New Mumbai-Pune Greenfield Expressway: Route Map, Cost & Status

(नया मुंबई-पुणे ग्रीनफील्ड एक्सप्रेसवे)

The New Mumbai–Pune Greenfield Expressway is a proposed 130 km access-controlled 8-lane expressway corridor planned by NHAI to connect Chirle (Navi Mumbai / MTHL junction) directly to Pune (NH-48 ring road). Envisioned as an ultra high-speed relief route for the existing Mumbai–Pune Expressway, the alignment features extensive tunnels through the Western Ghats to deliver a flat-gradient ~1-hour transit time.

Project Status Update: Proposed & Review StagesThe National Highways Authority of India (NHAI PIU Pune) has invited tenders under RFP No. MHDIV-20020/288/2025-PIU Pune/302061 for DPR & Feasibility Report preparation for the ₹15,000 Cr estimated greenfield corridor (estimated cost, not a sanctioned budget).
Strategic Multi-Modal Integration AlertProposed connectivity linking Mumbai Trans Harbour Link (Atal Setu / MTHL) via NH-548A (Pagote–Chowk corridor) to the under-construction Pune Outer Ring Road at Shivare, intended to bypass internal city bottlenecks.
नवीन मुंबई–पुणे ग्रीनफील्ड एक्सप्रेसवे (New Mumbai Pune Expressway)
नवीन मुंबई–पुणे ग्रीनफील्ड एक्सप्रेसवे हा अटल सेतू (MTHL) आणि पुणे रिंग रोडला थेट जोडणारा 130 किमी लांबीचा 8-पदरी प्रस्तावित द्रुतगती महामार्ग आहे.
FEATURED PARTNER
ADVERTISEMENT
Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length
130 km(Proposed)
Estimated Cost
₹15,000 Cr(Est.)
Implementing Agency
NHAI(PIU Pune)
Current StatusProposed & Review Stages
Target Travel Time
~90 Mins(Projected)

New Mumbai-Pune Expressway DPR & Construction Status

The National Highways Authority of India (NHAI), functioning under the Ministry of Road Transport and Highways (MoRTH), has initiated planning for the New Mumbai–Pune Greenfield Expressway. On May 11, 2026, NHAI Project Implementation Unit (PIU) Pune invited open bids under Tender ID 2026_NHAI_277178_1 (Tender Ref: MHDIV-20020/288/2025-PIU Pune/302061) for Consultancy Services to prepare the Detailed Project Report (DPR) and Feasibility Report for this estimated ₹15,000 crore access-controlled corridor (estimated cost, not a sanctioned budget).

The existing 94.5 km Mumbai–Pune Expressway (Yashwantrao Chavan Expressway), operational since 2002, experiences heavy traffic volumes and recurring congestion points through Khandala Ghat and urban entry nodes.

Distinction from MSRDC Missing Link: This proposed 130 km NHAI greenfield corridor is entirely independent of MSRDC's 13.3 km Missing Link project (Khopoli to Kusgaon), which is a localized bypass on the existing 6-lane expressway. In contrast, the proposed New Greenfield Expressway is conceived as an 8-lane parallel arterial corridor designed with the objective of relieving traffic congestion on the existing corridor.

Under the scope of the DPR assignment, the alignment will undergo digital verification via the PM Gati Shakti National Master Plan Portal to ensure optimal multi-modal connectivity with the Mumbai Trans Harbour Link (Atal Setu), Jawaharlal Nehru Port (JNPA), Navi Mumbai International Airport (NMIA), the Virar-Alibaug Multi-Modal Corridor (VAMC), and the Pune Outer Ring Road.

Chowk to Shivare Expressway Route & Connectivity

The proposed Chowk–Shivare alignment is subject to DPR finalization and official approval.

The proposed 130 km greenfield corridor is currently under study across Raigad and Pune districts in Maharashtra. Under initial planning, the highway is proposed to originate near Chowk in Khalapur Taluka, Raigad District, where the Old Mumbai–Pune Highway (NH-48) intersects regional corridors. The proposed Chowk–Shivare alignment is subject to DPR finalization and official approval.

Under current planning, the project incorporates proposed connectivity via NH-548A (Pagote–Chowk corridor), allowing traffic crossing Mumbai's 21.8 km Atal Setu (MTHL) at Chirle to connect toward the proposed greenfield alignment near Chowk. In the vicinity of Chowk, it is also planned to interface with the proposed Virar-Alibaug Multi-Modal Corridor.

From Chowk, the proposed alignment traverses the foothills and plateau terrain of the Western Ghats (Sahyadri ranges), where potential engineering features such as tunnels and viaducts may be evaluated during the DPR study to address hilly gradients. The proposed southern terminus arrives at Shivare (Shivre) village near Khed Shivapur in Bhor Taluka, intersecting the under-construction Pune Outer Ring Road and connecting toward the upcoming Pune–Bengaluru Expressway. The proposed Chowk–Shivare alignment is subject to DPR finalization and official approval.

Key Strategic Nodes & Route Anchors
Chowk NodeRaigad Starting Point
Chirle / Atal SetuMTHL & JNPA Spur Link
Sahyadri TransitPotential Ghat Passage
Bhor FoothillsSouthern Approach
Shivare JunctionPune Ring Road Link
Khed ShivapurNH-48 Bengaluru Corridor

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Route Map

New Mumbai-Pune Greenfield Expressway Route Map

(नया मुंबई-पुणे एक्सप्रेसवे रूट मैप)
The proposed Chowk–Shivare alignment is subject to DPR finalization and official approval.

The interactive GIS map displays the indicative schematic alignment and proposed anchor points between Chowk (Raigad) and Shivare near Khed Shivapur (Pune). As the project is currently in the DPR consultancy tender stage, the red dotted line illustrates the proposed schematic corridor connection. Detailed ground-truthed centerline coordinates will be updated following final statutory gazette notification by NHAI.

Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Corridor Parameters

New Mumbai-Pune Greenfield Expressway Cost & Length

The technical specifications and alignment parameters outlined below reflect the official NHAI DPR consultancy procurement scope (Tender Ref: MHDIV-20020/288/2025-PIU Pune/302061). The project is proposed to high-speed access-controlled standards, with scope for advanced traffic management systems (ATMS), potential wildlife crossings, and modern tolling infrastructure to be detailed in the DPR.

ParameterTechnical Details
Project NameNew Mumbai–Pune Greenfield Expressway (Atal Setu to Pune Link)
Total LengthApprox. 130 km (8-Lane Proposed Access-Controlled Alignment)
Estimated Project Cost₹15,000 Crore (Estimated Cost — Not Sanctioned Budget)
Implementing AuthorityNational Highways Authority of India (NHAI) — PIU Pune
Starting PointChowk, Khalapur Taluka, Raigad (Junction with NH-48 & NH-548A)
Ending PointShivare (Shivre), Bhor Taluka, Pune District (Pune Ring Road Interchange)
Districts CoveredRaigad, Pune (Maharashtra)
Major Intersecting CorridorsMumbai Trans Harbour Link (Atal Setu), NH-548A, Pune Outer Ring Road, NH-48
Current Project PhaseDPR consultancy tender stage (RFP Invited May 2026)
Tender Reference IDMHDIV-20020/288/2025-PIU Pune/302061 (Tender ID: 2026_NHAI_277178_1)
Tolling SystemTolling system not yet officially confirmed.
Target Design SpeedDesign speed subject to DPR confirmation.
Targeted Travel Timeis projected to reduce travel time to approximately 90 minutes.

New Mumbai-Pune Expressway Completion Date

Project Stage: DPR Consultancy Tender StageOfficial completion date not yet announced. The project is currently at the DPR consultancy tender stage; consultant appointment and subsequent DPR preparation will precede statutory clearances and civil construction scheduling.

According to NHAI's Terms of Reference (TOR), the project execution framework is structured across four progressive phases:

  • Stage 1 (First 90 Days): Traffic surveys (axle load surveys and 30-year forecasting), LiDAR-based preliminary topographical surveys, and multi-criteria alignment validation through the PM Gati Shakti portal.
  • Stage 2 (DPR & Clearances): Geotechnical drilling, tunnel rock mechanics analysis, pavement design, and statutory environmental, forest, and CRZ clearances.
  • Stage 3 (Land Acquisition): Publication of gazette notifications under Section 3A, 3D, and 3G of the National Highways Act, 1956 across villages in Raigad and Pune districts.
  • Stage 4 (Civil Works & Construction): Competitive bidding on EPC / HAM / BOT (Toll) modes, with civil execution scheduled after statutory clearances.

Travel Time Reduction & Traffic Decongestion Impact

Under current travel conditions, travelling between Mumbai and Pune via the existing Mumbai–Pune Expressway (Yashwantrao Chavan Expressway) or Old Mumbai–Pune Highway (NH-48) frequently takes between 3 to 4.5 hours during peak weekend hours, holidays, and heavy commercial freight windows. Common pain points include toll plaza pileups, ghat bottle-necking, and entry bottlenecks around Kalamboli and Ravet.

With the New Mumbai–Pune Greenfield Expressway, the corridor is projected to reduce travel time to approximately 90 minutes. By potentially diverting long-haul freight traffic, container shipments from JNPA, and inter-city passenger traffic, this third high-speed corridor is expected to help decongest the Mumbai-Pune industrial belt, contribute to reduced logistics freight costs, and improve road safety.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

New Mumbai-Pune Expressway Latest News 2026

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Q&A

Frequently Asked Questions (FAQ)

The New Mumbai Pune Greenfield Expressway is a proposed highway corridor intended to improve connectivity between the Mumbai Metropolitan Region and Pune. The approximately 130 km route is planned to connect the Chowk area in Raigad district with the Shivare area near Pune. The project aims to provide an alternative high-speed road connection between the two regions. The final route, interchanges and village-level alignment should be confirmed through official project documents.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement