Advertisement // Sponsor
Verified PartnerJhansi Link Expressway Route Map, Status & Latest Updates (2026)
The Jhansi Link Expressway is a 106.30 km access-controlled 6-lane greenfield highway (engineered to be expandable to 8 lanes) developed by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA).
Connecting the historical city of Jhansi to the Bundelkhand Expressway at Ch 170+200 near Phoolpura in Jalaun District, the corridor integrates Bundelkhand with Uttar Pradesh's high-speed expressway network. This dashboard provides the verified Jhansi Link Expressway route map, package-wise alignment, construction status, and latest news across Package I (Km 0–50) and Package II (Km 50–106.30) under a tender work period of 1,095 days.
The Jhansi Link Expressway project is rapidly advancing towards construction, with an L1 bid of ₹2206 Cr recently identified for a 50 KM 6-lane section and foundation-laying anticipated for October. This ₹7,968 crore initiative, designed to enhance connectivity to the BIDA and Defense Corridor, has also seen significant progress in land acquisition, with 85% of the required land secured by early August.
झांसी लिंक एक्सप्रेसवे
झांसी लिंक एक्सप्रेसवे क्षेत्रीय कनेक्टिविटी को बेहतर बनाने और प्रमुख एक्सप्रेसवे नेटवर्क से जोड़ने के लिए विकसित की जा रही एक महत्वपूर्ण सड़क परियोजना है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Jhansi Link Expressway Route Map & Alignment
Interactive route map of the 106.30 km UPEIDA Jhansi Link Expressway connecting Bundelkhand Expressway (Jalaun) to Jhansi and BIDA node.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerJhansi Link ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Lanes | 6 Lanes (Expandable to 8 Lanes) |
| Origin | Phoolpura (Ch 170+200 on Bundelkhand Expressway, Jalaun) |
| Destination | Ambabai / Jhansi (NH-44) |
| Design Speed | 120 km/h |
| Project Name | Jhansi Link Expressway |
| Total Length | 106.30 km |
| Civil Packages | 2 Packages (Package-1: 52.8 km, Package-2: 53.5 km) |
| Current Status | Under Construction / Execution |
| Estimated Cost | ₹7,968.30 Crore |
| Target Completion | 1,095 Days from Appointed Date |
| Completion Timeline | 1,095 Days from Appointed Date |
| Implementing Agency | UPEIDA |
| Implementing Authority | UPEIDA |
Packages & Districts Covered by Jhansi Link Expressway
Executed across two contiguous EPC civil construction packages in Bundelkhand.
Starts at Bundelkhand Expressway junction near Phoolpura and traverses Konch/Orai belt
Passes through Moth, Chirgaon, and BIDA industrial township to terminate at Ambabai (NH-44)
Jhansi Link Expressway Route & Package Alignment
The Jhansi Link Expressway originates at Ch 170+200 of the Bundelkhand Expressway near Phoolpura village in Jalaun district and runs 106.30 km southwest through Moth and Chirgaon tehsils to terminate near Ambabai on NH-44 in Jhansi district, serving the Bundelkhand Industrial Development Authority (BIDA) node.
Jhansi to Delhi & Lucknow Travel Time Reduction
Provides seamless 120 km/h expressway connectivity from Jhansi into the Bundelkhand, Agra–Lucknow, and Yamuna Expressways, cutting Jhansi–Delhi and Jhansi–Lucknow travel time to 4–5 hours.
Jhansi Link Expressway (झांसी लिंक एक्सप्रेसवे) Overview
झांसी लिंक एक्सप्रेसवे उत्तर प्रदेश में क्षेत्रीय संपर्क को मजबूत करने और प्रमुख एक्सप्रेसवे नेटवर्क से तेज़ जुड़ाव प्रदान करने के लिए विकसित किया जा रहा एक महत्वपूर्ण एक्सप्रेसवे कॉरिडोर है। Developed by UPEIDA, it anchors the new Bundelkhand Industrial Development Authority (BIDA) hub and UP Defence Industrial Corridor node in Jhansi.
- 106.30 km 6-lane greenfield corridor (expandable to 8 lanes) with ₹7,968.30 Crore capital outlay
- Divided into 2 EPC civil packages with 90% land acquisition and 30% construction progress
- Direct high-speed link for BIDA (New Noida-style industrial township in Jhansi) and Defence Corridor
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Jhansi Link Expressway is an upcoming 106.30 km, 4/6-lane (expandable to 8 lanes) access-controlled greenfield expressway developed by UPEIDA. It provides direct high-speed connectivity between the Bundelkhand Expressway and the Jhansi region, directly serving the Bundelkhand Industrial Development Authority (BIDA) and the UP Defence Industrial Corridor.
UPEIDA has divided the 106.30 km expressway into two distinct EPC civil construction packages: • Part 1 (Package 1): Spans 50.00 km from km 0.000 (Bundelkhand Expressway interchange near Phulpura, Jalaun) to km 50.000 (Garautha/Moth border). • Part 2 (Package 2): Spans 56.30 km from km 50.000 to km 106.300 near Ambabai on NH-44 at the BIDA industrial city boundary (Jhansi district).
Part 1 covers a 50 km greenfield stretch starting at km 170+300 of the Bundelkhand Expressway near Phulpura in Jalaun district. It includes major trumpet interchanges, toll plazas, and vehicular underpasses passing through the tehsils of Moth and northern Garautha.
Part 2 covers 56.30 km from km 50.000 to km 106.300, terminating at NH-44 near Ambabai. This southern section is the vital logistics spine providing direct freight connectivity into the upcoming 35,000-acre BIDA smart city and the Jhansi node of the Defence Corridor.
The expressway connects the Bundelkhand Expressway (Jalaun) with NH-44 (Ambabai, Jhansi). You can explore the interactive GIS satellite alignment map, package boundary coordinates, and interchange points directly on InfraCapitalist.
The Uttar Pradesh Cabinet approved the project with an estimated outlay of ₹7,968.30 crore. UPEIDA has processed technical EPC bids for both Package 1 and Package 2, and on-ground construction is slated to commence following final contract awards.
The expressway traverses Jalaun and Jhansi districts, cutting across the tehsils of Moth, Garautha (near Erach), Tahrauli, and Jhansi Sadar before converging near the BIDA industrial area at Ambabai.
The expressway has a total length of 106.30 km and an overall Cabinet-approved cost of ₹7,968.30 crore, which includes land acquisition, civil construction across both packages, and interchange infrastructure.
The EPC construction period is specified as 1,095 days (approximately three years). The expected completion date will depend on the final contract award and commencement of construction.
यूपीडा (UPEIDA) ने 106.30 किमी लंबे झांसी लिंक एक्सप्रेसवे के निर्माण को 2 मुख्य भागों (ईपीसी पैकेजों) में बांटा है: 1. भाग 1 (पैकेज 1): किमी 0.00 से किमी 50.00 (50 किमी) – जालौन जिले में बुंदेलखंड एक्सप्रेसवे (फूलपुरा) से गरोठा/मोठ तहसील सीमा तक। 2. भाग 2 (पैकेज 2): किमी 50.00 से किमी 106.30 (56.30 किमी) – गरोठा सीमा से टहरौली और झांसी सदर होते हुए एनएच-44 पर अम्बाबाई (बीडा क्षेत्र) तक।
भाग 1 बुंदेलखंड एक्सप्रेसवे के किमी 170+300 (फूलपुरा, जालौन) से शुरू होता है और 50 किमी तक फैला है। यह सेक्शन मुख्य रूप से बुंदेलखंड एक्सप्रेसवे से ट्रैफिक को झांसी और गरोठा क्षेत्र की ओर डायवर्ट करने के लिए इंटरचेंज और फ्लाईओवर प्रदान करेगा।
भाग 2 (किमी 50 से 106.30) गरोठा से शुरू होकर अम्बाबाई (NH-44) पर समाप्त होता है। यह हिस्सा 35,000 एकड़ के बीडा (BIDA) स्मार्ट इंडस्ट्रियल सिटी और झांसी डिफेंस कॉरिडोर को सीधी कनेक्टिविटी देगा, जिससे भारी उद्योगों और माल ढुलाई को सीधा लाभ मिलेगा।
उत्तर प्रदेश कैबिनेट ने इस परियोजना के लिए ₹7,968.30 करोड़ की मंजूरी दी है। यूपीडा ने दोनों पैकेजों के लिए टेंडर प्रक्रिया शुरू की है। निर्माण की वास्तविक शुरुआत अंतिम ठेका आवंटन और कार्य प्रारंभ होने पर निर्भर करेगी।
यह एक्सप्रेसवे बुंदेलखंड औद्योगिक विकास प्राधिकरण (BIDA) और झांसी डिफेंस कॉरिडोर के लिए मुख्य लॉजिस्टिक्स लाइफलाइन बनेगा, जिससे झांसी से दिल्ली, कानपुर और लखनऊ की दूरी और यात्रा समय में कमी आने की उम्मीद है।
Related Infrastructure Projects
Ganga Expressway
A major 594 km greenfield access-controlled expressway connecting Meerut and Prayagraj in Uttar Pradesh.
View Project →Kanpur–Kabrai Expressway
A ₹7,145 crore greenfield highway project connecting Kanpur and Kabrai to halve travel times across Uttar Pradesh.
View Project →Lucknow–Kanpur Expressway
An advanced 63 km corridor (NE-6 / Awadh Expressway) slashing travel times between Lucknow and Kanpur to 45 minutes.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.