METRO CORRIDOR DOSSIER // KOLKATA-METRO-GREEN-LINE-APPROVED-EXTENSION

Kolkata Metro Line 2 (Green Line — Approved Extension: Salt Lake Sector V ↔ Teghoria)

Approved / Pre-Construction📏 6.65 km Approved Extension Route🚉 5 Planned Stations (5 Elevated) Stations🗓 Approved Extension Phase🏢 Metro Railway, Kolkata (Owner: Indian Railways / KMRC)

Kolkata Metro Line 2 (Green Line - Approved Extension Segment) is a sanctioned 6.65 km elevated extension across 5 stations (Krishnapur, Kestopur, Baguiati, Raghunathpur, Teghoria) connecting Salt Lake Sector V to Teghoria along VIP Road. This corridor extends the East-West Metro eastward from Sector V IT hub along VIP Road to create a crucial second interchange with Line 6 Orange Line at Teghoria.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Line 2 (Green Line Extension Approved) Economics

Kolkata Metro Line 2 (Green Line Extension Approved) Economics

Total InvestmentSanctioned Extension Budget Allocation
Primary BackersMinistry of Railways & State Government Joint Equity
Operator / ModelKolkata Metro Rail Corporation Limited (KMRC) Execution
Target Opening

Expected Completion Date

StatusApproved / Pre-Construction
Target Opening DateApproved Extension Phase
Station list

Kolkata Metro Line 2 (Green Line Extension Approved) Stations

#StationTypeInterchange / ConnectionOpened
01
Salt Lake Sector V
Elevated Operational HubOperational Line 2 Terminal & Line 6 Orange Line13 Feb 2020
02
Krishnapur
Elevated (Approved)Kestopur Canal & VIP Road South Node—
03
Kestopur
Elevated (Approved)Kestopur VIP Road Junction Axis—
04
Baguiati
Elevated (Approved)Baguiati Junction Commercial & Retail Zone—
05
Raghunathpur
Elevated (Approved)Raghunathpur Precinct Node—
06
Teghoria
Elevated Terminal (Approved)Line 6 Orange Line Interchange at VIP Road—
Geospatial Alignment

Salt Lake Sector V ↔ Teghoria Approved Extension Alignment Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Kolkata Metro Line 2 (Green Line Extension Approved) Technical Specifications

ParameterValue
Estimated CostSanctioned Phase
Corridor TypeElevated Viaduct Corridor along VIP Road Axis
Primary DepotCentral Park Depot (Salt Lake)
Track GaugeStandard Gauge (1,435 mm)
Total Length6.65 km Approved Extension Route
Opened / Est. OpeningApproved Extension Phase
Corridor StatusApproved / Pre-Construction
OperatorMetro Railway, Kolkata (Owner: Indian Railways / KMRC)
Stations Count5 Planned Stations (5 Elevated)
Line NumberLine 2 (Green Line Extension)
Signalling SystemCBTC Signalling System
Rolling StockBEML Standard Gauge Rakes
Electrification System750V DC Third Rail
Target CompletionApproved Extension Phase
Chronological Milestones

Kolkata Metro Line 2 (Green Line Extension Approved) Timeline

Sanctioned

Line 2 eastern extension from Salt Lake Sector V to Teghoria approved by Ministry of Railways.

DPR Stage

Alignment survey and station land demarcation conducted along VIP Road passing Krishnapur, Kestopur, Baguiati, Raghunathpur, and Teghoria.

Proprietary analytics

Green Line VIP Road Corridor Transit & Regional Economic Impact

Economic Significance

Links the Salt Lake Sector V IT SEZ directly to Kestopur, Baguiati, Raghunathpur, and Teghoria along VIP Road.

Traffic Impact

Reduces heavy traffic congestion on VIP Road and Kestopur flyover, linking North-East Kolkata directly to Howrah and Sealdah.

Employment Centres Served

Serves suburban daily commuters and IT professionals traveling between VIP Road residential hubs and Sector V.

Intermodal Connectivity

Establishes a vital dual-interchange network with Line 6 Orange Line at Sector V and Teghoria.

Impact on Real Estate

Boosted commercial development and real estate demand in Kestopur, Baguiati, and Teghoria.

Geospatial Explorer

Kolkata Metro Line 2 (Green Line Extension Approved) Alignment Map & GIS Explorer

Corridor Type Breakdown6.65 km Elevated Viaduct (5 Stations)
Viaduct Length6.65 km Elevated Viaduct
Tunnel LengthN/A
River CrossingsKestopur Canal Extension Bridge
Major Bridges / CrossingsVIP Road Overpass Bridge
Primary DepotCentral Park Depot (Salt Lake)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Kolkata Metro Green Line extension is the approved 6.65 km extension of Line 2 from Salt Lake Sector V to Teghoria (Haldiram) along the VIP Road corridor. It includes five planned stations.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement