METRO CORRIDOR DOSSIER // HYDERABAD-METRO-PHASE-3-CORRIDOR-1

Phase 3 Corridor I (RGIA - Bharat Future City) Route Map, Stations & Status

Proposed & Review Stages📏 39.6 km🚉 9 Stations Stations🏢 Telangana Government / Hyderabad Metro Rail Limited (HMRL)

Hyderabad Metro Phase 2B RGIA to Bharat Future City (Corridor IX) is a 39.6 km proposed metro corridor featuring 9 stations (1.5 km underground, 21 km elevated, and 17.1 km at-grade) with an estimated cost of ₹7,168 crore. Officially submitted on 21 June 2025 as part of the ₹19,579 crore, 86.1 km Phase 2B package (DPR approved by HAML Board on 8 May 2025). Originally submitted as Phase 2B Corridor IX; Telangana has subsequently sought its implementation as Phase III (May 2026 update).

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Phase 3 Corridor I (RGIA - Bharat Future City) Economics

Phase 3 Corridor I (RGIA - Bharat Future City) Economics

Total Investment₹7,168 crore (RGIA–Bharat Future City) — part of ₹19,579 crore, 86.1 km Phase 2B package
Primary BackersProposed State Government Equity & Central Government Model
Operator / ModelState Government Executed (HMRL)
Target Opening

Expected Completion Date

StatusProposed & Review Stages
Target Opening DateSubject to Government Approval
Station list

Phase 3 Corridor I (RGIA - Bharat Future City) Stations

#StationTypeInterchange / ConnectionOpened
01
RGIA
Proposed Underground TerminalCorridor IV Airport ExpressPhase 2B
02
Peddagolkonda
ProposedSuburban Expressway NodePhase 2B
03
Bahadoorguda
ProposedResidential NodePhase 2B
04
Tukkuguda
Proposed Major HubORR Exit 14 & Aerospace SEZPhase 2B
05
Raviryal
ProposedIndustrial Township NodePhase 2B
06
Kongarakalan
ProposedCommercial NodePhase 2B
07
Rachloor
ProposedGreenfield Corridor NodePhase 2B
08
Gummadavelli
ProposedGreenfield NodePhase 2B
09
Skills University (Bharat Future City)
Proposed TerminalTelangana Skill University & Net Zero HubPhase 2B
Geospatial Alignment

Phase 3 Corridor I (RGIA - Bharat Future City) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Phase 3 Corridor I (RGIA - Bharat Future City) Technical Specifications

ParameterValue
Estimated Cost9500.0
Corridor Type1.5 km Underground + 21 km Elevated + 17.1 km At-Grade
Primary DepotNo dedicated depot size specified in published summary
Track GaugeStandard Gauge (1435 mm)
Total Length39.6 km
Corridor StatusProposed & Review Stages
Maximum Design Speed80 km/h
OperatorTelangana Government / Hyderabad Metro Rail Limited (HMRL)
Stations Count9 Stations
Line NumberPhase 2B Corridor IX
Electrification System25kV 50Hz AC Overhead Catenary (OHE)
Government Monitoring TargetSubject to Government Approval
Chronological Milestones

Phase 3 Corridor I (RGIA - Bharat Future City) Timeline

8 May 2025

Phase 2B DPRs approved by HAML Board.

21 June 2025

Phase 2B proposal and DPRs submitted to Government of India.

Proprietary analytics

Phase 3 Corridor I (RGIA - Bharat Future City) Economic & Connectivity Impact

Economic Significance

Connects RGIA Airport to Bharat Future City (Skills University / Mucherla) across 39.6 km with 9 stations.

Traffic Impact

Provides high-capacity rapid transit connecting the airport terminal to southern industrial parks and Skills University.

Employment Centres Served

Serves students, researchers, and professionals at Telangana Skill University, Tukkuguda Aerospace Park, and Raviryal industrial hubs.

Intermodal Connectivity

Interchanges at RGIA Airport with Corridor IV (Airport Express).

Impact on Real Estate

Supports greenfield transit-oriented development along the 39.6 km corridor towards Skills University.

Geospatial Explorer

Phase 3 Corridor I (RGIA - Bharat Future City) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 21.0 km | Underground: 1.5 km | At-Grade: 17.1 km
Viaduct Length21.0 km
Tunnel Length1.5 km
Primary DepotNo dedicated depot size specified in published summary

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

Hyderabad Metro Phase 2B RGIA to Bharat Future City (Corridor IX / RGIA to Bharat Future City Metro) is a proposed 39.6 km 9-station metro corridor connecting RGIA Airport to Skills University (Bharat Future City).

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Telangana Dashboard →TS
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement