The Bangalore Malappuram Highway Corridor is a proposed interstate economic corridor designed to link Bengaluru, Karnataka with Malappuram in northern Kerala via Mysore and the Western Ghats. Planned under Bharatmala Pariyojana by NHAI, the high-speed corridor aims to provide an alternate commercial trade route between Karnataka and North Malabar.
"The Bangalore Malappuram Highway project is currently experiencing significant delays, with construction stalled due to persistent alignment uncertainty concerning NH 966B. This follows a major NH-66 stretch collapse in Malappuram earlier this year, which led to the suspension of the project director, transfer"
ಬೆಂಗಳೂರು–ಮಲಪ್ಪುರಂ ಹೆದ್ದಾರಿ / ബാംഗ്ലൂർ മലപ്പുറം ഹൈവേ
ಕರ್ನಾಟಕದ ರಾಜಧಾನಿ ಬೆಂಗಳೂರು ಮತ್ತು ಕೇರಳದ ಮಲಪ್ಪುರಂ ನಡುವೆ ಎನ್ಎಚ್ಎಐ ಪ್ರಸ್ತಾಪಿಸಿರುವ ಪ್ರಮುಖ ಆರ್ಥಿಕ ಹೆದ್ದಾರಿ ಯೋಜನೆಯಾಗಿದ್ದು, ಅಂತರರಾಜ್ಯ ವಾಣಿಜ್ಯ ಮತ್ತು ಪ್ರಯಾಣದ ಸಮಯವನ್ನು ಗಮನಾರ್ಹವಾಗಿ ಕಡಿಮೆ ಮಾಡುತ್ತದೆ.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Bangalore Malappuram Highway Route Map & Alignment
View and download the latest Bangalore Malappuram Highway route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerBangalore Malappuram HighwayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Project Name | Bangalore Malappuram Highway |
| Total Length | 280 km |
| Estimated Cost | ₹12,000 Crore |
| Expected Completion Date | 2030 (Proposed) |
| Total Packages | 1 Package |
Advertisement // Sponsor
Verified PartnerLatest Developments
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Bengaluru–Malappuram Highway is associated with the proposed Bengaluru–Malappuram Economic Corridor, intended to improve road connectivity between Bengaluru in Karnataka and Malappuram in northern Kerala. Government announcements have described a 323-km corridor, including about 72 km in Kerala. However, the corridor should not be presented as a single completed or fully under-construction highway project because its overall alignment and implementation have evolved over time.
The Bengaluru–Malappuram corridor is intended to provide a faster road connection between Bengaluru and northern Kerala through the Mysuru–Wayanad–Nilambur/Malappuram region. Existing road connectivity broadly follows the Bengaluru–Mysuru–Gundlupet–Wayanad/Nilgiri–Nilambur–Malappuram direction, but the final alignment of the proposed economic corridor should not be treated as identical to the present driving route.
A Bengaluru–Malappuram highway map should be treated as a proposed economic-corridor alignment rather than a finalized construction map. Government discussions have considered alternative connections in the Wayanad–Malappuram region, including Tholpetti–Purakkattiri and Sulthan Bathery–Malappuram, partly to address the existing NH 766 route through Bandipur. The final corridor map should therefore be based on the latest official alignment documents when released.
The overall Bengaluru–Malappuram Economic Corridor alignment has not been sufficiently documented in current public official sources to justify publishing a fixed village-by-village alignment as final. In 2022, Karnataka and Kerala discussed alternative alignments including Tholpetti–Purakkattiri and Sulthan Bathery–Malappuram. These were proposals under discussion, not confirmation of a final approved corridor alignment.
The length publicly stated for the Bengaluru–Malappuram Economic Corridor is approximately 323 km, of which about 72 km was stated to fall within Kerala. This figure comes from the 2022 government announcement and should be described as the announced corridor length rather than a currently verified final construction length.
The project cost publicly announced for the Bengaluru–Malappuram corridor was ₹7,134 crore, with the same 2022 announcement describing the corridor as 323 km long. Because the corridor's alignment and implementation scope have not been established as a current final construction package, ₹7,134 crore should be presented as the announced/estimated project cost rather than a current sanctioned construction cost.
There is no reliable basis to describe the entire Bengaluru–Malappuram corridor as being under construction. The Bengaluru–Mysuru six-laning project was identified by MoRTH as part of the Bengaluru–Malappuram Economic Corridor, and that Bengaluru–Mysuru section was separately taken forward with its own project scope. This should not be interpreted as construction of the entire Bengaluru–Malappuram corridor.
The Bengaluru–Malappuram corridor should currently be described as a proposed economic-corridor initiative rather than a fully operational or fully constructed highway. Historical government announcements established the 323-km concept and ₹7,134-crore estimate, while subsequent discussions focused on alternative alignments in Karnataka and Kerala. A definitive current construction status for the entire corridor is not supported by the available official records.
The most important recent context is that the Bengaluru–Malappuram corridor continues to be associated with the broader Mysuru–Malappuram economic-corridor concept, while the alignment through the Wayanad and northern Kerala side has been subject to discussions because of the ecological and traffic restrictions affecting NH 766 through Bandipur. The 2022 inter-state discussions proposed alternative connections including Tholpetti–Purakkattiri and Sulthan Bathery–Malappuram, but these should not be described as a finalized current alignment.
The proposed corridor is intended to strengthen road connectivity between Bengaluru and northern Kerala and improve movement of passengers and freight between the two states. Its strategic importance is also linked to the limitations of the existing NH 766 route through Bandipur, where restrictions apply because the highway passes through an ecologically sensitive tiger-reserve area.
Related Infrastructure Projects
Kochi Metro
A rapid transit system serving Kochi, currently constructing the Phase 2 Pink Line Kakkanad extension.
View Project →Anakampoyil Kalladi Meppadi Tunnel Road
A proposed 8.7 km twin-tube underground tunnel road to connect Kozhikode and Wayanad, bypassing Thamarassery Ghat.
View Project →Mysuru Kushalnagar Expressway
A 4-lane access-controlled highway project extending the Bengaluru-Mysuru Expressway to Kushalnagar in Kodagu.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.