Verified PartnerHyderabad Metro Red Line (Line I) Route Map, Stations & Status
The Hyderabad Metro Red Line (Corridor I) is a 29 km fully elevated mass rapid transit corridor running from Miyapur in the north-west to LB Nagar in the south-east across 27 stations. Following the 2026 state takeover, the Telangana Government holds 100% equity in Hyderabad Metro Rail Limited (HMRL), while operations and maintenance are handled by L&TMRHL and Keolis. Serving key commercial and residential hubs, the Red Line features two major metro-to-metro interchange stations at Ameerpet (Line III Blue Line) and MGBS (Line II Green Line). Commuters can also access South Central Railway (SCR) MMTS suburban rail services at Bharat Nagar, Khairatabad, and Malakpet, as well as main line train services at Hyderabad Deccan Railway Station (Nampally). HMRL states that end-to-end travel from Miyapur to LB Nagar takes approximately 45 minutes. Operational timings are from 06:00 to 23:00 daily from terminal stations, with train frequencies between 3 to 7 minutes.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Hyderabad Metro Red Line (Line I) Economics
Hyderabad Metro Red Line (Line I) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Miyapur | Terminal / Depot Link | Miyapur Depot | 29 November 2017 |
| 02 | JNTU College | Regular | — | 29 November 2017 |
| 03 | KPHB Colony | Regular | — | 29 November 2017 |
| 04 | Kukatpally | Regular | — | 29 November 2017 |
| 05 | Balanagar | Regular | — | 29 November 2017 |
| 06 | Moosapet | Regular | — | 29 November 2017 |
| 07 | Bharat Nagar | Regular | SCR MMTS Suburban Rail Link | 29 November 2017 |
| 08 | Erragadda | Regular | — | 29 November 2017 |
| 09 | ESI Hospital | Regular | — | 29 November 2017 |
| 10 | SR Nagar | Regular | — | 29 November 2017 |
| 11 | Ameerpet | Major Metro Interchange | Line III Blue Line | 29 November 2017 |
| 12 | Punjagutta | Regular | — | 24 September 2018 |
| 13 | Irrum Manzil | Regular | — | 24 September 2018 |
| 14 | Khairatabad | Regular | SCR MMTS Suburban Rail Link | 24 September 2018 |
| 15 | Lakdikapul | Regular | — | 24 September 2018 |
| 16 | Assembly | Regular | — | 24 September 2018 |
| 17 | Nampally | Regular | Hyderabad Deccan Railway Station Link | 24 September 2018 |
| 18 | Gandhi Bhavan | Regular | — | 24 September 2018 |
| 19 | Osmania Medical College | Regular | — | 24 September 2018 |
| 20 | MGBS | Major Metro Interchange | Line II Green Line & TSRTC Bus Station | 24 September 2018 |
| 21 | Malakpet | Regular | SCR MMTS Suburban Rail Link | 24 September 2018 |
| 22 | New Market | Regular | — | 24 September 2018 |
| 23 | Musarambagh | Regular | — | 24 September 2018 |
| 24 | Dilsukhnagar | Regular | — | 24 September 2018 |
| 25 | Chaitanyapuri | Regular | — | 24 September 2018 |
| 26 | Victoria Memorial | Regular | — | 24 September 2018 |
| 27 | LB Nagar | Terminal | Vijayawada Highway Hub | 24 September 2018 |
Hyderabad Metro Red Line (Line I) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerHyderabad Metro Red Line (Line I) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | 14172.0 |
| Corridor Type | 100% Elevated Viaduct |
| Primary Depot | Miyapur Maintenance Depot (~100 acres) |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 29 km |
| Opened / Est. Opening | 29 November 2017 (Miyapur–Ameerpet) / 24 September 2018 (Ameerpet–LB Nagar) |
| Corridor Status | Fully Operational |
| Operating Timings / Hours | 06:00 to 23:00 (Daily from Miyapur and LB Nagar terminals) |
| Maximum Design Speed | 90 km/h (Design Speed) / 80 km/h (Maximum Operating Speed) |
| Operator | HMRL (100% Equity Owner) | L&TMRHL & Keolis (Operations & Maintenance) |
| Stations Count | 27 Stations |
| Line Number | Corridor I (Red Line) |
| Electrification System | 25kV 50Hz AC Overhead Catenary (OHE) |
Hyderabad Metro Red Line (Line I) Timeline
Ground works for Hyderabad Metro Phase I commenced
Trial runs commenced between Miyapur and SR Nagar
Priority section from Miyapur to Ameerpet (13 km, 11 stations) inaugurated for commercial operations
Remaining section from Ameerpet to LB Nagar (16 km, 16 stations) opened for commercial service
HMRL signed the agreement to acquire 100% equity of LTMRHL. Operations shifted to state ownership from 1 May 2026
Hyderabad Metro Red Line (Line I) Economic & Connectivity Impact
Economic Significance
According to HMRL, travel time from Miyapur to LB Nagar is covered in approximately 45 minutes by rapid transit.
Traffic Impact
Serves heavy commuter traffic along NH-65, relieving congestion across Kukatpally, Ameerpet, Punjagutta, and Dilsukhnagar.
Employment Centres Served
Connects dense residential hubs (KPHB, Kukatpally, Dilsukhnagar) directly to central commercial areas at Ameerpet, Punjagutta, and Nampally.
Intermodal Connectivity
Provides metro-to-metro transfers at Ameerpet (Blue Line) and MGBS (Green Line), along with rail connectivity at Nampally and MMTS suburban stations.
Hyderabad Metro Red Line (Line I) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.