Verified PartnerHyderabad Metro Green Line (Line II) Route Map, Stations & Status
The Hyderabad Metro Green Line (Corridor II) is an 11.2 km fully elevated mass rapid transit corridor connecting Jubilee Bus Station (JBS) in Secunderabad to MG Bus Station (MGBS) in Central Hyderabad across 10 operational stations. Inaugurated on 7 February 2020, the line forms the primary North-South transit artery bridging the twin cities' key inter-state bus terminals. The Telangana Government holds 100% equity in Hyderabad Metro Rail Limited (HMRL) following the 2026 state takeover, while operations and maintenance are managed by L&TMRHL and Keolis. The Green Line features two major metro-to-metro interchanges at Parade Grounds (Line III Blue Line) and MG Bus Station (Line I Red Line). Operational timings are from 06:00 AM to 11:00 PM daily from terminal stations. Phase II Corridor VI — MGBS–Chandrayangutta, 7.5 km, 6 stations, under implementation.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Hyderabad Metro Green Line (Line II) Economics
Hyderabad Metro Green Line (Line II) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Jubilee Bus Station | Terminal | JBS TSRTC Inter-State Bus Terminal | 07 February 2020 |
| 02 | Parade Grounds | Major Metro Interchange | Line III Blue Line | 07 February 2020 |
| 03 | Secunderabad West | Regular | SCR Secunderabad Junction Railway Terminal Link | 07 February 2020 |
| 04 | Gandhi Hospital | Regular | Healthcare Complex Link | 07 February 2020 |
| 05 | Musheerabad | Regular | — | 07 February 2020 |
| 06 | RTC Cross Roads | Regular | — | 07 February 2020 |
| 07 | Chikkadpally | Regular | — | 07 February 2020 |
| 08 | Narayanguda | Regular | — | 07 February 2020 |
| 09 | Sultan Bazar | Regular | Commercial Precinct Node | 07 February 2020 |
| 10 | MG Bus Station | Terminal / Major Metro Interchange | Line I Red Line & MGBS TSRTC Bus Terminal | 07 February 2020 |
Hyderabad Metro Green Line (Line II) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerHyderabad Metro Green Line (Line II) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | 14172.0 |
| Corridor Type | 100% Elevated Viaduct |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 11.2 km |
| Opened / Est. Opening | 07 February 2020 (JBS to MGBS Stage 1) |
| Corridor Status | Fully Operational |
| Operating Timings / Hours | 06:00 AM – 11:00 PM (Daily from terminal stations) |
| Maximum Design Speed | 90 km/h (Design Speed) / 80 km/h (Maximum Operating Speed) |
| Operator | HMRL (100% Equity Owner) | L&TMRHL & Keolis (Operations & Maintenance) |
| Stations Count | 10 Operational Stations |
| Line Number | Corridor II (Green Line) |
| Electrification System | 25kV 50Hz AC Overhead Catenary (OHE) |
Hyderabad Metro Green Line (Line II) Timeline
Ground works for Hyderabad Metro Phase I commenced
Trial runs and safety inspections conducted ahead of commissioning
Green Line Stage 1 (JBS to MGBS, 11.2 km, 10 stations) inaugurated for commercial operations
HMRL signed the agreement to acquire 100% equity of LTMRHL. Operations shifted to state ownership from 1 May 2026
Corridor VI (MGBS–Chandrayangutta), 7.5 km with 6 stations; implementation/procurement underway
Hyderabad Metro Green Line (Line II) Economic & Connectivity Impact
Economic Significance
Connects Secunderabad directly to Central Hyderabad, providing rapid mass transit between Jubilee Bus Station (JBS) and Mahatma Gandhi Bus Station (MGBS).
Traffic Impact
Bridges Hyderabad's two main inter-state bus terminals (JBS & MGBS), providing high-frequency transit between Secunderabad and Central Hyderabad.
Employment Centres Served
Serves major educational institutions, hospitals (Gandhi Hospital), and retail markets across Chikkadpally, Narayanguda, and Sultan Bazar.
Intermodal Connectivity
Provides metro-to-metro transfers at Parade Grounds (Blue Line) and MG Bus Station (Red Line).
Hyderabad Metro Green Line (Line II) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.