Home/Infrastructure Projects/Ghodbunder Road Widening

Ghodbunder Road Widening Route Map, Status & Latest Updates

The Ghodabandar Gaimukh Road Project is an active capacity enhancement and elevated corridor project along Thane's Ghodbunder Road (SH-42) from Gaimukh to Fountain Hotel at the Western Express Highway junction. Spanning approx. 4.5 km, it bypasses major bottleneck sections through Sanjay Gandhi National Park foothills.

घोडबंदर गायमुख रस्ता रुंदीकरण व उन्नत मार्ग

ठाणे येथील घोडबंदर गायमुख ते फाउंटन हॉटेल दरम्यान ४.५ किमी लांबीचा उन्नत मार्ग व रस्ता रुंदीकरण प्रकल्प ठाणे व मीरा-भाईंदर मधील वाहतूक कोंडी दूर करण्यासाठी वेगाने सुरू आहे.

Project Status: Under Construction / ExecutionFlyover piling operations, foundation casting, and utility corridor shifting are actively progressing on site.
Length4.5 km
Cost₹1,000 Cr
Lanes6 Ground / 4 Elevated
AgencyMSRDC
StatusUnder Construction / Execution

Ghodbunder Road Status & Latest Update

Under MSRDC's supervision, foundation pillars for the elevated viaduct are being built along the hillsides of Ghodbunder. Retaining wall construction is underway near the creek-side stretches to widen ground level lanes.

Traffic management plans have been modified, restricting heavy container movements to designated hours to minimize peak-hour congestion during construction phases.

Ghodbunder Road Route Map & Alignment

The alignment follows the current Ghodbunder Road (SH-42) corridor, beginning from the Gaimukh octroi checkpoint area and ending at the Fountain Hotel interchange on NH-48.

Proposed Route Alignment
Gaimukh, Thane WestSouth Terminal
Elevated Viaduct SegmentFlyover Section
Fountain Hotel Junction / NH-48North Terminal

Advertisement // Sponsor

Verified Partner
Loading sponsor...
GIS Route alignment

Ghodbunder Road Widening Route Map

Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Dossier Overview

Ghodbunder Road Widening Key Facts

Proposed Length4.5 km
Estimated Cost~₹1,000 Crore
Proposed Lanes6 Ground / 4 Elevated
South EndGaimukh
North EndFountain Hotel (NH-48)
Current StatusUnder Construction / Execution
Historical Dossier

Ghodbunder Road Widening Timeline

YearEvent
2022Project conceptualised and DPR prepared by MSRDC
2024Bidding completed and administrative clearances obtained
2026 (Current)Active piling works and retaining wall structures under construction
2027 (Projected)Targeted corridor commissioning date
Strategic Significance

Why Ghodbunder Road Widening Matters

Eliminates Gaimukh Bottleneck

Resolves one of Thane's worst congestion spots where the highway narrows near the creek.

Facilitates Interstate Freight

Ensures smoother cargo transit from Mumbai/JNPT heading north toward Gujarat via NH-48.

Reduces Commute Times

Commuters travelling between Thane and Western suburbs (Borivali/Mira Road) will save up to 25 minutes.

Improves Road Safety

Separates heavy cargo trucks from local residential cars, lowering highway accident rates.

Project Parameters

Ghodbunder Road Widening Status & Specifications

ParameterDetails
Project NameGhodbunder Road Widening & Flyover
Total Length4.5 km
Current PhaseUnder Construction / Execution
Current StatusUnder Construction / Execution
Estimated Cost~₹1,000 Crore
North TerminalGhodbunder / Fountain Hotel Junction
South TerminalGaimukh, Thane
Proposed Length4.5 km
Connection NorthNH-48 (Delhi-Mumbai Highway)
Connection SouthThane City / Eastern Express Highway
Target Completion2027
Water Body CrossedThane Creek (adjacent)
Implementing AgencyMSRDC
Estimated Completion2027 (projected)
Implementing AuthorityNHAI / State Highway Authority

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Frequently Asked Questions

Ghodbunder Road Widening FAQ

The Ghodbunder–Gaimukh Road refers to the important Ghodbunder Road corridor in Thane connecting the Gaimukh area with the wider Ghodbunder Road network. The major ongoing widening work on the Thane-side section involves merging the existing main carriageway with service roads and reconstructing the road to increase capacity and reduce congestion.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Last updated: June 2026 · Source: MSRDC project division← Back to Directory

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement