Advertisement // Sponsor

Verified Partner
Loading sponsor...

Pune Mumbai Expressway: Toll Charges, Route Map, Speed Limits & Status (2026)

Current StatusFully Operational
Total Length94.5 km
Car Toll Charges₹320 (Single Journey)
Speed Limit100 km/h (Plains) / 60 km/h (Ghats)
Missing Link StatusOpen (Vehicle Restrictions Apply)
Last VerifiedOctober 2026
The Yashwantrao Chavan Mumbai Pune Expressway is India's pioneer 94.5 km 6-lane access-controlled concrete toll expressway developed by MSRDC. Connecting Kalamboli in Navi Mumbai to Kiwale in Pune, the corridor features the newly opened 13.3 km 8-lane Missing Link bypass between Khopoli Exit and Kusgaon. The bypass is operational under initial vehicle-class restrictions, cutting route length by 6 km with an estimated 20–30 minutes saved.
FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length94.5 km
Estimated Cost
₹1,630 Cr + ₹6,695 Cr(Original + Missing Link)
Implementing AgencyMSRDC
Current StatusFully Operational
Completion Date
1 May 2026 (Missing Link)2002 (Mainline)

*Vehicle-class restrictions may apply to the Missing Link. Check the latest official traffic advisory.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Interactive Map

Pune Mumbai Expressway Route Map, Alignment & Major Interchanges

Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project Dossier & Status

Pune Mumbai Expressway Overview & Current Status (2026)

Verified Operational Overview

The Yashwantrao Chavan Mumbai Pune Expressway (widely searched as the Pune Mumbai Expressway) is India's pioneer 94.5-km 6-lane access-controlled concrete toll expressway developed by the Maharashtra State Road Development Corporation (MSRDC). Originating at Kalamboli Junction in Navi Mumbai (Raigad District) and terminating at Kiwale / Ravet Interchange in Pune District, the high-speed corridor links Maharashtra's two largest economic powerhouses.

The corridor is currently Operational (Vehicle-Class Restrictions Apply). On Maharashtra Day (1 May 2026), MSRDC opened the landmark 13.3 km 8-lane Missing Link bypass between Khopoli Exit and Kusgaon. By replacing the 19.8 km winding Khandala Ghat section, the bypass shortens the route by 6 km and yields an estimated 20–30 minutes saved for permitted passenger vehicles.

The expressway forms the vital spine of Maharashtra's intercity transport network, integrating with the upcoming Pune Ring Road at Urse and Kiwale, feeder corridors to the Mumbai Coastal Road and Atal Setu via Kalamboli, the future Pune Bengaluru Expressway, and the multimodal connectivity hub of the Virar Alibaug Multimodal Corridor near Chowk interchange.

Major Interchanges & Key Alignment Nodes:
📍Kalamboli Junction (Navi Mumbai / Raigad)
📍Kon (Panvel Interchange)
📍Shedung Interchange
📍Chowk Interchange (MTHL / Multimodal Corridor Connector)
📍Khalapur Toll Plaza (km 32.5)
📍Khopoli Exit
📍Missing Link 8.87 km Twin Tunnels
📍Tiger Valley Cable-Stayed Bridge (184 m Structural Height) & 950 m Viaduct-I
📍Khandala & Lonavala Ghat
📍Kusgaon / Sinhagad Interchange
📍Talegaon / Urse Toll Plaza (km 83.0)
📍Somatane Phata Interchange
📍Dehu Road Junction
📍Kiwale / Ravet Interchange (Pune District)
Official Tariff (2026)

Pune Mumbai Expressway Toll Rates & Charges for Cars, Buses & Trucks

Notified by Maharashtra PWD & MSRDC
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single trip, return journey discounts, monthly pass tariffs, and per km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price →
Traffic Enforcement & ITMS

Pune Mumbai Expressway Speed Limits & Traffic Rules

Notified by Maharashtra Highway Police
Vehicle Classification (MoRTH)Plain ExpresswayGhat Section (km 35.5 - 52.0)Enforcement Mechanism
Passenger Cars & SUVs (M1 Category, ≤ 8 seats)100 km/h60 km/hITMS gantry radars & sectional ANPR camera tracking
Commercial Goods Carriers & Trucks (N2 / N3)80 km/h40 km/hMandatory left-lane discipline AI cameras & radar guns
Heavy Passenger Buses (M2 / M3 Categories)80 km/h40 km/hSpeed governor checks & designated bus lane monitoring
*Enforcement Note: Automated ITMS e-challans issued for sectional over-speeding and lane indiscipline.⟵ Swipe table ⟶
Speed Enforcement Architecture

The 37-Minute Calculation: Historical Rule vs. ITMS

Traversing the ~50.5 km distance between Khalapur and Urse toll plazas in 37 minutes corresponds to an average speed of approximately 81 km/h (50.5 km ÷ 0.617 hr). In July 2020, Maharashtra Highway Police introduced this benchmark because the corridor combines a 100 km/h plain section and a 50–60 km/h ghat section—meaning an average above 81 km/h indicated speeding on either the plain or ghat stretch.

