Verified PartnerGaimukh Paygaon Bridge Route Map, Status & Latest Updates
The Gaimukh Paygaon Bridge is a proposed 6.5 km creek crossing bridge over Vasai Creek engineered by MMRDA, connecting Gaimukh on Ghodbunder Road in Thane with Paygaon in Vasai/Bhiwandi. The bridge will drastically bypass congested fountain junction bottlenecks and reduce transit time between Thane and western suburbs.
गायमुख पायगाव खाडी पूल (MMRDA)
ठाणे आणि वसई-विरार दरम्यान वसई खाडीवर एमएमआरडीए (MMRDA) द्वारे 6.5 किमी लांबीचा गायमुख पायगाव पूल उभारण्यात येत आहे. हा पूल घोडबंदर रस्त्यावरील वाहतूक कोंडी कमी करून वसई ते ठाणे प्रवास सुलभ करेल।
Gaimukh Paygaon Bridge Status & Latest Update
MMRDA is coordinating with forest authorities to clear the environmental clearances necessary for bridge pier locations on the creek banks.
Alignments for the landing roads at both ends are being refined in collaboration with district land authorities to ensure minimal property displacement.
Gaimukh Paygaon Bridge Route Map & Alignment
The proposed bridge starts on the south bank from Ghodbunder Road near Gaimukh, crosses Thane Creek, and lands at Paygaon village, connecting to Bhiwandi regional roads.
Advertisement // Sponsor
Verified PartnerGaimukh Paygaon Bridge Route Map
Advertisement // Sponsor
Verified PartnerGaimukh Paygaon Bridge Project Details
Gaimukh Paygaon Bridge Timeline
| Year | Event |
|---|---|
| 2023 | MMRDA approves the Gaimukh-Paygaon creek crossing feasibility proposal |
| 2025 | DPR prepared and administrative approval secured by Maharashtra Govt |
| 2026 | Environmental clearance requests filed and under active appraisal |
| 2029 | Projected target for bridge completion |
Why the Gaimukh Paygaon Bridge Matters
Creates Direct Creek Bypass
Provides a new connection over Thane Creek, allowing traffic to bypass the congested urban areas of central Thane.
Bhiwandi Logistics Hub Access
Offers direct access to Bhiwandi warehouses, facilitating faster movement of goods between Thane/Mumbai and industrial sites.
Substantial Time Savings
Expected to cut down travel time between Gaimukh and Paygaon from 50 minutes down to less than 10 minutes.
Alleviates Highway Congestion
Decongests Ghodbunder Road by diverting Bhiwandi-bound traffic onto the new bridge alignment.
Gaimukh Paygaon Bridge Status & Specifications
| Parameter | Details |
|---|---|
| Project Name | Gaimukh Paygaon Bridge |
| Total Length | 1.5 km |
| Current Phase | Tendering & Land Acquisition Stage |
| Current Status | Tendering & Land Acquisition Stage |
| Estimated Cost | ~₹900 Crore |
| North Terminal | Paygaon, Bhiwandi |
| South Terminal | Gaimukh, Thane West |
| Proposed Length | ~1.5 km (bridge and approaches) |
| Connection North | Kharbav-Paygaon Road Link |
| Connection South | Ghodbunder Road |
| Target Completion | 2029 |
| Water Body Crossed | Thane Creek / Kalu River |
| Implementing Agency | MMRDA |
| Estimated Completion | 2029 (projected) |
| Implementing Authority | NHAI / State Highway Authority |
Thane Creek Bridge Project: Gaimukh Paygaon Bridge
The proposed Gaimukh Paygaon Bridge is a vital future addition to the broader Thane Creek Bridge Project network. Thane Creek acts as a major natural barrier separating Thane, Mumbai, and Navi Mumbai from the mainland logistics corridors of Bhiwandi and Kalyan. By constructing an indicative 1.5 km creek crossing structure from Gaimukh on Ghodbunder Road to Paygaon, this project establishes a direct northern transit bypass over the creek.
Unlike southern creek crossings such as the Vashi Creek Bridge (Sion-Panvel Highway) or the Airoli Bridge, which connect central Mumbai and Thane to Navi Mumbai, the Gaimukh-Paygaon link connects northern Thane directly with the Bhiwandi logistics hub. This proposed integration allows heavy commercial vehicles to bypass dense municipal zones entirely, routing transit freight straight onto the upcoming Virar–Alibaug Multimodal Corridor and Bhiwandi regional highways.
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerGaimukh Paygaon Bridge FAQ