Advertisement // Sponsor

Verified Partner
Loading sponsor...
Home/Infrastructure Projects/Kasarvadavali to Kharbav Alignment R1

Kasarvadavali to Kharbav Alignment R1 Route Map & Status

The Kasarvadavali to Kharbav Alignment R1 is a proposed ~10 km road and bridge corridor connecting Kasarvadavali on Thane's Ghodbunder Road across the Ulhas River to Kharbav in Bhiwandi. It creates a vital new link between Thane West and the Bhiwandi warehouse logistics cluster.

कासारवडवली ते खारबाव अलाइनमेंट R1 (उल्हास नदी पूल)

ठाणे घोडबंदर रोडवरील कासारवडवली येथून उल्हास नदी ओलांडून भिवंडीतील खारबावला जोडणारा सुमारे १० किमीचा रस्ता व पूल ठाणे आणि भिवंडी लॉजिस्टिक हब दरम्यान थेट संपर्क निर्माण करेल.

Project Status: Proposed & Review StagesThe Alignment R1 option is being analyzed for creek bridge spans. Environmental studies and wetlands impact assessments are ongoing.
Proposed LengthEstimated ~10 km
Proposed CostTBD
Proposed Lanes6 Lanes
AgencyMMRDA
Current StatusProposed & Review Stages

Kasarvadavali to Kharbav Alignment R1 Latest Update

MMRDA is finalizing the Detailed Project Report for the alignment. Geotechnical investigations for the Ulhas River bridge piers are being organized to determine the rock stratum depth.

Local coordination committees are reviewing the land requirements near the Kasarvadavali landing point. Clearance requests for coastal zone regulations (CRZ) are expected to be compiled shortly.

Kasarvadavali to Kharbav Alignment R1 Route Map & Alignment

The proposed road alignment begins near Kasarvadavali on Ghodbunder Road (Thane West), heads northward, crosses the Ulhas River/Creek, and connects to the Kharbav corridor in Bhiwandi.

Proposed Route Alignment
Kasarvadavali, ThaneSouth Terminal
Ulhas River Creek BridgeCreek Crossing
Kharbav, BhiwandiNorth Terminal

Advertisement // Sponsor

Verified Partner
Loading sponsor...
GIS Route alignment

Kasarvadavali to Kharbav Alignment R1 Route Map

Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Dossier Overview

Kasarvadavali to Kharbav Alignment R1 Key Facts

Proposed LengthEstimated ~10 km
Estimated CostTBD
Proposed Lanes6 Lanes
Proposed South EndKasarvadavali (Thane)
Proposed North EndKharbav (Bhiwandi)
Current StatusProposed & Review Stages
Historical Dossier

Kasarvadavali to Kharbav Alignment R1 Timeline

YearEvent
2023MMRDA approves proposal for Thane-Bhiwandi direct corridor options
2025Alignment option R1 selected for detailed engineering assessment
2026DPR and geotechnical investigations ongoing for creek crossing
Strategic Significance

Why Kasarvadavali to Kharbav Alignment R1 Matters

Proposed Thane–Bhiwandi Link

The proposed corridor bypasses congested city roads, saving commuters and logistics trucks significant travel time.

Proposed Connect to Kharbav Hub

Designed to provide direct arterial roadway access to Bhiwandi's massive warehouse and logistics parks.

Slashes Transit Times

Projected to cut travel times from Kasarvadavali to Kharbav from an estimated 45 minutes down to under 15 minutes.

Spurs Local Development

Projected to unlock residential and commercial potential along the Ulhas River northern banks.

Project Parameters

Kasarvadavali to Kharbav Alignment R1 Status & Specifications

ParameterDetails
Project NameKasarvadavali to Kharbav Alignment R1
Total Length10.0 km
Current StatusProposed & Review Stages
Estimated CostTBD
Proposed PhaseDPR & Feasibility Stage
Proposed LengthEstimated ~10 km
Connection NorthVirar–Alibaug Multimodal Corridor
Connection SouthGhodbunder Road / Thane Metro Line 4
Target CompletionEarly 2030s
Water Body CrossedUlhas River / Creek (Proposed)
Implementing AgencyMMRDA
Estimated CompletionEarly 2030s (projected)
Implementing AuthorityNHAI / State Highway Authority
Proposed North TerminalKharbav, Bhiwandi
Proposed South TerminalKasarvadavali, Thane

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Frequently Asked Questions

Kasarvadavali to Kharbav Alignment R1 FAQ

The Kasarvadavali–Kharbav project is an MMRDA road-and-creek-bridge link connecting Kasarvadavali in Thane with Kharbav in Bhiwandi. It is designed as a direct 3+3-lane connection between Ghodbunder Road and MSH-4 (Chinchoti–Anjur Phata Road).

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Last updated: June 2026 · Source: MMRDA planning division← Back to Directory

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement