Advertisement // Sponsor
Verified PartnerKochi Metro & Water Metro: Route Map, Stations, Phase 2 & Latest Update (2026)
The Kochi Metro is an operational rapid transit system serving the port city of Kochi, Kerala. Spanning over 28 km from Aluva to Thripunithura Railway Station across 25 elevated stations, it is expanding via the Phase 2 Pink Line connecting JLN Stadium to Kakkanad InfoPark.
"The Kochi Metro project in India has seen significant developments recently despite recent controversies over renaming suggestions. Initially, Kerala CM V D Satheesan ruled out renaming the metro after a proposal by KMRL (Kochi Metro Rail Limited). The proposed naming change would make it "Keralam Metro," emphasizing KMRL's role in urban transport and related projects across the state. Meanwhile, KMRL has completed the first phase from Aluva to Tripunithura, which is operating at a profit. Additionally, the second phase of the metro line from JLN Stadium to Smart City is under development by KMRL. While there have been discussions about renaming and operational improvements, the construction milestones including successful completion phases continue to progress with KMRL's expansion in urban transport projects across Kerala."
കൊച്ചി മെട്രോ റെയിൽ (Kochi Metro)
കൊച്ചി നഗരത്തിലെ പ്രധാന പൊതുഗതാഗത സംവിധാനമായ കൊച്ചി മെട്രോ നിലവിൽ ആലുവ മുതൽ തൃപ്പൂണിത്തുറ വരെ സർവീസ് നടത്തുന്നു. ജെ.എൽ.എൻ സ്റ്റേഡിയം മുതൽ കാക്കനാട് ഇൻഫോപാർക്ക് വരെയുള്ള രണ്ടാം ഘട്ട പിങ്ക് ലൈൻ നിർമ്മാണം പുരോഗമിക്കുന്നു.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Kochi Metro & Water Metro Route Maps
View and download the latest Kochi Metro and Kochi Water Metro route maps, station locations, terminals, Phase 2 alignment and operational routes.
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerKochi MetroCost • Route • Timeline
| Parameter | Kochi Metro | Kochi Water Metro |
|---|---|---|
| Network Length | 28.1 km (Phase 1) + 11.2 km (Phase 2) | 76 km planned |
| Stations / Terminals | 25 operational (11 planned for Phase 2) | 38 terminals planned (10+ operational) |
| Current Status | Operational + Phase 2 Extension | Operational + Expansion |
| Implementing Agency | KMRL | KMRL / KWML |
Advertisement // Sponsor
Verified PartnerLatest Kochi Metro News & Updates
Kochi Metro Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
Kochi Metro is the rapid transit system serving Kochi and the wider Ernakulam urban area in Kerala. It is operated by Kochi Metro Rail Limited (KMRL), a joint venture of the Government of India and Government of Kerala.
The operational Kochi Metro route runs from Aluva in the north to Tripunithura in the east through major locations including Kalamassery, Edappally, Palarivattom, Kaloor, MG Road, Maharajas College, Ernakulam South and Vyttila. The current operational corridor is about 28 km long.
The Kochi Metro route map shows the operational Aluva–Tripunithura corridor and its 25 stations. KMRL also provides an integrated public transport map covering metro, Water Metro and feeder services.
Kochi Metro currently has 25 operational metro stations from Aluva to Tripunithura. The operational corridor covers approximately 28 km.
The operational Kochi Metro stations from Aluva to Tripunithura are Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University, Pathadipalam, Edappally, Changampuzha Park, Palarivattom, JLN Stadium, Kaloor, Town Hall, M.G. Road, Maharajas College, Ernakulam South, Kadavanthra, Elamkulam, Vyttila, Thaikoodam, Petta, Vadakkekotta, SN Junction and Tripunithura.
Kochi Metro uses a distance-based fare system. Current fares range from ₹10 for the shortest journeys to ₹60 for journeys beyond 20 km. KMRL's official fare chart should be checked for the applicable fare, discounts and ticket type.
The minimum Kochi Metro fare is ₹10 for journeys of up to 2 km.
Kochi Metro ticket prices depend on journey distance, with the current standard fare ranging from ₹10 to ₹60. Passengers can use QR tickets, RFID or smart-card based ticketing options.
Kochi Metro supports digital ticketing, including QR-based tickets. Passengers can use KMRL's official digital ticketing options and the Kochi Metro app or other officially supported channels to purchase tickets before or during their journey.
Yes. Kochi Metro provides official digital services for journey planning and ticketing. Passengers should use the current KMRL-authorized app and ticketing channels rather than unofficial applications.
Kochi Metro services generally operate from around 6:00 AM to 11:00 PM on the Aluva–Tripunithura corridor. KMRL's current timetable specifies 06:00–23:00 service on Monday to Saturday, with Sunday services starting at 07:30 AM.
The current KMRL timetable lists 11:00 PM as the service end time for trains between Aluva and Tripunithura. Timings can vary by day and operating conditions, so passengers should check KMRL's timetable before late-night travel.
Kochi Metro services start at 6:00 AM on Monday to Saturday on the Aluva–Tripunithura route. On Sundays, services start at 7:30 AM according to the current KMRL timetable.
KMRL publishes the Kochi Metro timetable with service hours and train frequency. From 17 February 2026, Monday-to-Saturday peak headway is about 7 minutes 13 seconds, while non-peak headway is about 8 minutes 30 seconds.
The Aluva–Tripunithura route is a direct metro journey with no interchange. It passes through 25 stations: Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University, Pathadipalam, Edappally, Changampuzha Park, Palarivattom, JLN Stadium, Kaloor, Town Hall, M.G. Road, Maharajas College, Ernakulam South, Kadavanthra, Elamkulam, Vyttila, Thaikoodam, Petta, Vadakkekotta, SN Junction and Tripunithura.
Kochi Metro Phase II is an 11.2 km extension from JLN Stadium to Infopark via Kakkanad, with 11 planned stations. It is intended to connect major employment and passenger hubs including Kakkanad, CSEZ, KINFRA, SmartCity and Infopark.
Kochi Metro Phase II is under construction. The project has received Central Cabinet approval, and KMRL continues to issue construction and station-related tenders for the JLN Stadium–Infopark corridor.
Kochi Metro Phase III is currently planned as an extension from Aluva to Angamaly. KMRL classifies Aluva–Angamaly as a planned future phase; the final detailed route, station configuration and implementation schedule should not be treated as finalized until formally approved.
Kochi Metro's operational network currently runs from Aluva to Tripunithura, while Phase II construction is progressing toward Infopark via Kakkanad. KMRL is also planning the Aluva–Angamaly Phase III extension and continues to publish tenders, service updates and project information through its official channels.
Kochi Metro Rail Limited, or KMRL, is the company responsible for developing and operating Kochi Metro. It is a joint venture of the Government of India and Government of Kerala.
KMRL periodically publishes recruitment notifications for positions across operations, engineering, finance, human resources and other functions. Vacancies should be checked on the official KMRL careers portal because application dates and eligibility vary by notification. As of September 2026, the official careers page shows no open vacancies, while several recent 2026 recruitments are listed as under process.
Kochi Metro job applications must be made according to the instructions in the specific KMRL recruitment notification. KMRL publishes official vacancies, eligibility requirements and application procedures on its careers portal and warns applicants against fake recruitment offers circulated through social media or unofficial agencies.
Kochi Metro supports bicycle-friendly mobility and has promoted cycling as part of its integrated public transport approach. Bicycle-related access and carriage rules can depend on current station and service regulations, so passengers should check KMRL's latest instructions before taking a bicycle on a train.
Kochi Metro offers passenger ticketing and pass products through KMRL's fare and ticketing system. The availability and terms of day, monthly, season or other pass products can change, so passengers should check the current official KMRL fare and offers information before purchasing.
Kochi Metro has supported digital and QR-based ticketing, including WhatsApp-based ticketing services. Passengers should use the current number and booking procedure published by KMRL rather than relying on outdated third-party information.
Related Infrastructure Projects
Vizhinjam International Seaport
A deep-water multipurpose international seaport being constructed as India's premier transshipment hub.
View Project →Aroor Thuravoor Cochin Elevated Highway
A major 12.75 km four-lane access-controlled elevated corridor on NH-66 to bypass the congested Aroor-Thuravoor stretch in Kerala.
View Project →Thiruvananthapuram Outer Ring Road (NH-866)
A 62.7 km 4-lane access-controlled greenfield ring highway (NH-866, ₹8,004.72 Cr NHAI tender value) connecting Navaikulam to Vizhinjam via Kilimanoor, Thekkada, and Nedumangad.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
