated Viaduct |
| Primary Depot | Miyapur Depot Expansion |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 20.5 km (Miyapur–Patancheru 13.4 km + LB Nagar–Hayathnagar 7.1 km) |
| Corridor Status | Proposed & Review Stages |
| Maximum Design Speed | 80 km/h |
| Operator | Telangana Government / Hyderabad Metro Rail Limited (HMRL) |
| Stations Count | 16 Proposed Stations (10 North-West + 6 East) |
| Line Number | Phase 2 Corridors VII & VIII (Red Line Extension) |
| Electrification System | 25kV 50Hz AC Overhead Catenary (OHE) |
| Government Monitoring Target | Phase 2 (Subject to Central Approval) |
Hyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Timeline
Phase-II plan finalized; DPRs for Miyapur–Patancheru and LB Nagar–Hayathnagar subsequently submitted as part of the 76.4-km Phase-II(A) proposal (HMRL Corridors VII & VIII)
122.9-km Phase-II DPR submitted to the Government of India; approval awaited
Hyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Economic & Connectivity Impact
Economic Significance
Extends Corridor I rapidly across both ends of National Highway 65, bringing 20.5 km of proposed mass transit to industrial workers and suburban commuters.
Traffic Impact
Aims to alleviate heavy traffic bottlenecking on the Mumbai-Hyderabad highway (Miyapur to Patancheru) and Vijayawada-Hyderabad highway (LB Nagar to Hayathnagar).
Employment Centres Served
Provides proposed rapid transit to major manufacturing complexes at BHEL Ramachandrapuram, Patancheru SEZ, and Autonagar industrial area.
Intermodal Connectivity
Provides continuous transit connectivity into Central Hyderabad (Ameerpet, Nampally, MGBS) from outer suburban perimeters.
Impact on Real Estate
Anticipated to drive commercial logistics and residential development along outer NH-65 highway stretches.
Hyderabad Metro Red Line Extension (Patancheru & Hayathnagar) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.