Verified PartnerAroor Thuravoor Elevated Highway: Route Map, Latest Update & Status (2026)
The Aroor Thuravoor Cochin Elevated Highway is a 12.75 km 6-lane elevated highway under construction on National Highway 66 in the Alappuzha district of Kerala. Executed by NHAI at an estimated civil cost of ₹1,668 crore, it represents the longest elevated highway structure in Kerala, eliminating chronic traffic congestion on the Kochi–Alappuzha coastal artery.
"The 'Aroor Thuravoor Cochin Elevated Highway' project has seen significant progress with structural works nearly complete by October 15th as per the latest updates. The NHAI-KSEB standoff seems to have resolved, with work resuming soon on this ambitious 6-lane elevated highway which will connect Aroor and Thuravoor sections of NH-66 in Kerala. As of recent notifications, eight-lane expansion is also planned for the project. Land acquisition remains a key operational challenge but overall construction operations are moving ahead on schedule."
അരൂർ–തുറവൂർ എലിവേറ്റഡ് ഹൈവേ (NH-66)
ദേശീയപാത 66-ൽ അരൂർ മുതൽ തുറവൂർ വരെ നിർമ്മിക്കുന്ന 12.75 കിലോമീറ്റർ നീളമുള്ള ആറുവരി എലിവേറ്റഡ് ഹൈവേ കേരളത്തിലെ ഏറ്റവും നീളം കൂടിയ ആകാശപാതയാണ്. കൊച്ചി–ആലപ്പുഴ റൂട്ടിലെ രൂക്ഷമായ ഗതാഗതക്കുരുക്കിന് ഇത് ശാശ്വത പരിಹാരമാകും.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Aroor Thuravoor Elevated Highway Route Map & Alignment
View and download the latest Aroor Thuravoor Cochin Elevated Highway route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerAroor Thuravoor Cochin Elevated HighwayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Project Name | Aroor Thuravoor Cochin Elevated Highway |
| Total Length | 12.75 km |
| Estimated Cost | ₹1,668 Crore |
| Expected Completion Date | 2027 (Under Construction) |
| Total Packages | 1 Package |
Advertisement // Sponsor
Verified PartnerLatest Aroor Thuravoor Elevated Highway Updates
Aroor Thuravoor Elevated Highway Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Aroor–Thuravoor project is a six-lane elevated highway being developed on NH 66 between Aroor and Thuravoor Thekku in Kerala. It is part of the NH 66 development works and is intended to carry through traffic above the existing road corridor, reducing congestion through the Aroor–Thuravoor section.
The Aroor Thuravoor highway follows the existing NH 66 corridor between Aroor and Thuravoor Thekku. The elevated structure runs along the existing highway corridor, with approach roads, ramps and associated ground-level works connecting the elevated section to the surrounding road network.
The Aroor Thuravoor map represents the NH 66 corridor between Aroor and Thuravoor Thekku, including the elevated six-lane structure, ramps and approach-road connections. The project is an elevated improvement of the existing NH 66 corridor rather than a separate greenfield highway alignment.
The officially recorded Aroor–Thuravoor Thekku project length is 12.75 km. Recent construction reports refer to approximately 25.25 km of elevated carriageway when both directions are counted, while design modifications have also extended certain structural works. These figures should not be interpreted as a 25.25-km single-direction route.
The current Government of India project-monitoring record lists the Aroor–Thuravoor Thekku project at a revised cost of ₹2,382.83 crore. The monitoring record separately shows an original project cost of about ₹2,430 crore. The ₹2,382.83 crore figure is the appropriate current project-cost figure for the page.
The Aroor Thuravoor construction is in its final stage. The final concrete girder, the 2,566th girder, was installed in August 2026. By September 15, 2026, tarring had reached about 60% of the elevated carriageway, while final structural and approach-road works were continuing.
The latest September 2026 update is that about 60% of the tarring work has been completed across the elevated carriageway. Final slab concreting was also being completed in September, following installation of the final girder in August. Some remaining work near Aroor has been affected by the shifting of an overhead 11 kV power line.
The project was delayed by construction-related incidents, adverse weather and utility-shifting requirements. In particular, delays in shifting overhead electricity infrastructure near Aroor affected several structural spans. The project originally had a 2026 completion schedule but subsequently required additional time for structural and finishing works.
The Aroor Thuravoor elevated highway is designed as a six-lane elevated corridor. The existing road below continues to serve local and access traffic, with ramps and approach roads connecting the elevated highway to the surrounding NH 66 network.
The original completion schedule has been delayed. NHAI officials indicated that the remaining primary structural works were targeted for completion by October 15, 2026, while the latest Government of India project-monitoring record gives December 7, 2026 as the current monitored completion date. Final paving, safety installations and associated approach works still need to be completed before opening.
Related Infrastructure Projects
Kochi Metro
A rapid transit system serving Kochi, currently constructing the Phase 2 Pink Line Kakkanad extension.
View Project →Vizhinjam International Seaport
A deep-water multipurpose international seaport being constructed as India's premier transshipment hub.
View Project →Thiruvananthapuram Outer Ring Road (NH-866)
A 62.7 km 4-lane access-controlled greenfield ring highway (NH-866, ₹8,004.72 Cr NHAI tender value) connecting Navaikulam to Vizhinjam via Kilimanoor, Thekkada, and Nedumangad.