Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // KOLKATA-METRO-PURPLE-LINE-PROPOSED-BRANCH

Kolkata Metro Line 3 (Purple Line — Proposed Branch: Mahanayak Uttam Kumar ↔ Diamond Park)

Proposed & Review Stages📏 8.50 km Proposed Route🚉 4 Planned Stations (3 Underground, 1 Interchange) Stations🗓 Proposed Branch Phase🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 3 (Purple Line - Proposed Branch Segment) is a proposed 8.50 km branch corridor across 4 planned stations connecting Diamond Park / Thakurpukur on Line 3 to Mahanayak Uttam Kumar (Tollygunge) on Line 1 Blue Line. The proposed DPR route along Mahatma Gandhi Road includes three underground stations at Thakurpukur Cancer Hospital, Ramchandrapur, and Panchanantala.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Line 3 (Purple Line Proposed Branch) Economics

Kolkata Metro Line 3 (Purple Line Proposed Branch) Economics

Total InvestmentDPR Proposed Project Expense Estimate
Primary BackersProposed Ministry of Railways & State Government Joint Equity
Operator / ModelRail Vikas Nigam Limited (RVNL) Proposed Execution
Target Opening

Expected Completion Date

StatusProposed & Review Stages
Target Opening DateProposed Branch Phase
Station list

Kolkata Metro Line 3 (Purple Line Proposed Branch) Stations

#StationTypeInterchange / ConnectionOpened
01
Diamond Park
Elevated Branch Junction (Approved/Proposed)Purple Line Main-Line Junction Node—
02
Thakurpukur Cancer Hospital
Underground (Proposed)Saroj Gupta Cancer Centre Node—
03
Ramchandrapur
Underground (Proposed)Ramchandrapur Suburb Node—
04
Panchanantala
Underground (Proposed)Panchanantala Residential Precinct—
05
Mahanayak Uttam Kumar
Elevated Interchange (Proposed)Line 1 Blue Line Interchange at Tollygunge—
Geospatial Alignment

Mahanayak Uttam Kumar (Tollygunge) ↔ Diamond Park Proposed Branch Alignment Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Kolkata Metro Line 3 (Purple Line Proposed Branch) Technical Specifications

ParameterValue
Estimated CostDPR Proposed
Corridor TypeUnderground Tunneling & Elevated Viaduct along MG Road
Primary DepotJoka Metro Depot
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Total Length8.50 km Proposed Route
Opened / Est. OpeningProposed Branch Phase
Corridor StatusProposed & Review Stages
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Stations Count4 Planned Stations (3 Underground, 1 Interchange)
Line NumberLine 3 Branch (Tollygunge – Diamond Park)
Signalling SystemCBTC Signalling System
Rolling StockICF MEDHA Broad Gauge AC Rakes
Electrification System750V DC Third Rail
Target CompletionProposed Branch Phase
Chronological Milestones

Kolkata Metro Line 3 (Purple Line Proposed Branch) Timeline

25 March 2025

Metro Railway sent formal proposal to Ministry of Railways for 8.50 km Diamond Park to Tollygunge branch corridor.

DPR Review

Alignment survey and underground station location planning along Mahatma Gandhi Road.

Proprietary analytics

Purple Line Branch Corridor & Tollygunge Cross-Town Transit Impact

Economic Significance

Creates a vital cross-town arterial connection between the Line 1 Blue Line at Tollygunge and Line 3 Purple Line at Thakurpukur.

Traffic Impact

Expected to relieve dense vehicular gridlocks along Mahatma Gandhi Road (MG Road Kolkata).

Employment Centres Served

Serves daily suburban commuters, medical staff, cancer hospital patients, and university students.

Intermodal Connectivity

Establishes direct single-interchange connectivity between Tollygunge, Joka, and Behala.

Impact on Real Estate

Sparked commercial real estate and residential redevelopment interest along MG Road.

Geospatial Explorer

Kolkata Metro Line 3 (Purple Line Proposed Branch) Alignment Map & GIS Explorer

Corridor Type Breakdown8.50 km (Underground Tunnels & Viaduct)
Viaduct LengthElevated Viaduct Spans along MG Road
Tunnel LengthUnderground Cut-and-Cover / TBM Tunnels
River CrossingsCanal Bridges along MG Road
Major Bridges / CrossingsN/A
Primary DepotJoka Metro Depot

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The proposed branch of Kolkata Metro Purple Line (Line 3) spans 8.50 km across 4 stations (Thakurpukur Cancer Hospital, Ramchandrapur, Panchanantala, Mahanayak Uttam Kumar).

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement