Advertisement // Sponsor
Verified PartnerKolkata Metro Line 4 (Yellow Line — Operational Route: Noapara ↔ Jai Hind Airport)
Kolkata Metro Line 4 (Yellow Line - Operational Segment) spans 7.04 km (6.77 km commissioned commercial route) across 4 operational stations connecting Noapara terminal hub to Netaji Subhas Chandra Bose International Airport (Jai Hind). The corridor provides seamless mass transit linking the Line 1 Blue Line at Noapara and Eastern Railway suburban trains at Dum Dum Cantonment directly into the Kolkata Airport terminal building.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Kolkata Metro Line 4 (Yellow Line - Operational) Economics
Kolkata Metro Line 4 (Yellow Line - Operational) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Noapara | Elevated Terminal Hub | Line 1 Blue Line Interchange & Noapara Depot | 25 August 2025 |
| 02 | Dum Dum Cantonment | Elevated | Eastern Railway Suburban Rail Interchange | 25 August 2025 |
| 03 | Jessore Road | At-Grade | Jessore Road Highway Axis Node | 25 August 2025 |
| 04 | Jai Hind | Underground Terminal Hub | NSCBI Airport Terminal & Line 6 Orange Line Interchange | 25 August 2025 |
Noapara ↔ Jai Hind Airport Geospatial Alignment Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerKolkata Metro Line 4 (Yellow Line - Operational) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹3,750 Cr |
| Corridor Type | Elevated, At-Grade & Underground Airport Subterranean Terminal |
| Primary Depot | Noapara Metro Depot |
| Track Gauge | Broad Gauge (1,676 mm / 5 ft 6 in) |
| Total Length | 7.04 km Operational Route (6.77 km Commissioned Main-Line) |
| Opened / Est. Opening | 22 Aug 2025 (Inaugurated) | 25 Aug 2025 (Commercial Revenue Service) |
| Corridor Status | Fully Operational |
| Peak Headway | 18 – 21 min (120 weekday daily services; 92 Saturday services) |
| Operator | Metro Railway, Kolkata (Owner: Indian Railways / RVNL) |
| Stations Count | 4 Operational Stations (Noapara, Dum Dum Cantonment, Jessore Road, Jai Hind) |
| Daily Ridership | ~15,000+ Commuters & Airport Passengers Daily |
| Line Number | Line 4 (Yellow Line) |
| Signalling System | CBTC Signalling |
| Rolling Stock | ICF Standard & CRRC Dalian AC Rakes |
| Maximum Operating Speed | 80 km/h |
| Electrification System | 750V DC Third Rail |
Kolkata Metro Line 4 (Yellow Line - Operational) Timeline
Noapara to Barasat Line 4 corridor sanctioned by Ministry of Railways.
Senbo Engineering awarded ₹227 Cr civil contract for Airport section and Bagjola Canal alignment.
Railway Board sanctioned material modification converting Airport–Barasat alignment underground.
Subterranean integrated airport station construction commenced 150m from terminal building.
Noapara to Jai Hind (Biman Bandar) section inaugurated by Prime Minister Narendra Modi.
Commercial revenue services commenced from Noapara to Jai Hind Airport.
Yellow Line Airport Transit & Regional Connectivity Impact
Economic Significance
Provides Kolkata's first direct rail-to-airport mass transit link, connecting NSCBI Airport directly to North-South Kolkata.
Traffic Impact
Eliminates highway bottlenecks along VIP Road and Jessore Road, reducing travel time to the airport from 60 mins to 14 mins.
Employment Centres Served
Serves airline personnel, airport logistics staff, cargo workers, and IT professionals.
Intermodal Connectivity
Seamless interchange with Line 1 Blue Line at Noapara and future Line 6 Orange Line at Jai Hind Airport.
Impact on Real Estate
Sparked commercial transit-oriented development (TOD) interest across Dum Dum Cantonment and Jessore Road.
Kolkata Metro Line 4 (Yellow Line - Operational) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
