Advertisement // Sponsor

Verified Partner
Loading sponsor...
CORRIDOR DOSSIER INDEX // THIRUVANANTHAPURAM-OUTER-RING-ROAD

Thiruvananthapuram Outer Ring Road Route Map, Status & Latest Updates (2026)

Last Updated: September 2026
StatusTendering & Land Acquisition Stage
Length62.7 km
Open Sections0 km (Tendering / Pre-construction)
Completion1,095 Days Construction Period
Last UpdatedSep 2026
The Thiruvananthapuram Outer Ring Road (NH-866) is an active 62.7 km four-lane greenfield expressway connecting Navaikulam to Vizhinjam under NHAI BOT concession with a 1,095-day construction period.

The Thiruvananthapuram Outer Ring Road (NH-866) is an access-controlled 62.7 km long, 4-lane greenfield ring highway project by NHAI at an approved outlay of ₹8,004.72 crore. Stretching from Navaikulam on NH-66 in the north to the Vizhinjam International Seaport in the south via Kilimanoor, Thekkada, Nedumangad, and Kattakada.

Project Summary

"The Thiruvananthapuram Outer Ring Road (NH-866) is a 62.7-km four-lane access-controlled greenfield highway corridor connecting Navaikulam (NH-66) to Vizhinjam in Kerala. Tendered by NHAI under BOT (Toll) mode at ₹8,004.72 crore tender value with a 1,095-day construction period, co-funded with ₹3,200 crore Kerala Government land acquisition across 24 villages."

തിരുവനന്തപുരം ഔട്ടർ റിംഗ് റോഡ് (NH-866 - 62.7 km)

തിരുവനന്തപുരം നഗരത്തിന്റെ വളർച്ചയ്ക്ക് വേഗത പകരുന്ന 62.7 കിമീ ഔട്ടർ റിംഗ് റോഡ് (NH-866) നാവായിക്കുളം മുതൽ വിഴിഞ്ഞം തുറമുഖം വരെ നിർമ്മിക്കുന്ന ഗ്രീൻഫീൽഡ് ഹൈവേ പദ്ധതിയാണ്.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length62.7 km
Estimated Cost₹8,004.72 Crore (NHAI Tender Value)
Implementing AgencyNHAI / State Highway Authority
Current StatusTendering & Land Acquisition Stage
Completion Target1,095 Days Construction Period
Route Map

Thiruvananthapuram Outer Ring Road (NH-866) Route Map & Alignment

View and download the latest Thiruvananthapuram Outer Ring Road route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameThiruvananthapuram Outer Ring Road
Total Length62.7 km
Estimated Cost₹8,004.72 Crore (NHAI Tender Value)
Current StatusTendering & Land Acquisition Stage
Project Parameters & Technical Details

Thiruvananthapuram Outer Ring Road Technical Specs & Project Parameters

ParameterTechnical Specification
Project NameThiruvananthapuram Outer Ring Road (National Highway 866 / NH-866)
Total Length62.7 km (4-Lane Access-Controlled Greenfield Ring Highway)
Current StatusTendering & Land Acquisition Stage
Estimated Cost₹8,004.72 Crore (NHAI Tender Value)
Development ModelBuild-Operate-Transfer (BOT - Toll) under Bharatmala / NHAI
Target Completion1,095 Days Construction Period
Corridor End PointVizhinjam International Seaport (Ch. 62.700)
Corridor Start PointNavaikulam (NH-66 Junction, Ch. 0.000)
Implementing AuthorityNHAI / State Highway Authority

Corridor Alignment & Engineering Features

Corridor Alignment & Key Nodes

The 62.7-km ring corridor initiates at Navaikulam on NH-66 and sweeps circumferentially around the Thiruvananthapuram metropolitan area via Kilimanoor, Thekkada (SH-1 MC Road junction), Mangalapuram / Pothanicode link, Nedumangad, Kattakada, and Balaramapuram, providing a direct dedicated conduit into Vizhinjam. The highway features a 4-lane access-controlled dual carriageway, grade-separated trumpet interchanges, tunnels, and dedicated service roads.

Vizhinjam Port Connectivity & Freight Logistics

As a critical logistic backbone for South India, NH-866 directly bypasses congested municipal corridors of Thiruvananthapuram city, enabling heavy container freight from Vizhinjam to transition rapidly to national logistics routes (NH-66, MC Road, and interstate freight channels toward Tamil Nadu and Central Kerala).

Tender Framework & Implementation Model

Received final PPPAC approval in March 2026 (140th PPPAC meeting on 9 March 2026). The NHAI has invited open competitive bids under a Build-Operate-Transfer (BOT - Toll) concession model valued at ₹8,004.72 crore for the complete 62.7 km length from Navaikulam to Vizhinjam with a 1,095-day construction period. The construction tender submission deadline is 7 October 2026, 11:00 AM, with technical bid opening on 8 October 2026, 11:30 AM.

Land Acquisition & State Participation

The Government of Kerala has sanctioned ₹3,200 crore for land acquisition across 24 villages along the alignment. Land has already been acquired in 11 villages (~100 ha), with acquisition ongoing across the remaining 13 villages (~200 ha).

Key Alignment Interchanges & Nodes Covered:
📍 Navaikulam (NH-66 Junction / Ch. 0.000)📍 Kilimanoor📍 Thekkada (SH-1 MC Road Intersection)📍 Mangalapuram / Pothanicode Link📍 Nedumangad📍 Kattakada📍 Balaramapuram (NH-66 South Intersection)📍 Vizhinjam International Seaport (Ch. 62.700)

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Thiruvananthapuram Outer Ring Road News

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
Project Schedule

Thiruvananthapuram Outer Ring Road Timeline & Milestones

Jan 2024

State Land Acquisition Sanction

Government of Kerala sanctioned ₹3,200 crore towards land acquisition across 24 villages along the 62.7-km corridor alignment.

9 March 2026

Final PPPAC Approval

The Public Private Partnership Appraisal Committee (140th PPPAC meeting) granted final approval for executing the 62.7-km 4-lane NH-866 corridor under Build-Operate-Transfer (BOT - Toll) mode at ₹8,004.72 crore tender value.

August 2026

Environmental Clearance Obtained / Recommended

Environmental Clearance was obtained / recommended for the 62.7-km greenfield ring highway corridor.

7 Oct 2026

Tender Submission Deadline

Scheduled closing deadline (11:00 AM) for submission of bids under the active ₹8,004.72 crore NHAI BOT construction tender with a 1,095-day period of work.

8 Oct 2026

Technical Bid Opening

Scheduled opening of technical bids (11:30 AM) for the 62.7-km four-lane Navaikulam to Vizhinjam construction contract.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Thiruvananthapuram Outer Ring Road (NH-866) FAQs

The Thiruvananthapuram Outer Ring Road is a 62.7-km four-lane NH-866 corridor connecting Navaikulam to Vizhinjam in Kerala.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Kerala Dashboard →KL
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement