Advertisement // Sponsor
Verified PartnerHyderabad Metro Blue Line (Line III) Route Map, Stations & Status
The Hyderabad Metro Blue Line (Corridor III) is a 29 km fully elevated mass rapid transit corridor connecting Nagole in eastern Hyderabad to Raidurg in Cyberabad HITEC City across 23 operational stations. Serving as the primary East-West transit corridor, the line features major metro-to-metro interchanges at Ameerpet (Line I Red Line) and Parade Grounds (Line II Green Line). The Telangana Government holds 100% equity in Hyderabad Metro Rail Limited (HMRL) following the 2026 state takeover, while operations and maintenance are managed by L&TMRHL and Keolis. Operational timings run from 06:00 AM to 11:00 PM daily from terminal stations.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Hyderabad Metro Blue Line (Line III) Economics
Hyderabad Metro Blue Line (Line III) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Nagole | Terminal / Depot Link | Uppal Depot Link | 29 November 2017 |
| 02 | Uppal | Regular | — | 29 November 2017 |
| 03 | Stadium | Regular | — | 29 November 2017 |
| 04 | NGRI | Regular | — | 29 November 2017 |
| 05 | Habsiguda | Regular | — | 29 November 2017 |
| 06 | Tarnaka | Regular | — | 29 November 2017 |
| 07 | Mettuguda | Regular | — | 29 November 2017 |
| 08 | Secunderabad East | Regular | SCR Secunderabad Junction Railway Station Link | 29 November 2017 |
| 09 | Parade Grounds | Major Metro Interchange | Line II Green Line & JBS Bus Terminal | 29 November 2017 |
| 10 | Paradise | Regular | — | 29 November 2017 |
| 11 | Rasoolpura | Regular | — | 29 November 2017 |
| 12 | Prakash Nagar | Regular | — | 29 November 2017 |
| 13 | Begumpet | Regular | SCR Begumpet Railway Station & MMTS Link | 29 November 2017 |
| 14 | Ameerpet | Major Metro Interchange | Line I Red Line | 29 November 2017 |
| 15 | Madhura Nagar | Regular | — | 20 March 2019 |
| 16 | Yusufguda | Regular | — | 20 March 2019 |
| 17 | Road No 5 Jubilee Hills | Regular | — | 20 March 2019 |
| 18 | Jubilee Hills Check Post | Regular | — | 20 March 2019 |
| 19 | Peddamma Gudi | Regular | — | 20 March 2019 |
| 20 | Madhapur | Regular | — | 20 March 2019 |
| 21 | Durgam Cheruvu | Regular | — | 20 March 2019 |
| 22 | HITEC City | Regular | Cyberabad IT Corridor Link | 20 March 2019 |
| 23 | Raidurg | Terminal | Financial District Node | 29 November 2019 |
Hyderabad Metro Blue Line (Line III) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerHyderabad Metro Blue Line (Line III) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | 14172.0 |
| Corridor Type | 100% Elevated Viaduct |
| Primary Depot | Uppal Depot / Main Depot & Workshop |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 29 km |
| Opened / Est. Opening | 29 November 2017 (Nagole–Mettuguda) / 20 March 2019 (Ameerpet–HITEC City) / 29 November 2019 (Raidurg) |
| Corridor Status | Fully Operational |
| Operating Timings / Hours | 06:00 AM – 11:00 PM (Daily from terminal stations) |
| Maximum Design Speed | 90 km/h (Design Speed) / 80 km/h (Maximum Operating Speed) |
| Operator | HMRL (100% Equity Owner) | L&TMRHL & Keolis (Operations & Maintenance) |
| Stations Count | 23 Operational Stations |
| Line Number | Corridor III (Blue Line) |
| Electrification System | 25kV 50Hz AC Overhead Catenary (OHE) |
Hyderabad Metro Blue Line (Line III) Timeline
Ground works for Hyderabad Metro Phase I commenced
Nagole–Mettuguda (8 km, 7 stations) opened for commercial operations
Ameerpet–HITEC City (10.5 km) opened for commercial operations
HITEC City–Raidurg (1.5 km) opened, completing Corridor III from Nagole to Raidurg
HMRL signed the agreement to acquire 100% equity of LTMRHL. Operations shifted to state ownership from 1 May 2026
Hyderabad Metro Blue Line (Line III) Economic & Connectivity Impact
Economic Significance
Connects eastern suburbs of Hyderabad at Nagole to the technology hubs of Cyberabad and HITEC City.
Traffic Impact
Serves heavy commuter volumes along the East-West arterial corridor, connecting Secunderabad, Begumpet, Ameerpet, and HITEC City.
Employment Centres Served
Connects major employment hubs across HITEC City, Mindspace IT Park, and Cyberabad.
Intermodal Connectivity
Provides transfers to metro-to-metro transfers at Ameerpet (Red Line) and Parade Grounds (Green Line), along with SCR rail links at Secunderabad East and Begumpet.
Hyderabad Metro Blue Line (Line III) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