Under current operations, enforcement has transitioned from manual toll receipt timestamps to the automated Intelligent Traffic Management System (ITMS), which uses AI-powered gantry radars and ANPR cameras every 10–12 km to issue instant electronic over-speeding challans.

EXPRESSWAY CONNECTIVITY & BENEFITS

Pune Mumbai Expressway: Connectivity, Travel Benefits & Infrastructure

The Pune Mumbai Expressway is a major transport corridor connecting Pune and the Mumbai Metropolitan Region. It supports intercity travel, regional accessibility, commercial activity, and connectivity between two of Maharashtra's important economic centres.

Developed by the Maharashtra State Road Development Corporation (MSRDC), the expressway features access-controlled infrastructure, interchanges, and modern traffic management systems. Ongoing infrastructure improvements strengthen corridor efficiency and long-term connectivity.

The Mumbai Pune Expressway Missing Link project is designed to improve connectivity through the Western Ghats by providing an alternative alignment to the existing ghat section. Its tunnels and bridge infrastructure aim to improve travel efficiency and route reliability.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Engineering Blueprint

Pune Mumbai Expressway Length, Cost & Technical Details

Corridor Specifications & Parameters
ParameterTechnical Specification
Official Project NameYashwantrao Chavan Mumbai Pune Expressway (Pune Mumbai Expressway)
Total Corridor Length94.5 km Mainline (13.3 km Missing Link bypass replaces 19.8 km ghat section, shortening overall route by 6 km)
Toll Tariff (Car / LMV)₹320 (Single journey, Car/LMV); FASTag mandatory; MH EV exemption applies (see Toll Rates section)
Speed Regulations100 km/h (Plains) / 60 km/h (Ghats) for Cars; 80 / 40 km/h for Heavy Vehicles; ITMS enforced (see Speed Limits section)
Bypass Infrastructure13.3 km 8-lane Missing Link (1.68 km & 8.87 km tunnels, 184 m high bridge, 950 m viaduct-I, estimated 20–30 min saved)
Estimated CostOriginal expressway: ₹1,630 crore; Missing Link: ₹6,695 crore (Combined historical project outlay: ₹8,325 crore)
Implementing AuthorityMSRDC
Corridor Width / RoW6-lane access-controlled mainline (approx. 100 m RoW) + 8-lane Missing Link section
Corridor Start PointKalamboli Junction (Navi Mumbai / Raigad District)
Corridor End PointKiwale / Ravet Interchange (Pune District)
Development ModelBOT / TOT Concession (IRB Infrastructure Developers) + EPC Mode (Missing Link)
Current Project StatusFully Operational
Commercial Commissioning / Completion1 May 2026 (Missing Link Bypass) | 2002 (Mainline)

Chronological Milestones (1997 – 2026)

1997PLANNING

Project Sanctioned & MSRDC Mandate

Government of Maharashtra appointed the Maharashtra State Road Development Corporation (MSRDC) on a Build-Operate-Transfer (BOT) basis to execute India's first 6-lane concrete access-controlled expressway.

1998EXECUTION

Civil Construction Commencement

Physical ground-breaking and heavy civil works launched across four construction sections, mobilizing global road-laying equipment to cast rigid pavement concrete carriageways.

2000EXECUTION

Partial Section Commissioning

The initial 36 km operational segment between Kon (near Panvel) and Khopoli opened for commercial traffic, demonstrating massive transit time savings over the old NH-4 highway.

2002EXECUTION

Full Expressway Inauguration

The complete 94.5 km high-speed corridor was formally dedicated to the nation by Prime Minister Atal Bihari Vajpayee, establishing rapid 2-hour connectivity between Mumbai and Pune.

2019EXECUTION

Missing Link Project Award

MSRDC awarded the 13.3 km 8-lane Missing Link bypass contracts under EPC mode to Navayuga Engineering Company (Package-I: 1.68 km & 8.87 km Tunnels) and Afcons Infrastructure (Package-II: 650 m Cable-Stayed Bridge with 184 m structural height & 950 m Viaduct-I) to bypass the Khandala Ghat bottlenecks.

2024EXECUTION

Breakthrough of World's Widest Tunnels

Engineers achieved breakthrough on the twin 8.87 km tunnels beneath Lonavala Lake, establishing record 21.61-meter cross-sectional road tunnel excavation spans without surface disturbance.

1 May 2026EXECUTION

Missing Link Inauguration

The 13.3 km 8-lane Missing Link bypass formally opened to vehicular traffic on Maharashtra Day (1 May 2026), eliminating steep hairpin curves on Khandala Ghat with an estimated 20–30 minutes saved for passenger vehicles under initial vehicle-class restrictions.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Frequently Asked Questions

Pune Mumbai Expressway FAQs

The Pune Mumbai Expressway, officially known as the Yashwantrao Chavan Mumbai Pune Expressway, connects Kalamboli near Panvel with the Kiwale / Dehu Road end near Pune. The 94.5 km access-controlled highway passes through the Khalapur and Lonavala–Khandala region. The newer 13.3 km Missing Link provides an alternative route between the Khopoli exit and Kusgaon areas, bypassing the existing ghat section.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement