Advertisement // Sponsor
Verified PartnerLucknow Metro Red Line (CCS Airport - Munshipulia) Route Map, Stations & Status
Lucknow Metro Red Line (Line 1 / North-South Corridor) is a 22.878 km fully operational mass rapid transit corridor connecting CCS Airport in the south to Munshipulia in the north across 21 stations (17 elevated, 4 underground). Built by UPMRC, the line provides direct connections to Lucknow Charbagh Railway Station, the UP State Secretariat, Hazratganj commercial center, Lucknow University, and Alambagh Bus Station.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Lucknow Metro Red Line (CCS Airport - Munshipulia) Economics
Lucknow Metro Red Line (CCS Airport - Munshipulia) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | CCS Airport | Underground | Chaudhary Charan Singh International Airport (near Terminal 2) | 8 March 2019 |
| 02 | Amausi | Elevated | Amausi Industrial Node | 8 March 2019 |
| 03 | Transport Nagar | Elevated | Transport Nagar Depot Access | 5 September 2017 |
| 04 | Krishna Nagar | Elevated | Kanpur Road Residential | 5 September 2017 |
| 05 | Singar Nagar | Elevated | Alambagh South | 5 September 2017 |
| 06 | Alambagh | Elevated | Alambagh Market | 5 September 2017 |
| 07 | Alambagh Bus Station | Elevated | Alambagh ISBT Bus Terminal (Skywalk Access) | 5 September 2017 |
| 08 | Mawaiya | Elevated | Mawaiya Railway Flyover Span | 5 September 2017 |
| 09 | Durgapuri | Elevated | Durgapuri Area | 5 September 2017 |
| 10 | Charbagh | Elevated | Lucknow Charbagh Railway Station & Future Phase 1B Interchange | 5 September 2017 |
| 11 | Hussainganj | Underground | Hussainganj Commercial Core | 8 March 2019 |
| 12 | Sachivalaya | Underground | UP Government Secretariat / Vidhan Sabha | 8 March 2019 |
| 13 | Hazratganj | Underground | Hazratganj Heritage & Shopping District | 8 March 2019 |
| 14 | KD Singh Babu Stadium | Elevated | KD Singh Babu Stadium | 8 March 2019 |
| 15 | Lucknow University / Vishwavidyalaya | Elevated | University of Lucknow Main Campus | 8 March 2019 |
| 16 | IT Chauraha | Elevated | Isabella Thoburn College | 8 March 2019 |
| 17 | Badshah Nagar | Elevated | Badshah Nagar Railway Station | 8 March 2019 |
| 18 | Lekhraj Market | Elevated | Lekhraj Commercial Area | 8 March 2019 |
| 19 | Bhootnath Market | Elevated | Bhootnath Market | 8 March 2019 |
| 20 | Indira Nagar | Elevated | Indira Nagar Colony | 8 March 2019 |
| 21 | Munshipulia | Elevated | Munshipulia Terminal | 8 March 2019 |
Lucknow Metro Red Line (CCS Airport - Munshipulia) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerLucknow Metro Red Line (CCS Airport - Munshipulia) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹6,928 Cr |
| Corridor Type | Elevated Viaduct & Underground Twin Tunnels |
| Primary Depot | Transport Nagar Depot (Kanpur Road, 24.4 ha) |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 22.878 km |
| Opened / Est. Opening | Operational since 2019 (Full Corridor: 8 March 2019 | Priority Section: 5 Sept 2017) |
| Corridor Status | Fully Operational |
| Maximum Design Speed | 90 km/h |
| Operator | Uttar Pradesh Metro Rail Corporation Limited (UPMRC, formerly LMRC) |
| Stations Count | 21 Operational Stations (17 Elevated, 4 Underground) |
| Line Number | Line 1 (Red Line / North-South Corridor) |
| Rolling Stock | 20 Trainsets of 4-Car Alstom Metropolis |
| targetOpening | 8 March 2019 |
| Electrification System | 25 kV AC 50 Hz Overhead Catenary (OHE) |
| Government Monitoring Target | 8 March 2019 |
Lucknow Metro Red Line (CCS Airport - Munshipulia) Timeline
Lucknow Metro DPR approved in 2013; Government of India granted in-principle approval for Phase 1A in December 2013.
Civil construction commenced on priority section (Transport Nagar to Charbagh)
Priority section (8.5 km, 8 stations) inaugurated for passenger services
Entire 22.878 km Phase 1A corridor became operational on 8 March 2019.
Lucknow Metro Red Line (CCS Airport - Munshipulia) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
