Kolkata Metro Line 2 (Green Line — Approved Extension: Salt Lake Sector V ↔ Teghoria)
Approved / Pre-Construction📏 6.65 km Approved Extension Route🚉 5 Planned Stations (5 Elevated) Stations🗓 Approved Extension Phase🏢 Metro Railway, Kolkata (Owner: Indian Railways / KMRC)
Kolkata Metro Line 2 (Green Line - Approved Extension Segment) is a sanctioned 6.65 km elevated extension across 5 stations (Krishnapur, Kestopur, Baguiati, Raghunathpur, Teghoria) connecting Salt Lake Sector V to Teghoria along VIP Road. This corridor extends the East-West Metro eastward from Sector V IT hub along VIP Road to create a crucial second interchange with Line 6 Orange Line at Teghoria.
FEATURED PARTNER
ADVERTISEMENT
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Line 2 (Green Line Extension Approved) Economics
Kolkata Metro Line 2 (Green Line Extension Approved) Economics
Total InvestmentSanctioned Extension Budget Allocation
Primary BackersMinistry of Railways & State Government Joint Equity
Operator / ModelKolkata Metro Rail Corporation Limited (KMRC) Execution
Target Opening
Expected Completion Date
StatusApproved / Pre-Construction
Target Opening DateApproved Extension Phase
Station list
Kolkata Metro Line 2 (Green Line Extension Approved) Stations
#
Station
Type
Interchange / Connection
Opened
01
Salt Lake Sector V
Elevated Operational Hub
Operational Line 2 Terminal & Line 6 Orange Line
13 Feb 2020
02
Krishnapur
Elevated (Approved)
Kestopur Canal & VIP Road South Node
—
03
Kestopur
Elevated (Approved)
Kestopur VIP Road Junction Axis
—
04
Baguiati
Elevated (Approved)
Baguiati Junction Commercial & Retail Zone
—
05
Raghunathpur
Elevated (Approved)
Raghunathpur Precinct Node
—
06
Teghoria
Elevated Terminal (Approved)
Line 6 Orange Line Interchange at VIP Road
—
Geospatial Alignment
Salt Lake Sector V ↔ Teghoria Approved Extension Alignment Map
Advertisement // Sponsor
Verified Partner
Loading sponsor...
Loading GIS Map Environment...
Advertisement // Sponsor
Verified Partner
Loading sponsor...
Specs sheet
Kolkata Metro Line 2 (Green Line Extension Approved) Technical Specifications
Parameter
Value
Estimated Cost
Sanctioned Phase
Corridor Type
Elevated Viaduct Corridor along VIP Road Axis
Primary Depot
Central Park Depot (Salt Lake)
Track Gauge
Standard Gauge (1,435 mm)
Total Length
6.65 km Approved Extension Route
Opened / Est. Opening
Approved Extension Phase
Corridor Status
Approved / Pre-Construction
Operator
Metro Railway, Kolkata (Owner: Indian Railways / KMRC)
Stations Count
5 Planned Stations (5 Elevated)
Line Number
Line 2 (Green Line Extension)
Signalling System
CBTC Signalling System
Rolling Stock
BEML Standard Gauge Rakes
Electrification System
750V DC Third Rail
Target Completion
Approved Extension Phase
Chronological Milestones
Kolkata Metro Line 2 (Green Line Extension Approved) Timeline
Sanctioned
Line 2 eastern extension from Salt Lake Sector V to Teghoria approved by Ministry of Railways.
DPR Stage
Alignment survey and station land demarcation conducted along VIP Road passing Krishnapur, Kestopur, Baguiati, Raghunathpur, and Teghoria.
Proprietary analytics
Green Line VIP Road Corridor Transit & Regional Economic Impact
Economic Significance
Links the Salt Lake Sector V IT SEZ directly to Kestopur, Baguiati, Raghunathpur, and Teghoria along VIP Road.
Traffic Impact
Reduces heavy traffic congestion on VIP Road and Kestopur flyover, linking North-East Kolkata directly to Howrah and Sealdah.
Employment Centres Served
Serves suburban daily commuters and IT professionals traveling between VIP Road residential hubs and Sector V.
Intermodal Connectivity
Establishes a vital dual-interchange network with Line 6 Orange Line at Sector V and Teghoria.
Impact on Real Estate
Boosted commercial development and real estate demand in Kestopur, Baguiati, and Teghoria.
Geospatial Explorer
Kolkata Metro Line 2 (Green Line Extension Approved) Alignment Map & GIS Explorer
Corridor Type Breakdown6.65 km Elevated Viaduct (5 Stations)
Viaduct Length6.65 km Elevated Viaduct
Tunnel LengthN/A
River CrossingsKestopur Canal Extension Bridge
Major Bridges / CrossingsVIP Road Overpass Bridge
Primary DepotCentral Park Depot (Salt Lake)
Advertisement // Sponsor
Verified Partner
Loading sponsor...
Advertisement // Sponsor
Verified Partner
Loading sponsor...
Answers
Frequently Asked Questions
The Kolkata Metro Green Line extension is the approved 6.65 km extension of Line 2 from Salt Lake Sector V to Teghoria (Haldiram) along the VIP Road corridor. It includes five planned stations.
The Green Line extension route runs eastward from Salt Lake Sector V through Krishnapur, Kestopur, Baguiati and Raghunathpur to Teghoria.
The five planned Green Line extension stations are Krishnapur, Kestopur, Baguiati, Raghunathpur and Teghoria. The extension starts from the existing Salt Lake Sector V station.
The Green Line extension map covers the 6.65 km corridor from Salt Lake Sector V to Teghoria along the VIP Road axis, passing through Krishnapur, Kestopur, Baguiati and Raghunathpur.
The Green Line extension project extends the East-West Metro from its current Salt Lake Sector V terminal toward Teghoria. The approved corridor is approximately 6.65 km long with five planned stations.
The Salt Lake Sector V–Teghoria Green Line extension is an approved extension, not a fully operational or established construction section. Earlier government documents reported that the project was held up over cost-sharing consent between the West Bengal government and the Ministry of Railways.
The 6.65 km Salt Lake Sector V–Teghoria extension remains an approved project. The latest government material available for the project has highlighted cost-sharing issues rather than full-scale construction progress.
The Green Line expansion to Teghoria is the proposed eastward extension from Salt Lake Sector V along VIP Road. It is planned to add five stations: Krishnapur, Kestopur, Baguiati, Raghunathpur and Teghoria.
The Salt Lake Sector V–Teghoria corridor is sometimes referred to informally as a later phase of the Green Line. However, the project information identifies it as the Green Line extension rather than an officially named 'Phase 2' corridor.
The approved Green Line extension from Salt Lake Sector V to Teghoria is approximately 6.65 km long.
The planned stations between Salt Lake Sector V and Teghoria are Krishnapur, Kestopur, Baguiati and Raghunathpur, followed by the terminal station at Teghoria.
The planned Teghoria terminal is intended to provide an interchange with the Orange Line corridor along VIP Road, creating a connection between the Green Line and the wider airport and New Town-oriented Metro network.